ghazi52
PDF THINK TANK: ANALYST
- Joined
- Mar 21, 2007
- Messages
- 102,838
- Reaction score
- 106
- Country
- Location
Another good news from biggest hydropower Project of CPEC..
The steel Liner for Headrace Tunnel of Suki Kinari Hydropower Project has been completed today.
23.2km long headrace tunnel passing through difficult terrain and in poor geological section, Steel lining has been designed. 5.5m diameter steel cans have been fabricated in a straight of the art steel factory at site and mobilized in HRT for installation.
A total of 117 steel cans (each 3m long) were transported and fabricated inside the tunnel.
The steel Liner for Headrace Tunnel of Suki Kinari Hydropower Project has been completed today.
23.2km long headrace tunnel passing through difficult terrain and in poor geological section, Steel lining has been designed. 5.5m diameter steel cans have been fabricated in a straight of the art steel factory at site and mobilized in HRT for installation.
A total of 117 steel cans (each 3m long) were transported and fabricated inside the tunnel.