MirageBlue
FULL MEMBER
- Joined
- Mar 24, 2020
- Messages
- 1,118
- Reaction score
- 3
- Country
- Location
Tribune India is reporting (and so are others) that the numbers of new Indian fighters that the IAF has apparently finalised are 470
The breakdown is such:
1. 133 Tejas Mk1A fighters (first Mk1A on track for delivery to IAF in Feb 2024)
2. 108 Tejas Mk2 fighters
3. 126 AMCA fighters
4. 100 TEDBF for the Indian Navy
This is in addition to the 114 MRFA that the IAF is still hankering for and the 26 MRCBF (most likely Rafale M) for the IN.
HAL CMD had already indicated that HAL has been working on increasing manufacturing capacity to take up more than 16 Tejas Mk1A per year so that the original 83 Mk1As will be delivered ahead of schedule (!) and it'll create the gap for an additional order of 50 Tejas Mk1A after which the Tejas Mk2 deliveries will begin.
Absolute bonanza for GE since all these fighters (except for AMCA Mk2) are to be powered by the GE F-404 and F-414 series engines. No wonder they're happy to set up the assembly line in India for F-414 engines with so called 'ToT'.
The breakdown is such:
1. 133 Tejas Mk1A fighters (first Mk1A on track for delivery to IAF in Feb 2024)
2. 108 Tejas Mk2 fighters
3. 126 AMCA fighters
4. 100 TEDBF for the Indian Navy
This is in addition to the 114 MRFA that the IAF is still hankering for and the 26 MRCBF (most likely Rafale M) for the IN.
HAL CMD had already indicated that HAL has been working on increasing manufacturing capacity to take up more than 16 Tejas Mk1A per year so that the original 83 Mk1As will be delivered ahead of schedule (!) and it'll create the gap for an additional order of 50 Tejas Mk1A after which the Tejas Mk2 deliveries will begin.
India plans to make 470 jets, first to roll out in Feb next year
India is planning to manufacture 470 fighter jets, with the first one — Light Combat Aircraft (LCA) Tejas Mark-1A — to be rolled out in February next year. The massive project in already underway.
www.tribuneindia.com
Absolute bonanza for GE since all these fighters (except for AMCA Mk2) are to be powered by the GE F-404 and F-414 series engines. No wonder they're happy to set up the assembly line in India for F-414 engines with so called 'ToT'.