LCA or Arjun is disaster and so with INSAS in which is crap, but not with other India project, their Akash missile is still going on, their electronic warfare equipment is turned out good enough, their Tata industries is still performing good and delivered a firm design for armored vehicles, and so with other project. You must not bias about their manufacturing capability, although must be admitted the recent results is turn out of the favor and fell from adequate standard. I think you as Pakistani must knowing first hand if India had a huge manufacturing output in armaments although many of them is licensed production from abroad design.
what else is that you must knowing Arjun had reliability issue with operational level readiness