What's new

A Complete Information on Russian offer of Indian Amur 1650 & Analysis

Major Shaitan Singh

SENIOR MEMBER
Joined
Dec 7, 2010
Messages
3,550
Reaction score
43
Country
India
Location
India
DATA FOR 2015 (standard completion)

Most diesel-electric submarine ("B"). Developed by CDB ME "Rubin", Chief Designer - Yu.N.Kormilitsyn. Research began in 1987 and was originally planned to build a large series of submarines at the "Leningrad Admiralty Association" (Leningrad), "Sevmash" (Severodvinsk), "Red Sormovo" (Nizhny Novgorod) and "Them. Lenin Komsomol "(Komsomolsk-on-Amur). The technical design of submarines pr.677 approved in 1993, but was sent for recycling. The second version of the technical design approved in 1997. When creating PL worked out 180 OCD. Development of the SJC initially charged with SRI "Okeanpribor", but their proposed project SJC on weight and size characteristics could not be placed on the submarine pr.677. General Director of CDB ME "Rubin" IDSpassky made solutions Minsudproma to transfer radio-electronic development HOOK ON "Wave" (Moscow). In the summer of 2005 to the final design of the SJC as a major artist has joined NPO "Elektropribor" (St. Petersburg, the contract from April 2006).

Head of the boat series - pr.677 "Lada" - B-585 (sometimes name B-100 and C-100, serial №01570) and headache pr.677E "Amur" ("Amur-1650") incorporated in the plant FSUE "Admiralty Shipyards" (St. Petersburg) December 26, 1997 In 1997, . B-585 submarine was named "St. Petersburg". During 1998-2001 GG (As of 1 April 2002) for the construction of submarines head pr.677 "Admiralty Shipyards" has been spent 335.1 million rubles, including from the federal budget 263.1 million rubles (including 175.5 million rubles in 2001). In the first quarter of 2002, the federal funding for the construction of the order was not conducted ( source ).

Parent boat launched on October 28, 2004 Release Date Navy submarine was planned in 2006 (did not take place in time). 14-21 December 2005 the submarine "Saint Petersburg" made the first access to the sea to the test, made the first dive. According to media reports in 2006, the boat was supposed to begin public testing, but the first half of 2008 (at least) are factory running tests with damper units and complexes of submarines. As of the 2009 adoption of the boats of the Navy planned for 2009-2010 In February 2010, announced that the head boat "St. Petersburg" will be adopted before the summer in the trial operation of the Navy and the Navy signed 22.04.2010, the act of receiving the head of the boat B-585 "St. Petersburg", the boat passed into trial operation. May 8, 2010 on the submarine B-585 "Saint Petersburg" raised the flag of the Russian Navy.

hVNNE.jpg

B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg in the Navy Day, 25.07.2010 (photo - Dmitry Shipulya,Отечественная военная техника (после 1945 г.) • Главная страница ).

Series PL pr.677 in production - all the plans in 2009 is planned for the Russian Navy to build eight submarines of this type. According to the same state armaments program for 2007-2015 gg planned construction of six submarines pr.677. In early November 2011 Information appeared that the construction of the submarine pr.677 frozen. November 24, 2011 CEO of CDB ME "Rubin" A.Dyachkov said the boat project will be upgraded to the updated technical project (code name pr.677D). New technical project will be ready in 2013 and then the second and third boats of the project will be completed 677 on the new project. June 27, 2012 the media reported that the Russian Navy has decided to resume construction of the submarine pr.677 Adjusted project . 13.02.2012, the General Director of "Rosoboronexport" Anatoly Isaykin told the media: "" Today, the decision to build a batch of these submarines by the Ministry of Defense of Russia accepted. Financing of construction is planned in the state defense order and trial operation of the submarine is in accordance with a program that succeeds. "May 18, 2013 Commander of the Navy in the media stated that the first three submarines pr.677 fleet received a conventional power plant ( source ). The contract for construction "Krognshtadta" and "Sevastopol" entered into force on 9 July 2013 (source ).

rTBjxo7YGU.jpg

Submarine "Saint Petersburg" pr.677 on tests. Baltika, no later than the summer of 2007 (file photo Curious, Форумы Balancer'а

QM8uR.jpg

B-585 submarine "Saint Petersburg" pr.677 in Kronstadt, November 2010 (file photo Vladimir, Отечественная военная техника (после 1945 г.) • Главная страница

Uq0IivAiSB.jpg

One of the first images of the model pilot project submarines family "Cupid" (export version - "Amur-1650") in the media (approximately 1997, http://milparade.ru)


The design of the submarine
- one-polutorakorpusnaya in the hull structure steel is used AB-2 of the CSI KM "Prometheus". Through the use of the most modern means of acoustic protection is assumed that the noise of the submarine will be several times lower noise submarine pr.877 . On the submarine conning-tower project set hydroplanes. Protivogidroakusticheskoe cover boats designed CRI im.akad.Krylova performed 7-8-layer and 40 mm thick.
1 compartment - antenna HOOK and TA
2 compartment - command post
3 compartment - residential
4 and 5 compartments - power plant

DzVNE.jpg

Nasal block module submarine hull "Kronstadt" pre-shipment from the shop in shop №9 №12 FSUE "Admiralty Shipyards", December 2014 ("Admiralteets", №23 / 2014).



UQzM0m4iEm.jpg

Submarine "Saint Petersburg" pr.677 LADA (October 28, 2004, ElForo.De El paraiso de los foros

Tu4hmV0eNn.jpg
 
.
yvIV9veAiv.jpg

Descent submarine "Saint Petersburg" pr.677 water (October 28, 2004, ЦКБ МТ Рубин: Главная Quality and condition protivogidroakusticheskogo cover submarine B-585 "Saint Petersburg" as of 2005 of (top) and in 2011 (below). Photos from the salons of IMDS, St. Petersburg. (Photo - adv1971, 2005 and Cheslav, 2011, Форумы Balancer'а and Яндекс.Фотки

MmmIz.jpg


hRIzr.jpg


dqhh8.jpg


Ff6ss.jpg

Body parts submarine B-585 "Saint Petersburg" pr.677 on the Neva River in St. Petersburg. Output of the trigger dock apparently after repair, 01.06.2012 (photo - pfc-joker, Рядовой Шутник

Engines : full electric propulsion motor with a single all-mode
2 x diesel generator 28DG DC Kolomna Plant and JSC "Electric power" power 1000 kW generator uses an 8-cylinder V-diesel D-49 with piston diameter of 260 mm, 260 mm stroke and speed up to 1000 rev / min. Diesel generators are controlled remotely from the central station by means of a digital control system. During the repair, which is March 27, 2012 was held at the head boat "Saint Petersburg" on CVD Admiralty Shipyards replaced generators ( source ). 1 x main propulsion motor SED-1 (low-speed brushless motor with all-mode excitation permanent magnets) power 4100 hp (4100 kW at dr.dannym), the development of CDB ME "Rubin" together with FSUE NIIEFA them. D.V.Efremova. Production of "New Era" (assembly) of "Electric power", CRISM "Electric appliance". Control - digital control system design CRI "Elektropribor". Small-size prototype prototype engine was successfully tested the first prototype of a full-size set to head submarine pr.677. According to tests in 2006 required a significant improvement of the system at a speed of 125 rev / min or more, conducted in 2007. The power developed by the engine during the test according to Lukin (see. Sources) shall not exceed 50%. As of May 2010 the submarine B-585 adopted in trial operation with the Navy HED working at 60% capacity. As of November 2011 according to unofficial data, and according to media problems with motor nedovedennostyu remain. 2 x remote screw column RDK-35 Motor PG-102M (?) with a capacity of 140 hp development of NPP "Marine Engineering".




MEer1ejwfk.jpg

Diesel generator 28DG (file photo DenisKA, Форумы Balancer'а Motor SED-1 on the test stand in CDB ME "Rubin" (photo CDB ME "Rubin")

B3gDl3V8Qd.jpg



Boating pr.667D electric propulsion system will be upgraded ( source ).


Mechanics - 1 shaft and 1 screw 7-bladed fixed pitch with scimitar-shaped blades and two outrigger screw column RDK-35.

40dWiwJ5O1.jpg

Submarine "Saint Petersburg" pr.677 LADA (October 28, 2004, ElForo.De El paraiso de los foros
 
.
phQ49Ir9Jr.jpg

Descent submarine "Saint Petersburg" pr.677 water (October 28, 2004, ЦКБ МТ Рубин: Главная

ohQVZINvAE.jpg

Photomontage based on photos taken when launched submarine "Saint Petersburg" pr.677 LADA (October 28, 2004., ElForo.De El paraiso de los foros

b7tQQ.jpg

External screw column RDK-35, B-585 submarine "Saint Petersburg", 2009 (file photo Ispytateley_10, Форумы Balancer'а

Energy - Batteries, 2 groups of 126 units - 476 product, total capacity - 10,580 kW / h. Power system PL - for sliding devices - DC voltage of at least 175 and not more than 320 volts.

According to an interview with the director "Admiralty Shipyards" Alexander Buzakova completion of boats on the upgrade projects will begin in 2013 in the case of their inclusion in the state defense order for the year. Just when ready staff lithium batteries will be installed on the submarine "Kronstadt". As of September 2012 funding for works on rechargeable lithium battery is selected, experimental work carried out.

System Rescue - Rescue universal complex type KSU-600 for remote automatic release liferafts PSNL-20 (2 pieces in front of the fence superstructure sliding devices, the system is designed CDB "Lapis", is also used on submarines K-335 "Cheetah").

TTX submarine :
Crew - 35 persons Length - 66.8 meters Width - 7.1 m draft - 6.7 m above water Displacement - 1765 tons (1950 tons dr.dannym)Displacement underwater - 2,650 tons of speed surface speed - 10 kt maximum submerged speed - 21 ties cruising range maximum underwater interleaved mode RDP (speed 7 kt) and silent stroke (3.5 kt) - 16,000 miles (based on fuel consumption for battery charging)cruising range underwater mode RDP (speed 7 kt) - 6,500 miles (excluding fuel consumption for battery charging) submarine cruising range (speed 3 kt) - 650 miles immersion depth Working - 240-250 m (according to various sources) Immersion depth limit - 300 mAutonomy - 45 days Guaranteed lifetime - 25 years of guaranteed lifetime to first repair - 10 years Noise submarines - the statements in the media noise pr.677 shall be 50% of the noise pr.877 submarine, which means calm in the noise level of about 30 dB. Armament : 6 x 533 mm bow torpedo tubes with air system and firing an automatic quick reloading silent "Moray" (2 TA upper tier adapted to fire remote-controlled torpedoes). According to the TTP to create submarines to be installed 4 TA with 12 torpedoes ammunition. Ammunition - mines, torpedoes 18 (types SAET-60M, UGST and USET-80K), rocket torpedoes "Squall" and SIC "Turquoise" (Club-S) launched from torpedo tubes or 22 mines DM-1. According to 2009 in 1990 for submarine torpedo developed pr.677 TE-2 "toys" - the fate is unknown. 6 x MANPADS "Igla-1M"

tlq8IhvAin.jpg

System torpedo submarine pr.677 (Figure Tomasz Grotnik, from Grotnik Tomasz, Pierwsza Lada przed wejsciem do sluzby. // Nova Technika Wojskowa. №3 / 2007 Poland). View of the cover of the nasal torpedo submarine "Saint Petersburg" pr.677 LADA (October 28, 2004, ElForo.De El paraiso de los foros

9Bj1fBjxTC.jpg


zmAWEneWaw.jpg

View of the bow of the submarine "Saint Petersburg" pr.677 a floating dock. St. Petersburg, April 2008 (file photo Amoralex, Форумы Balancer'а

tZdqh0I5Nv.jpg

The bow of the submarine "Saint Petersburg" pr.677 - centered clearly visible hatch for loading torpedoes (Форумы Balancer'а
 
.
27ttP.jpg

B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg. Output of the trigger dock apparently after repair, 01.06.2012 (photo - pfc-joker, Рядовой Шутник


Equipment:
CICS (combat information management system) A comprehensive system of automated control of the ship "Lithium" development NGOs "Aurora" with the participation of CDB ME "Rubin" and several Navy Research Institute (prototype system "Lithium" is a system of "Bulat" developed in the 1980s). Automated traffic control system "Liana". As of November 2011, according to some media are still problems with nedovedennostyu CICS "Lithium" (to be confirmed). CICS "Lithium"
Management of general ship systems The upgraded system control of ship tehnikechsimi means (source )
HOOK
HOOK "Lira" (according to test results in 2006 required substantial revision of the system - probably in part with CICS interface HOOK "Lithium" and a piece of software) - R & D HOOK since the early 1980's. Head developer - software "Wave" (Moscow), the main performer on development - CRI "Elektropribor" (since April 2005 officially, in the summer of 2005 in fact). Production HOOK - Taganrog plant "Surf". As of 2008 were engineering test hooks test software on the bench.


