What's new

CV-18 Fujian - Type 003 Aircraft Carrier News & Discussions

S

o

I dont think so soon because basin is not ready yet. All the super blocks also have not been constructed. I think it would take almost 6 to 7 months till it is launched.

Sorry, can't catch what you are trying to imply. Launch? Module block transfer? or new module block fabrication?
 
Both Module blocks have moved. Note that the first component for the 3rd module has been hoisted into place. And the dredging of the harbour basin is in well progress.

003 20190720.jpg
003 20190720b.jpg
 
Last edited:
Via Bltizo/SDF aka @RickJoe_PLART

"GE updated JNCX, with imagery from 10th March.

We are finally able to measure the beam of 003 directly rather than having to measure a secondary object to extrapolate its beam."
I consistently measure between 40-41 meters on GE, which is similar to what the CSIS satellite imagery earlier this year measured."

003 10th march.jpg
 

Latest posts

Back
Top Bottom