DATA FOR 2015 (standard completion)
Most diesel-electric submarine ("B"). Developed by CDB ME "Rubin", Chief Designer - Yu.N.Kormilitsyn. Research began in 1987 and was originally planned to build a large series of submarines at the "Leningrad Admiralty Association" (Leningrad), "Sevmash" (Severodvinsk), "Red Sormovo" (Nizhny Novgorod) and "Them. Lenin Komsomol "(Komsomolsk-on-Amur). The technical design of submarines pr.677 approved in 1993, but was sent for recycling. The second version of the technical design approved in 1997. When creating PL worked out 180 OCD. Development of the SJC initially charged with SRI "Okeanpribor", but their proposed project SJC on weight and size characteristics could not be placed on the submarine pr.677. General Director of CDB ME "Rubin" IDSpassky made solutions Minsudproma to transfer radio-electronic development HOOK ON "Wave" (Moscow). In the summer of 2005 to the final design of the SJC as a major artist has joined NPO "Elektropribor" (St. Petersburg, the contract from April 2006).
Head of the boat series - pr.677 "Lada" - B-585 (sometimes name B-100 and C-100, serial №01570) and headache pr.677E "Amur" ("Amur-1650") incorporated in the plant FSUE "Admiralty Shipyards" (St. Petersburg) December 26, 1997 In 1997, . B-585 submarine was named "St. Petersburg". During 1998-2001 GG (As of 1 April 2002) for the construction of submarines head pr.677 "Admiralty Shipyards" has been spent 335.1 million rubles, including from the federal budget 263.1 million rubles (including 175.5 million rubles in 2001). In the first quarter of 2002, the federal funding for the construction of the order was not conducted ( source ).
Parent boat launched on October 28, 2004 Release Date Navy submarine was planned in 2006 (did not take place in time). 14-21 December 2005 the submarine "Saint Petersburg" made the first access to the sea to the test, made the first dive. According to media reports in 2006, the boat was supposed to begin public testing, but the first half of 2008 (at least) are factory running tests with damper units and complexes of submarines. As of the 2009 adoption of the boats of the Navy planned for 2009-2010 In February 2010, announced that the head boat "St. Petersburg" will be adopted before the summer in the trial operation of the Navy and the Navy signed 22.04.2010, the act of receiving the head of the boat B-585 "St. Petersburg", the boat passed into trial operation. May 8, 2010 on the submarine B-585 "Saint Petersburg" raised the flag of the Russian Navy.
B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg in the Navy Day, 25.07.2010 (photo - Dmitry Shipulya,Отечественная военная техника (после 1945 г.) • Главная страница ).
Series PL pr.677 in production - all the plans in 2009 is planned for the Russian Navy to build eight submarines of this type. According to the same state armaments program for 2007-2015 gg planned construction of six submarines pr.677. In early November 2011 Information appeared that the construction of the submarine pr.677 frozen. November 24, 2011 CEO of CDB ME "Rubin" A.Dyachkov said the boat project will be upgraded to the updated technical project (code name pr.677D). New technical project will be ready in 2013 and then the second and third boats of the project will be completed 677 on the new project. June 27, 2012 the media reported that the Russian Navy has decided to resume construction of the submarine pr.677 Adjusted project . 13.02.2012, the General Director of "Rosoboronexport" Anatoly Isaykin told the media: "" Today, the decision to build a batch of these submarines by the Ministry of Defense of Russia accepted. Financing of construction is planned in the state defense order and trial operation of the submarine is in accordance with a program that succeeds. "May 18, 2013 Commander of the Navy in the media stated that the first three submarines pr.677 fleet received a conventional power plant ( source ). The contract for construction "Krognshtadta" and "Sevastopol" entered into force on 9 July 2013 (source ).
Submarine "Saint Petersburg" pr.677 on tests. Baltika, no later than the summer of 2007 (file photo Curious, Форумы Balancer'а
B-585 submarine "Saint Petersburg" pr.677 in Kronstadt, November 2010 (file photo Vladimir, Отечественная военная техника (после 1945 г.) • Главная страница
One of the first images of the model pilot project submarines family "Cupid" (export version - "Amur-1650") in the media (approximately 1997, http://milparade.ru)
The design of the submarine - one-polutorakorpusnaya in the hull structure steel is used AB-2 of the CSI KM "Prometheus". Through the use of the most modern means of acoustic protection is assumed that the noise of the submarine will be several times lower noise submarine pr.877 . On the submarine conning-tower project set hydroplanes. Protivogidroakusticheskoe cover boats designed CRI im.akad.Krylova performed 7-8-layer and 40 mm thick.
1 compartment - antenna HOOK and TA
2 compartment - command post
3 compartment - residential
4 and 5 compartments - power plant
Nasal block module submarine hull "Kronstadt" pre-shipment from the shop in shop №9 №12 FSUE "Admiralty Shipyards", December 2014 ("Admiralteets", №23 / 2014).
Submarine "Saint Petersburg" pr.677 LADA (October 28, 2004, ElForo.De El paraiso de los foros
Most diesel-electric submarine ("B"). Developed by CDB ME "Rubin", Chief Designer - Yu.N.Kormilitsyn. Research began in 1987 and was originally planned to build a large series of submarines at the "Leningrad Admiralty Association" (Leningrad), "Sevmash" (Severodvinsk), "Red Sormovo" (Nizhny Novgorod) and "Them. Lenin Komsomol "(Komsomolsk-on-Amur). The technical design of submarines pr.677 approved in 1993, but was sent for recycling. The second version of the technical design approved in 1997. When creating PL worked out 180 OCD. Development of the SJC initially charged with SRI "Okeanpribor", but their proposed project SJC on weight and size characteristics could not be placed on the submarine pr.677. General Director of CDB ME "Rubin" IDSpassky made solutions Minsudproma to transfer radio-electronic development HOOK ON "Wave" (Moscow). In the summer of 2005 to the final design of the SJC as a major artist has joined NPO "Elektropribor" (St. Petersburg, the contract from April 2006).
Head of the boat series - pr.677 "Lada" - B-585 (sometimes name B-100 and C-100, serial №01570) and headache pr.677E "Amur" ("Amur-1650") incorporated in the plant FSUE "Admiralty Shipyards" (St. Petersburg) December 26, 1997 In 1997, . B-585 submarine was named "St. Petersburg". During 1998-2001 GG (As of 1 April 2002) for the construction of submarines head pr.677 "Admiralty Shipyards" has been spent 335.1 million rubles, including from the federal budget 263.1 million rubles (including 175.5 million rubles in 2001). In the first quarter of 2002, the federal funding for the construction of the order was not conducted ( source ).
Parent boat launched on October 28, 2004 Release Date Navy submarine was planned in 2006 (did not take place in time). 14-21 December 2005 the submarine "Saint Petersburg" made the first access to the sea to the test, made the first dive. According to media reports in 2006, the boat was supposed to begin public testing, but the first half of 2008 (at least) are factory running tests with damper units and complexes of submarines. As of the 2009 adoption of the boats of the Navy planned for 2009-2010 In February 2010, announced that the head boat "St. Petersburg" will be adopted before the summer in the trial operation of the Navy and the Navy signed 22.04.2010, the act of receiving the head of the boat B-585 "St. Petersburg", the boat passed into trial operation. May 8, 2010 on the submarine B-585 "Saint Petersburg" raised the flag of the Russian Navy.
B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg in the Navy Day, 25.07.2010 (photo - Dmitry Shipulya,Отечественная военная техника (после 1945 г.) • Главная страница ).
Series PL pr.677 in production - all the plans in 2009 is planned for the Russian Navy to build eight submarines of this type. According to the same state armaments program for 2007-2015 gg planned construction of six submarines pr.677. In early November 2011 Information appeared that the construction of the submarine pr.677 frozen. November 24, 2011 CEO of CDB ME "Rubin" A.Dyachkov said the boat project will be upgraded to the updated technical project (code name pr.677D). New technical project will be ready in 2013 and then the second and third boats of the project will be completed 677 on the new project. June 27, 2012 the media reported that the Russian Navy has decided to resume construction of the submarine pr.677 Adjusted project . 13.02.2012, the General Director of "Rosoboronexport" Anatoly Isaykin told the media: "" Today, the decision to build a batch of these submarines by the Ministry of Defense of Russia accepted. Financing of construction is planned in the state defense order and trial operation of the submarine is in accordance with a program that succeeds. "May 18, 2013 Commander of the Navy in the media stated that the first three submarines pr.677 fleet received a conventional power plant ( source ). The contract for construction "Krognshtadta" and "Sevastopol" entered into force on 9 July 2013 (source ).
Submarine "Saint Petersburg" pr.677 on tests. Baltika, no later than the summer of 2007 (file photo Curious, Форумы Balancer'а
B-585 submarine "Saint Petersburg" pr.677 in Kronstadt, November 2010 (file photo Vladimir, Отечественная военная техника (после 1945 г.) • Главная страница
One of the first images of the model pilot project submarines family "Cupid" (export version - "Amur-1650") in the media (approximately 1997, http://milparade.ru)
The design of the submarine - one-polutorakorpusnaya in the hull structure steel is used AB-2 of the CSI KM "Prometheus". Through the use of the most modern means of acoustic protection is assumed that the noise of the submarine will be several times lower noise submarine pr.877 . On the submarine conning-tower project set hydroplanes. Protivogidroakusticheskoe cover boats designed CRI im.akad.Krylova performed 7-8-layer and 40 mm thick.
1 compartment - antenna HOOK and TA
2 compartment - command post
3 compartment - residential
4 and 5 compartments - power plant
Nasal block module submarine hull "Kronstadt" pre-shipment from the shop in shop №9 №12 FSUE "Admiralty Shipyards", December 2014 ("Admiralteets", №23 / 2014).
Submarine "Saint Petersburg" pr.677 LADA (October 28, 2004, ElForo.De El paraiso de los foros