The composition of the SJC:

- Device №1 HOOK "Lira" - nose quasi-conformal antenna shumopelengatornaya large area L-01
- Onboard quasiconformal shumopelengatornye sonar in the bow of the hull
- GAS active minoiskaniya, measure distances and sonar communication
- sonar towed acoustic antenna (pr. 677 - exactly pr.677E -?)
- The equipment to ensure safety of navigation "GAS-BP" (the third final stage of testing in January 2007)

HOOK "Lira"
Complex radar

Radar MRC-66 "Kodak", an export version of the ASO-66E - designed and produced by concern "Granit-Electron" (St. Petersburg). Includes active and passive radar channels, combined antenna post channels, maintenance kit.
Power supply - from the mains 175-320 volts DC
Power consumption - 3.5 kW
Radio-technical equipment

Radio communication
Complex digital radio communications "Distance" (including exhaust towed antenna K-697 for underwater communication - from the upper aft cabin enclosure, antenna length of 20 m is used to a depth of 100 m in the western unverified data)
Navigation system Navigation system "Appassionata" (test 2007) with an inertial navigation system and satellite navigation system GPS / GLONASS - for the first time on the influx in the Navy, and Russia, a small-size, low power consumption. By 2008, passed the state test, developed CRI "Electric appliance".
Precision navigation - deviation coordinates of the place for 2 days - 5 km from changes in currency to 6 ° C / min.

On completion of the development of complex CRI "Elektropribor" was announced 03.12.2003 (РосБизнесКонсалтинг — новости, акции, курсы валют, погода, доллар, евро reported the value of the CCP - 8 million USD. Both periscope with a gyroscopic stabilization of the line of sight. Work periscopes provided at a rate of up to 10 knots submarines. In 2004, the Code of Criminal Procedure "Sail-98" shipped at FSUE "Admiralty Shipyards" for installation on the head pr.677 submarine "Saint Petersburg".

Upgraded navigation system (source )
Periscopes

The Uniform Code of Criminal Procedure periscope complex "Sail-98" ("Sail-98E" - export version).Developer - CDB ME "Rubin", the prime contractor and collaborator - CRI "Electric appliance". The complex:

- Commander's periscope penetrating type "Sail-98KP" (commander's periscope) with optical and TV channels with variable magnification from 1.5 to 12X - day and low-level, with the video - the development of FSUE CDB "Photon";

- Opto mast penetrating type "Sail-98UP" (Universal periscope) with TV channels with variable magnification from 1.5 to 12X - day and low-level, thermal channel, laser rangefinder - development of FSUE CDB "Photon";

UPK "Sail-98"
Others
At the stage of the first sea trials (December 2005) on the submarine "Saint Petersburg" was established contingency navigation radar "tack" of NPO "Horizon". On the submarine "Saint Petersburg" since 2007 were tested equipment: IMC (retractable fence cutting device) "speed jet," IMC "Kodak" IMC "Pineapple" DSA Code of Criminal Procedure "Sail-98" (with outboard cables), blocks BDA complex "Blade" CEB "Gnome-2M". OCD "Lira" (GAK) test failed due to unavailability of software (Revised Plan - 2008). On submarines used emergency transmitter system "COSPAS-SARSAT" B-603. In Submarine "St. Petereburg" pr.677 in the summer of 2009 has finalized the SJC. PL pr.677E as of 2007 has not yet GAK (not ready, the sum of the costs of developing the SJC is already 1 billion. 300 million. Rubles).

As of November 2011 according to unofficial reports problems with nedovedennostyu SJC resolved.


iX2BGo7boY.jpg

Kvazikonfornye shumopelengatornye sonar (side and nose) HOOK "Lear" (photo SKB "Rubin", Grotnik Tomasz, Pierwsza Lada przed wejsciem do sluzby. // Nova Technika Wojskowa. №3 / 2007 Poland).

blyU8QHq90.jpg


7zM0dzi9m5.jpg

General view of the fragment and quasi shumopelengatornyh sonar (nasal and lateral) HOOK "Lear" (photo probably PLA "Kronstadt", 2009, from the archives of Deep Blue Sea, Форум "Стелс машины" • Главная страница

a6tkb.jpg

Opto-mast "Sail-98UP" unified periscope complex "Sail-98E" exhibition IMDS-2009, St. Petersburg (Photo abl22, 2009)

Xo7kxgYl3h.jpg

Module laser rangefinder and a TV channel (left) and thermal imaging device module (right) for opto-mast (FSUE CDB "Photon", http://www.ckb-photon.ru, 2009)

lMEvv.jpg

Radar antenna post ASO-66E periscope complex "Sail-98E" exhibition IMDS-2009, St. Petersburg (Photo abl22, 2009)


eoBYGpCYHp.jpg

The main command post submarine pr.677 (Figure CDB "Ruby", 女性の転職体験談 アパレル広報から広告代理店求人へ挑戦
 
.
Wx7PUYHM04.jpg

Devices in the fence cutting submarine pr.677 (Figure Tomasz Grotnik, from Grotnik Tomasz, Pierwsza Lada przed wejsciem do sluzby. // Nova Technika Wojskowa. №3 / 2007 Poland).

nPU7cp8IV0.jpg

Unified periscope complex "Sail-98" and the fence cutting submarine "Saint Petersburg" pr.677 LADA with drawer, December 2005 (based on a photo of Oleg Karpenko, http://photofile.ru/users/carpenco )

eXjFw.jpg


XxxTK.jpg


CgCZl.jpg


PxUgC.jpg

B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg, 26.07.2012 (photo - PFC-Joker, http://pfc-joker.livejournal.com ).


