What's new

Bangladesh Navy

. .
Bangladesh Navy's new combat dress has been widely proliferated amongst sailors and officers now.

40847069_10204886679002913_1252922091448041472_n.jpg
41019721_10204886680642954_1891678702975057920_n.jpg
40805299_10204886679962937_5871135953359208448_n.jpg
41177746_10204886679722931_8218529674490281984_n.jpg
40773633_10204886679802933_6267810487048601600_n.jpg
40960966_10204886678882910_3682441080541806592_n.jpg
40841353_10204886678922911_1427618224060497920_n.jpg


Bangladesh Navy HQ's new gate.

40962641_10204886752244744_8674818251168940032_n.jpg


Hands of friendship... Indian Navy officer (wearing sun glasses) boards a Bangladesh Navy warship visiting India. Two Bangladesh Navy officers can be seen in the picture also.

41063118_10204886694763307_7649958321843077120_n.jpg



Bangladesh military getting different types of maritime aircraft. It points to strengthening the importance the military places on the Bay of Bengal today.

https://www.bdmilitary.com/defence-...d-forces-upping-maritime-aerial-capabilities/
 
.
#Made_In_Bangladesh

বাংলাদেশের প্রাইভেট কোম্পানি Ocean Electrical Limited এর নির্মিত Control Panel Console নির্মান করেছে।নির্মিত এই কন্ট্রোল প্যানেলটি কোস্টগার্ডের নতুন Padma Class OPV তে পরীক্ষামুলকভাবে স্থাপন করা হয়েছে।

কোস্টগার্ডের জন্য নির্মিত ৩ টি পদ্মা ক্লাস পেট্রোল ভেসেলে দেশে নির্মিত এই Console system বসানো হতে পারে।এর আগে বাংলাদেশ নৌবাহিনীর OPV তে চাইনিজ Control Panel Console বসানো হয়েছে।

#DTB

41286843_1865061003582324_1603485001549086720_n.jpg
 
.
Two coming as per tender .:-)
Ok first thing is the two Type 53H3 will come, for now all we can do is wait although @LKJ86 created some confusion about 521. @LKJ86 i think i have seen those photo you shared before, anyway 521 or any other frigate will come with 522 as those are being acquired as "Hot Purchase"

About the delayed 6 frigate project those are old news. The heavy crane didn't arrive yet, CDDL will be ready in two years. So two new frigate will come from China.
I don't think plan need to take back those frigate as China replacing them with more powerful frigate and corvette . We had tendered for two frigate apparently coming from same source . So this two patent no 521 and 522 coming unless anything unavailable circumstances. Moreover after our indigenous frigate program delayed it's more important to get thus frigate .



We could have install FN-3000N maybe.
Hull 521 is still in server, unlikely to be exported:
006vAw6Sgy1fv1soxczkvj31kw0w0que.jpg

006vAw6Sgy1fv1soxfffwj31kw0w01kx.jpg
 
Last edited:
. . .
Hmmm.

Maybe some issue with Hull 521. Whatever it was - I am not worried about refurbished hulls. I am worried however about the six new builds. Why does it take two years to fabricate/install a crane at CDDL? That question needs to be asked.
 
.
Hmmm.

Maybe some issue with Hull 521. Whatever it was - I am not worried about refurbished hulls. I am worried however about the six new builds. Why does it take two years to fabricate/install a crane at CDDL? That question needs to be asked.
Because these cranes are built on order.
Besides CDDL needs a full financial year to make procurement plan to issue a work order.
 
.
Castle Class Corvette of Bangladesh Navy firing C-704 Anti-Ship Missile.

41394946_1866980803390344_4088887845945606144_n.jpg


Hull 521 is still in server, unlikely to be exported:

it won't be like that for long. If china wanted to keep it in service for a long period of time then it would have changed its armaments by now.
 
.
Hmmm.

Maybe some issue with Hull 521. Whatever it was - I am not worried about refurbished hulls. I am worried however about the six new builds. Why does it take two years to fabricate/install a crane at CDDL? That question needs to be asked.
New dry dock is being built... fabrication plants are also being built... lot of work to be done... but maybe 2020... end of 2019... construction of the frigates will begin
 
. . . .
Hmmm.

Maybe some issue with Hull 521. Whatever it was - I am not worried about refurbished hulls. I am worried however about the six new builds. Why does it take two years to fabricate/install a crane at CDDL? That question needs to be asked.

this may be a good example of crane problem..... this is the result of an accident at Kolkata's GRSE....

"A new Goliath crane has a time-period of 30 months from issue of tender to installation and commissioning."
https://www.thehindubusinessline.co...rse-may-hurt-warship-work/article23740931.ece
 
.

Latest posts

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom