What's new

Thunder on LOC Patrol

3.5 hr endurance in that configuration is pretty good I think. I would assume for normal peacetime patrol there is no need to refuel. The pilot might as well land and have a rest, let another pair of fighter takeover.

Dubai Performances 1.jpg


So when Dual Missile Rack is gonna be inducted in SD-10??
I assume for patrols like this a lighter load is better for long endurance and also that missiles have limited captive hours.
 
3.5 hr endurance in that configuration is pretty good I think. I would assume for normal peacetime patrol there is no need to refuel. The pilot might as well land and have a rest, let another pair of fighter takeover.

View attachment 447434


I assume for patrols like this a lighter load is better for long endurance and also that missiles have limited captive hours.

Aim-120 over 1200 hours vs r-77 about 100 hours

Not sure sd-10a air time life stipulated by Oem
 
integration rate in really slow for JF-17s into PAF.

Hi,

Integration is a long process---.

The Paf and its fan boys had made it look like a piece of cake---which it was not---.

If the French EW suite was a go from the begining---it would have been around a 8-10 years process---.

With e different EW suite---around 10-15 years---.
 
3.5 hr endurance in that configuration is pretty good I think. I would assume for normal peacetime patrol there is no need to refuel. The pilot might as well land and have a rest, let another pair of fighter takeover.

View attachment 447434


I assume for patrols like this a lighter load is better for long endurance and also that missiles have limited captive hours.

And compare that to Tejas in combat load at 59min, same article says Gripen at 3.5hrs & F-16 at 4hrs.
https://www.indiatoday.in/mail-toda...-fighter-planes-ajit-doval-1083350-2017-11-10

How many maintenance hours needed for JF-17 per flight hour?
 
Hi,

Integration is a long process---.

The Paf and its fan boys had made it look like a piece of cake---which it was not---.

If the French EW suite was a go from the begining---it would have been around a 8-10 years process---.

With e different EW suite---around 10-15 years---.
I agree general, but only 48 jets in 14 years is a very slow pace. I guess we have no choice than to keep working on this project.
 
Last edited:
And in last 11 years, not 14. First JF-17 to join PAF was produced in 2007. And the first Pakistan produced JF-17 was actually in 2009, the 09-111 to be specific.
 
Hi Windy,

This is such a dumb photo---.

Without a ladder---is the pilot going to jump into the cockpit---.
If they did not think of this due tk weight; they probably don’t recall the chaos of conflict.
F6CC6DB5-E526-4B84-8D22-B9E715B8217B.jpeg
5CB7DA8B-0811-4D96-881D-1923F70B8118.jpeg
F7BFA594-839B-4924-A79A-ABE247A6885C.jpeg
 

Back
Top Bottom