Modifications:
pr.677 / 06770 "Harmony" - LADA - a series of submarine for the Russian Navy. Production is carried out at the plant FSUE "Admiralty Shipyards" (St. Petersburg). 1) B-585 "St. Petersburg", the factory №01570 (head pilot project PL) - founded 26.12.1997, hull production cycle is completed in January 2002 - the building blocks of PL translated into the shop №12 FSUE "Admiralty Shipyards" for equipment installation and assembly launched - 28.10.2004, delivery fleet - 2010 (Plan 2009), earlier - before the end of 2009 (the beginning of the plan 2009). It was originally planned to hand over the submarine fleet in 2005, in 2008 (Plan 2005) and in 2009-2010 (Announced in 2008);acceptance certificate signed by the Navy of 22.04.2010, raising of the flag of the Navy is expected in early May 2010


kCCtk.gif

Projection PL pr.677 LADA (Diletant2010, Форумы Balancer'а

2) B-586 "Kronstadt" factory №01571 (first production PL) - founded 28.07.2005 g .. deflated - 2009 No surrender of the fleet - 2013 (plan beginning 2009), previously - 2010 (plan for the beginning of 2009), previously - 2008 (Plan 2005);

mnWwejT6aK.jpg

BS board the submarine B-586 "Kronstadt" pr.677 LADA (file photo Snake, Форумы Balancer'а

3) B -... "Petrozavodsk", serial number unknown - laid - Summer 2006 (according to media reports, confirmation of events is not). PL has not been laid or was laid, but later renamed the "Sevastopol" (see below). There is a possibility that the name "Petrozavodsk" canceled due to the events in Kondopoga. 4) B-587 "Sevastopol", factory №01572 (third serial pr.677 PL) - founded 10.11.2006, launching - no data delivery Navy - 2015 (plan beginning in 2009); pr.677E "Cupid" / "Amur-1650" LADA - export version of PL pr.677, headache boat lies at the plant FSUE "Admiralty Shipyards" (St. -Peterburg) December 26, 1997
 
.
FBjxT7PHUL.jpg

Model PL pr.677, 2004. (Фотохостинг: фотографии пользователя 4ekist

kZcqDvIqi0.jpg

HIi0Ai1AOS.jpg

Layout scheme submarine "Amur-1650" pr.677E (ЦКБ МТ Рубин: Главная

0d4WW.jpg

Hull construction submarine "Amur-1650" on the waterfront pr.677E LAO, St. Petersburg, November 3, 2011 (author photo - reflex-yu, Форумы Balancer'а


pr.677D - November 24, 2011 CEO of CDB ME "Rubin" A.Dyachkov said the boat project will be upgraded to the updated technical project - code name pr.677D. New technical project will be ready in 2013 and then the second and third boats of the project will be completed 677 on the new project. February 9, 2012 This information is essentially confirmed the Russian Navy Commander Vladimir Vysotsky, saying that built boats pr.677 will be upgraded. Just commander announced the drafting of air-independent propulsion system, which can begin to experience boating pr.677 in 2014. According to an interview with the director "Admiralty Shipyards" Alexander Buzakova completion boats will start in 2013 in the case of their inclusion in the state defense order for the year . In the case of full-time readiness of lithium batteries will be installed on the submarine "Kronstadt". As of September 2012 funding for works on rechargeable lithium battery is selected, experimental work carried out. July 9, 2013 came into force a contract for the construction of submarines pr.677D ("Kronstadt" and "Sevastopol"). Boats updated draft will differ somewhat modernized and updated equipment Electric Propulsion (source ). Amur-1650VNEU - AMUR - the project is large non-nuclear submarine pr.677 with airindependent power plant. Development VNEU conducted as of 2012 CDB ME "Rubin". Upon successful completion of the VNEU it can be installed on the submarine "Sevastopol" after processing project.


Status : Russia

WwSff.jpg

Bookmark the submarine B-585 "Saint Petersburg" (Форумы Balancer'а

6b22o.jpg

Section hull submarine B-585 "St. Petersburg" in the workshop №9 "Admiralty Shipyards" (Форумы Balancer'а


- January 2002 - a series of submarine hull production "Saint Petersburg" is completed - the building blocks of PL translated into the shop №12 FSUE "Admiralty Shipyards" for equipment installation and assembly.

B3guQ4q8mI.jpg

Submarine "Saint Petersburg" on the stocks "Admiralty Shipyards" (Winter 2002 "Chronicle" Ruby ", 2002, CDB ME" Rubin ")

- 2004 November 29 - According to Vladimir Alexandrov (Director of FSUE "Admiralty Shipyards") magazine "Kommersant" head submarine pr.677E ready by 31%. Likely customers - India, China and possibly Algeria. - 2005 - Headache PL pr.677E ready by 47%. - 2005 June 29 - July 3 - in St. Petersburg at the Naval Show IMDS-2005 is represented by the head of submarines "Saint Petersburg" pr.677.

ZVER4WERdW.jpg
 
.
RNwJ5j1SBX.jpg


pIqMvI5ivm.jpg

Submarine "Saint Petersburg" pr.677 LADA at IMDS-2005 (photo ЦКБ МТ Рубин: Главная / )

- 2005 July 28 - at FSUE "Admiralty Shipyards" laid the second submarine pr.677 (first production) - B-586 "Kronstadt" (factory №01571).- November 29, 2005 - the beginning of sea trials the submarine "St. Petersburg. " - 2005 December 17 - the submarine "Saint Petersburg" first appeared on the sea trials in the Gulf of Finland.

63MmV9RWve.jpg

Submarine "Saint Petersburg" pr.677 sea trials, 2005 (file photo Curious, Форумы Balancer'а submarine "Saint Petersburg" pr.677 LADA on trials in the Baltic Sea, December 2005 (photo - Oleg Karpenko, Фотохостинг: фотографии пользователя carpenco pr.677 submarine "Saint Petersburg" on tests, December 2007 (Grotnik Tomasz, Pierwsza Lada przed wejsciem do sluzby. / / Nova Technika Wojskowa. №3 / 2007 Poland). Either pr.677E submarine hull or construction of the first submarine pr.677 "Saint Petersburg" in the shop FSUE "Admiralty Shipyards", St. Petersburg (footage from the documentary "The impact force. The black hole in the ocean," ORT broadcast of 31.05.2006).

