What's new

Stealth version of India's Light Combat Aircraft [LCA] Tejas, Mk. 3 on the

Unless these projects are serially produced and ordered in number by our armed forces, they won't fetch a penny in profit.
actually they can if the Pvt industries are given the license to these tech.. Most of them are closed to th epvt Industry however, a mechanism should be create so that the pvt players cannot store sensitive tech but should have access to them (Something like a complex created by the govt. and letting the pvt players to come in and develop things there itself)
 
. .
More Stealthy version,this version will be as stealthier that the project itself will never be visible.

Excuse:Im not against LCA ,but against the DRDO babus.

They r not always reasponsible. Its gov. no not gov but so called NETAS who do not provide finance. i dont thing the strength of people is more at the drdo. there r always problems of lack of staff or finance. In building indegenious plane at last stage gov told to use turboget instead turboprop or propellers. which affect the project worst. the upper post r always filled up by "Chamchas" who use goody words for the people. no surprice of saraswat. need better things we can not purchase missiles from foreign and see drdo has made world class missiles of varities.... if appropriate finance given mark 3 can even fly within few years.
 
.
Nothing wrong with moving TEJAS from block 1 to block 2 7 then block 3

THE PAF are planning to do the very same with JFT

AND I THINK the chinease will move J10 to block b & block c

BUT PLZ dont confuse this with a stealth upgrade.

IMO the bench MK3 TEJAS should be com,parable to the GRIPEN NG which the swedes claim is a 4th++ FIGHTER

IF we are honest

MK1 tejas x 40 planes is a MIG21++
MK2 TEJAS X 100 planes 4th gen gripenc/d type
MK3 envisdaged 4TH gen ++ gripen ng type
 
.
LCA tajes project strated in 1983
which makes 29 year
longest project in aircafts histroy

wait dude for block 2 with AESA rader blvied to fited with chines IRST
with SD-10B missile
with Ra,ad cruise missile (ACLM)
 
.
Younis.

in reply
LCA tajes project strated in 1983
which makes 29 year
longest project in aircafts histroy


Source: http://www.defence.pk/forums/indian...ircraft-lca-tejas-mk-3-a-4.html#ixzz202JKuJXY

Yes india took 29 years to develope TEJAS and even this carries USA engine & israeli tech in cockpit//////


PAKISTAN

has been in existence since 1947 THATS 65 years they are yet to develope a HELICOPTER let alone a real war plane like TEJAS.


ps NO THE JFT THUNDER does not count since china developed this for you in CHENGDU china....
 
.
tejas was always stealth..
So stealth that nobody sees it flying..
 
.
tejas was always stealth..
So stealth that nobody sees it flying..
Hey you stole my joke...I called it 7th gen aircraft coz nobody has seen that plane :D

Witness: Irfan Baloch
Venue: Stupid and Funny All Around The World-2
:D

@topic
People of other nationalities should gather more knowledge before commenting on other nation's project. Goes for both the countries.:drag:
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom