What's new

Turkish Naval Programs

There is nothing serious as that mentioned, the ban would cover possibly the equipment which is used in syria.
Same happened a few years ago while Turkey was fighting PKK in cities, Germany has banned sales or spare parts,but then lift the ban. And gearbox or engine deal was uneffected (for milgems) back then.

As far as I know, There are 4 different models designed under the MILGEM program.

ADA and I class were built for Turkish Navy.

The variants planned for sale to other countries and represented by the code names LF-2400 and CF-3500 were not built. In addition, Delta Marine and STM have a MILGEM-based OPV work called C-1200.

The Jinnah class will be the 3rd variant to be built. However, the superstructure layout is very similar to the CF-3500 which is proposed for the Colombian tender.

stm-xcf-3500.jpg
There could be even more conceptual designs. I used to say it in here years ago that there were at least 4 models and one of them had VLS in almost same sizes. (dedim dedim inanmadınız :) )
 
.
German economy is not going like it was for 2-3years ago. It would be stupid if they ban everything to army. well its their choice. Imagine a 3million refugee flood on that economy and its over for EU
 
.
German economy is not going like it was for 2-3years ago. It would be stupid if they ban everything to army. well its their choice. Imagine a 3million refugee flood on that economy and its over for EU

Erdogan will never do such stupid movement.
 
. . . . . . . . . . . .
National Submarine Project Started at October 15th, 2019

The National Submarine (MİLDEN) project, which constitutes the second stage of the Air Independent Propulsion (AIP) submarines of the Navy Command, has officially started. Speaking at the Ninth Maritime Systems Seminar, Deputy General Director of the Shipyards of the Ministry of National Defense, Rear Admiral Mehmet Sarı, made a presentation about the MİLDEN Project. According to Sarı's statement, the first cadres were appointed and the first appointments were made.

After the completion of the design activities for the National Submarine, the planning period for construction will begin. The first submarine is expected to be completed by 2040. The technology and information package obtained from Germany will be used in the design and construction of this submarine.

http://www.c4defence.com/Gundem/milli-denizalti-projesi-basladi/8813/1
 
.

Country Latest Posts

Back
Top Bottom