5wfsO2f6k2.jpg



SbT7kxg7P3.jpg



tmVEdiv5On.jpg


CDdMmr9er1.jpg


- 2005 December - the first stage of sea trials the submarine "Saint Petersburg" .. - Spring 2006 - planned in January 2006, the leadership of the Navy release date submarine "Saint Petersburg" on the final state tests with the subsequent acceptance of the Navy. Submarine entered the test, but as of August 2009 has not been accepted into the Navy. - Summer 2006 - according to media reports (Lenta.ru at FSUE "Admiralty Shipyards" laid submarine pr.677 " Petrozavodsk ". Evidence of this event in later sources do not.


eGT7kbU7YH.jpg

Submarine "Saint Petersburg" pr.677 on completion of FSUE "Admiralty Shipyards" (July 9, 2006, photo mikdbow, site Webshots - Today's Photo submarine "Saint Petersburg" pr.677 to demagnetization , St. Petersburg, 2006 (file photo Curious, Форумы Balancer'а
 
.
aYbpLYcyMZ.jpg


- 2006 October 14 - according to witnesses submarine "Saint Petersburg" came from St. Petersburg to Kronstadt and went to Baltiysk for running tests, but could not reach the Baltic Sea and returned to the factory revision in St. Petersburg (not confirmed). - 2006 October 23 - headache pr.677 submarine "Saint Petersburg" successfully passed the first stage of a 10-day sea trials in the Baltic Sea (26.10.2009 submarine returned to its course in St. Petersburg).


yz8RV9div5.jpg

Submarine "Saint Petersburg" pr.677 a sea trial (October 2006, ЦКБ МТ Рубин: Главная


- 2006 November 10 - at FSUE "Admiralty Shipyards" laid the third submarine pr.677 - B-587 "Sevastopol" (factory №01572). As of 2005 was supposed to give the name of the boat "Petrozavodsk" - any error in the media or some confusion.

nP2gYkyLCl.jpg

Submarine B-586 "Kronstadt" in the shop FSUE "Admiralty Shipyards", St. Petersburg, 10 November 2006 (file photo havron, Форумы Balancer'а The performance for the media - supposedly the first section hull submarine B-587 "Sevastopol" in the shop FSUE "Admiralty Shipyards", St. Petersburg, November 10, 2006 In fact - part of the pressure hull submarine pr.877 / 636, which was used as a "layout" for demonstration press. (File photo havron, Форумы Balancer'а

a6bTtbLt3g.jpg



- 2007 January 25 - March 17 - the next stage of the factory running tests submarine "Saint Petersburg" on the Baltic Sea, with corrections and modifications of avionics and HED. PL on tests accompanied TFR "Ardent". One of the objectives was to develop tests sliding devices fence cutting. During the tests simulated a GED and took its completion in particular parts of the software have been tested with other systems. The ship sent for repairs and improvement. Travel 2808 miles. According to the results of tests it was decided to rework and subsequent state tests submarine in 2007

lvI4hvIziv.jpg

Submarine "Saint Petersburg" pr.677 on the Neva River, St. Petersburg, May 5, 2007 (photo V.Trynkin, http://forums.airbase.ru).submarine "Saint Petersburg" pr.677 a floating dock "Meadows" in outfitting wall Admiralty Shipyards, St. Petersburg, June 2007 (Photo by Oleg Isavnin, Форумы Balancer'а PL "Saint Petersburg" pr.677, St. Petersburg, July 30, 2007 g (Форумы Balancer'а

exftkxTCPH.jpg


kgucyLuQyq.jpg



- 2007 September 5 - September 30 - exit submarine "Saint Petersburg" at the next (second in 2007) Stage factory navigation test. Tasks - HED test, measurements of noise characteristics of the submarine, improvement of the navigation system, maneuverable underwater submarine test. In the final stage held measurement of physical fields using the vessel fiz.poley SFA "Subbotin." - October 2007 - held military-technical council which considered the opportunity to enter the submarine "Saint Petersburg" on state tests in 2007 and discussed the status of work by ROC "Lira" (unsatisfactory).


- 2007 October 23 - exit submarine "Saint Petersburg" at the next (third in 2007) Stage factory navigation test. Tasks - GED test on different modes and depths (successful). Successfully tested in the same unit PMU, redundant thrusters RDK-35 DSA radar (tentative), CICS and blocks BDA complex "Blade." Unable to carry out all the tests navigation system "Appassionata" (due to a malfunction of some elements of the complex). - 2007 November - planned final epat factory running tests with complete testing and commissioning of the main motor SED-1, SAC A-01 and the navigation system "Appassionata". But in the 5th compartment on the control panel main motor caught fire (PL stood at the wall "Admiralty Shipyards" and in 2007 the test is not completed (by SED-1, ROC "Lira" and the ROC "Kodak"). - 2008 . - To plan in 2005, launching submarines "Kronstadt" (failed). Information about the submarine "Petrozavodsk" disappears from the media.

lvI4hvIziv.jpg

Submarine "Saint Petersburg" pr.677 on the Neva River, St. Petersburg, May 5, 2007 (photo V.Trynkin, http://forums.airbase.ru).submarine "Saint Petersburg" pr.677 a floating dock St. Petersburg, June 2007 (Photo by Oleg Isavnin, Форумы Balancer'а PL "Saint Petersburg" pr.677, St. Petersburg, July 30, 2007 (http: // forums .airbase.ru).
 
.
- January 2009 - construction of the first submarine pr.677E "Amur-1650" at the Federal State Unitary Enterprise "Admiralty Shipyards" continues. There was unconfirmed information vozmozhnosm decision in 2009 submarine "Saint Petersburg" in the Russian Navy in the pilot perform all safety 123 brigade of the Baltic Fleet submarines (St. Petersburg). The information has not been confirmed. - 19 January 2009 - a message on the forum Russian submariners - on the submarine "Saint Petersburg" SJC does not work, HED operates at 50% capacity. Construction of the submarine pr.677E frozen, customers do not. Construction of the submarine "Kronstadt" and "Sevastopol" just frozen. - March 2009 - Deputy Head of the General Staff of the Navy Vice Admiral Oleg Burtsev said that just for the Navy planned to build a series of 8 PL pr.677.

WXxKQ3CQpZ.jpg


9x6bUYcLY3.jpg

Submarine B-586 "Kronstadt" in the shop FSUE "Admiralty Shipyards", St. Petersburg, April-June 2006 ( Форумы Balancer'а

- May 2009 - planned (in March 2009), the final stage of sea trials the submarine "Saint Petersburg".

0ranesFwKB.jpg

Submarine "Saint Petersburg" pr.677 on completion of FSUE "Admiralty Shipyards" (June 26, 2009, photo Barton10, Форумы Balancer'а

tp7ucqhZHz.jpg

Submarine "Saint Petersburg" pr.677 on completion of FSUE "Admiralty Shipyards" (July 28, 2009, photo havron, Форумы Balancer'а

- 2010 March-May - expected acceptance of the submarine "Saint Petersburg" Navy for pilot operation, which will begin in August-September 2010 - 2010 April 22 - signed the acceptance act of state tests submarine "Saint Petersburg". Lifting naval flag is expected to submarines in early May 2010 the submarine B-585 Navy adopted into trial operation with nedovedennym HED (develops 60% power) and deficiencies in other systems.

- 2010 May 6 - B-585 submarine "Saint Petersburg" by order of the Commander in Chief of the Navy enlisted in the Navy.

- 2010 May 8 - on the submarine B-585 "Saint Petersburg" raised the flag of the Russian Navy.

CUUL8.jpg

B-585 submarine "Saint Petersburg" on the day of the ceremony of raising the flag of the Russian Navy, 08.05.2010, St. Petersburg (Форумы Balancer'а

VRJ5W.jpg

B-585 submarine "Saint Petersburg" with the flag and the jack of the Russian Navy, 10.05.2010, St. Petersburg (Photo abl22,Отечественная военная техника (после 1945 г.) • Главная страница ).

- 21-22 May 2010 - the waters of Northern Shipyard St. Petersburg conducted inclining the submarine B-585 "St. Petersburg" and demagnetization operations at the site near Crooked dam.

- 2010 July 25 - B-585 submarine "Saint Petersburg" took part in the naval parade on the Neva River in St. Petersburg in the Navy Day.
 
.
tUL7u.jpg


j6Xkk.jpg


1jF2T.jpg

B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg in the Navy Day, July 25-26, 2010 (photo courtesy of the author, Dmitry Shipulya, Отечественная военная техника (после 1945 г.) • Главная страница ) .

- 2010 21.dekabrya - CEO of CCH "Ruby" A.A.Dyachkov in an interview said that the waters of the Black Sea is too small for submarines pr.677 LADA and therefore submarines of this type will not be part of the Black Sea Fleet. Just stated that the submarine B-585 "Saint Petersburg" will be in trial operation in the Russian Navy until at least the end of 2011. During the trial operation of the submarine brought to the desired performance.

- May 2011 - according to unconfirmed official data for the year of trial operation on the submarine B-585 "Saint Petersburg" eliminated problems with the SJC, in the process of elimination of problems with the main motor, made of fire KR "Calibre".

- 2011 November 3 - hull submarine "Amur-1650" in an unfinished form found on the waterfront LAO rumors to freeze the construction of boats of the project. just as it has been suggested that this hull design or "Kronstadt" and "Sevastopol", but their body fully assembled.

- 2011 November 24 - General Director of CDB ME "Rubin" A.Dyachkov said the boat project will be upgraded to the updated technical project (code name pr.677D). New technical project will be ready in 2013 and then the second and third boats of the project will be completed 677 on the new project.

- 6 February 2012 - in a media interview Russian Black Sea Fleet Commander Alexander Fedotenkov said that after successful tests submarine "Saint Petersburg" in the Northern Fleet, where there is a great depth, and if confirmed will be incorporated into the project advanced technical ideas, as well as take into account operating experience lead ship, the final decision on the completion of two embedded shells. "On the basis of this statement, we can conclude that the initiated and planned testing of the Northern Fleet submarine B-585" Saint Petersburg ".

- 2012 March 27 - after the completion of repair submarine B-585 "Saint Petersburg" pr.677 derived from V-flight department №12 CVD Admiralty Shipyards in the trigger dock and launched. During repairs on the boat were replaced generators. Later started mooring trials of the boat ( source , source ).

we6sj.jpg

B-585 submarine "Saint Petersburg" pr.677 after the withdrawal of the V-flight department №12 CVD Admiralty Shipyards after the completion of the renovation of the boat (Admiralteets. № 6/2012 г.).

- 1 June 2012 - after the completion of repair submarine B-585 "St. Petersburg" is derived from the trigger dock into the Neva.

hmmI4.jpg


1K6XO.jpg


we5sj.jpg

B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg. Output of the trigger dock apparently after repair, 01.06.2012 (photo - pfc-joker, Рядовой Шутник

z88ZR.jpg

B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg after the withdrawal of the trigger dock apparently after repair, 01.06.2012 (photo - PFC-Joker, http://pfc-joker.livejournal.com ).
 
.
anfBB.jpg


ygCul.jpg


9meAW.jpg

Construction unfinished submarine pr.677E on the Neva in St. Petersburg, 01.06.2012 (photo - PFC-Joker, http://pfc-joker.livejournal.com).

- 6 June 2012 - complete servicing of the submarine B-585 "Saint Petersburg" on CVD "Admiralty Shipyards". The boat arrived at the plant for maintenance and repair in August 2011, March 27, 2012 the boat was launched. Later tests conducted mooring and 6 June 2012 the boat returned to oputnuyu service in the Russian Navy ( ist. - S. Vasiliev ).

X11nK.jpg

B-585 submarine "Saint Petersburg" pr.677 after repair goes to the place of permanent deployment, St. Petersburg, 6 June 2012 ("Admiralteets", №11 / 2012).

- 2012 June 27 - the media reported that the Russian Navy has decided to resume the construction of submarines pr.677 Adjusted project.

l4qM9.jpg


gHyyp.jpg


MulI4.jpg


7kGGy.jpg

B-585 submarine "Saint Petersburg" pr.677 on the Neva River in St. Petersburg, 26.07.2012, the picture is assembled from several photographs - high resolution see. here (photo - PFC-Joker, http: // PFC-Joker .livejournal.com ).

- 2012 September 21 - in the media reported that the construction of the boats will be resumed in 2013 when the boat will be included in the 2013 state defense order. It is also reported that the head boat B-585 "Saint Petersburg" pr.677 at the end of September 2012 will begin the transition to the Northern Fleet, where to dive at extreme depths and in the future will be on combat duty. 25.09.2012, the boat was still in the Baltic Sea.

- 2012 October 26 - unofficial information that the submarine B-585 "Saint Petersburg" pr.677 in 2012 will not move to the Northern Fleet of the unwillingness to move the submarine systems - including radio-electronic weapons.

- 2013 February 13 - General Director of "Rosoboronexport" Anatoly Isaykin told the media: "" Today, the decision to build a batch of these submarines by the Ministry of Defense of Russia accepted. Financing of construction is planned in the state defense order and trial operation of the submarine is in accordance with a program that succeeds. "Currently, the parent submarine B-585" St. Petersburg "is in Kronstadt and is preparing to move to the Northern Fleet" to complete the trial operation " ( source ). Move the boat to the Northern Fleet is planned for the summer of 2013 ( source ).

- 19 March 2013 - in 2013 to begin completion of the second boat project 677, the pressure hull of the boat is ready. Delivery of the second boat fleet is planned for 2016 ( source ).

- 9 July 2013 - entered into force on a contract to build the first production submarine project - "Kronstadt". Letting ships of the fleet is scheduled for 2017 ( source ).

- 2013 July 15 - CEO of CKB "Rubin" Igor Villeneuve told RIA "Novosti" that the construction work on the second series of submarines pr.677 "Sevastopol" at Admiralty Shipyards are already underway. CDB "Ruby" issued to "Sevastopol" appropriate documentation, and now the contract between the Ministry of Defense and the factory for the completion of the boat is under detention. As for VNEU, the first production of submarines ("Kronstadt") equipped with VNEU will not, and on the second series boat ("Sevastopol") until the solution is not accepted by the Navy. Prototype VNEU CDB "Ruby" is planning to present the Navy until 2016, after which it will be decided to equip VNEU one way or another boat.

- 2013 July 29 - reported on the status of the construction of the submarine pr.677D "Kronstadt": the bow and stern of the boat blocks are in the workshop №9 Admiralty Shipyards, until 2009 units passed hydraulic tests and all the technological stages of control. Part of the foundation of hull structures and elektroslesarnogo saturation body that were previously installed in the blocks do not meet the new-corrected drawings. Therefore, at this period, need a creative approach - saturation of the need to leave, the other will have to endure, and often does dismantle, it is also necessary rebuild compartments in accordance with the new working design documentation.

- 2013 08 October - The Ministry of Defense reported that 10 oktbyarya 2013 submarine "Saint Petersburg" for deep testing comes in Polyarny Murmansk region.

- 2013 October 17 - submarine "Saint Petersburg" came in Polyarny Murmansk region. Delay in transit occurred due to severe weather conditions during the transition in the Norwegian and Barents Seas ( source ).
 
.
.
The Indian Ocean riposte
The Modi government signals a new push into the Indian Ocean with a diplomatic offensive and naval expansion to counter China's growing presence

nucl_032715115323.jpg
Narendra Modi in Mahe, SeychelOn February 18, the Cabinet Committee on Security (CCS) formally cleared India's single-largest defence project: a joint Defence Research and Development Organisation (DRDO)-Bhabha Atomic Research Centre (BARC)-Navy project to build six nuclear-powered attack submarines or SSNs for roughly $12 billion (Rs 74,400 crore). This mammoth 'Make in India' project, nearly the size of the budget allotted this year to the three services to buy hardware ($15 billion), was not an isolated policy decision. Less than a month after he chaired the CCS, Prime Minister Narendra Modi visited the Indian Ocean littoral countries of Seychelles, Mauritius and Sri Lanka, vital to India's maritime security framework. Here he gifted patrol aircraft, commissioned a warship and secured long-term access to the southern Indian Ocean (see box).

A senior naval official says India's ramped-up Indian Ocean push is a direct response to the expansion in China's naval capabilities including submarine deployments in the Indian Ocean over the past year, and oceanographic surveys meant to legitimise its presence in the region.

India's response is part of a recognition of not just its maritime capabilities, a comprehensive linkage between diplomacy and power projection capability and the fact that China's game plan has huge security implications. "We look at capabilities, not intentions. Intentions can change overnight. If the Chinese have the capability to base their ships in the Indian Ocean Region, it has huge security implications for us," the senior naval officer adds.

THE CHINA GAMBIT

China's increased Indian Ocean presence is part of a $40-billion Maritime Silk Road unveiled by Xi Jingping in 2013. "Shorn of all the commercial hype, the Maritime Silk Road is a proprietary set of Sea Lines of Communication that will accelerate its drive to draw Africa and the Indian Ocean littorals into its resource access network," says Vice Admiral Vijay Shankar, former chief of the Indian Strategic Forces Command. "Intrinsic and yet left unsaid to the establishment of such a proprietary maritime web is the ability to secure and control it. This would place in perspective the modernisation and growth trajectory of China's navy."

Yet, even until 2012, China's entry into the Indian Ocean was confined to anti-piracy patrols in the Gulf of Aden.

Beijing remained preoccupied with acquiring dominance in the Yellow Sea, the Taiwan Straits, the East China Sea and the South China Sea around it. A 2012 study, 'Non Alignment 2.0', by a group of scholars including former foreign secretary Shyam Saran, recommended that India use a window of opportunity to build up its naval capabilities in the Indian Ocean.

But China's rapid-fire deployments of three submarines-two SSNs and a conventional submarine-in just a year indicated that this window was rapidly closing. China has a force of more than 60 submarines, including a dozen nuclear-powered platforms. Its sustained Indian Ocean deployments have signalled its ability to undertake long-range missions off India's coast. China's deployments coincided with a critical decline in India's submarine arm-it has 13 conventional diesel-electric submarines, although 24 are required. The navy currently operates a single SSN, the 12,000-tonne Akula-II submarine INS Chakra, on a decade-long lease from Russia since 2012. A project to indigenously assemble six French Scorpene submarines is five years behind schedule. Contracts to build six more conventional Project 75I submarines are yet to be awarded.

Late last year, the NDA government dusted out a 2008 naval proposal for six SSNs, thereby joining a group of Asian nations-Vietnam, Indonesia, Singapore and the Philippines-that are rushing to acquire submarines to protect their territorial waters in the face of a rising China.

nuclea_032715115323.jpg
THE ATTACK SUBMARINE

The Indian Navy's Maritime Capability Perspective Plan unveiled in 2005 envisages a 160-ship navy with 90 capital ships such as frigates and destroyers. Besides seven P17A frigates for $7 billion (Rs 45,000 crore), the government has cleared projects for five fleet support ships, approved a third aircraft carrier and four landing platform dock ships that will project power in the Indian Ocean. Yet, it will be the six SSNs that will form the lynchpin of India's response to the Chinese navy.

The navy envisaged multiple roles for a future nuclear-powered attack submarine fleet: two SSNs each to escort each of the three Carrier Battle Groups, protect the "bastion areas", or bases of the Arihant-class SSBNs, and hunt enemy submarines in the Indian Ocean Region. In the event of a Chinese offensive in the Himalayas, the SSNs will form the backbone of a future Indian riposte. They will run interdiction missions at vital choke points and conduct operations in enemy waters.

All of these tasks are presently carried out by a solitary INS Chakra, which is to be supplemented by a second SSN, possibly the Kashalot to be leased from Russia for $2.7 billion in 2018. "SSN's utility in denial operations, raising the cost of hostile military intervention and shadowing high-value units such as carrier groups and SSBNs, is unparalleled," says Shankar.

The SSN project comes at a time when India's three-decade-old nuclear submarine project is finally coming up to speed. The INS Arihant or the S2, the first of a class of four 6,000-tonne ballistic missile submarines, recently began her sea trials in Visakhapatnam.

The submarine's performance in surface trials has enthused naval officials to plan for its commissioning in December this year. The INS Arihant cost around Rs 6,000 crore to build and can carry either 12 short-range B0-5 missiles or four K4 nucleartipped ballistic missiles with a range of 3,500 km. The DRDO has set up an SSN cell headed by a retired vice admiral in its nuclear submarine building hub, the Ship Building Centre (SBC) in Visakhapatnam. The navy's Delhibased Submarine Design Group is now working to complete a design for these undersea vessels in the next two years. The shipyard to build the vessels is yet to be decided but officials say this programme will run parallel to the seven strategic submarines of the Advanced Technology Vessel Project (ATV).

THE TECHNOLOGICAL CHALLENGE
At roughly Rs 12,000 crore a unit, one SSN would equal the cost of two 7,500-tonne Project 15A Kolkata-class destroyers. Cost, however, has never been a hurdle. The belief in the need for a nuclear navy has led a series of PMs from Indira Gandhi to Narendra Modi to ensure generous budgetary support.

The ATV programme has spent over Rs 30,000 crore, most of it in secret funds which do not form part of the defence budget. Politicians have occasionally questioned if they were getting value for money. In 2005, then finance minister P. Chidambaram, a member of the apex political committee steering the classified project, wondered why the Arihant, costing over a billion dollars (Rs 6,200 crore), carried only four missiles. The project team doubled the missile load on three subsequent vessels. The only challenges in the project have been technological. The CCS approval marks the start of a new challenge for scientists and nuclear engineers.

Nuclear submarines are powered by compact reactors that produce heat from fission to run a steam turbine. Unlike conventional submarines, a nuclear sub does not have to surface periodically for air to run its diesel engines. Yet, the technical challenge of designing and fitting a compact reactor inside a space the size of a two-storeyed building is insurmountable for all but the P5 countries which build such vessels.

India's ATV project started as a troika of agencies. Steered by the DRDO which also developed the vessel's long-range ballistic missiles, it was staffed by naval project teams that brought in design expertise and BARC that built and developed the reactor. By the late 1990s, it had spent over Rs 2,000 crore on its classified ATV programme without results. The failure to produce a submarine had in 1998 piqued then navy chief Admiral Vishnu Bhagwat to call for a technical audit. Considerable Russian design assistance that followed the May 1998 nuclear tests breathed new life into the project. Even so, it took the Arihant 15 years from the start of construction to begin sea trials. The navy fought a pitched but unsuccessful battle to wrest the project away from DRDO control five years back.

A former DRDO chief is optimistic about the next line of submarines. "We are on schedule with the SSNs and we have the capability to design the submarine and build the reactor," he says.

The six SSNs will be a spin-off from a project that is building four Arihantclass SSBNs or ballistic missile-firing nuclear submarines. The downstream effect of this Make in India project will be tremendous. One private sector official says the $12-billion project will have a force multiplier effect of $40 billion on the Indian economy, generating over a million skilled jobs and sustaining the ecosystem that has grown around the ATV project.

One admiral points out that while the SSN will be Arihant's size, designing and building it will be far more challenging as both platforms have different tasks. An SSBN like the Arihant is a stealth underwater bomber ready to launch nuclear-tipped missiles at an adversary. Its reactor needs to deliver steady speeds as it prowls undetected.

An SSN, on the other hand, is like a fighter jet. It needs a high-performance nuclear reactor which delivers tremendous speed with rapid acceleration and deceleration. It needs a reactor that can perform multiple tasks such as pursuing enemy warships and striking land targets. Opinion seems to be divided regarding the type of reactor that will power the SSN.

BARC wants the Arihant's 83 MW reactor to lead the way. "It's better to build on a proven design. The SSN should have a compact version of the same reactor," says Anil Anand, former head of the BARC reactor design team. A former admiral, also part of the project, differs and calls for a new 190 MW reactor such as the one on the Chakra to be designed.

The new SSN programme, experts say, is an opportunity to learn from past mistakes. Admiral Arun Kumar Singh, former eastern naval commander, calls for stringent supervision to ensure the project stays the course. "The Prime Minister must monitor its progress every year and the defence minister every three months. Otherwise what happens is that the DRDO gives us ambitious projections which it fails to meet," he says. Clearly, old ghosts will continue to haunt the project.
 
.
Sorry for ignorance is lada class and amur 1650 same.???? i have heard lada is most advanced sub of russia.how does it compare with soryu which is probably best non nuke sub
 
. .
Back
Top Bottom