What's new

Pakistani Roads, Motorways and Highways

View of 367 Km Lahore Islamabad Motorway M-2
Sargodha, Bhera: M-2 Motorway (Islamabad-Lahore) at Bhera Service Area [#Sargodha #Bhera #Pakistan #Motorway

FB_IMG_1550319455428.jpg
 
. .
1.6 Km layyah Taunsa Bridge 4 lanes at River Indus under construction.. It would reduce distance between Layyah and Taunsa with Indus Highway (N-55) by over 150 km . It will link shortly Indus Highway and CPEC Eastern Route Faisalabad Multan Motorway (M-4) for Baluchistan transport. Photo Credit:Abbas Khan

FB_IMG_1550516991593.jpg
FB_IMG_1550517000007.jpg
FB_IMG_1550517003574.jpg
FB_IMG_1550517008674.jpg
FB_IMG_1550516986881.jpg
 
. . .
New Intelligence Transport System ITS Model at 230 Km Lahore AbdulHakeem #Motorway M-3 in Pakistan.
Variable Message Signs Display night vision testing at Motorway M-3.Lahore Multan Motorway will be operational in March 2019.


52518113_1889897894471233_6184817128885977088_n.jpg


52300424_1889722837822072_3364168520551104512_n.jpg
 
. . . .
New Intelligence Transport System ITS Model at 230 Km Lahore AbdulHakeem Motorway M-3 in Pakistan.

Variable Message Signs Display night vision testing @ Motorway M-3.Lahore Multan Motorway will be operational in March 2019.


52961222_1890333721094317_1581604294954582016_n.jpg




52606051_1890333767760979_8416651263109758976_n.jpg
 
. . . . .
CPEC East West Corridor: Upgradation of N70 National Highway (Multan-Qila Saifullah) at Girdu Hills near Fort Monroe in DG Khan started in late 2016.
The road from Multan to Qila Saifullah is being improved and widened to link it up with the road network under the China-Pakistan Economic Corridor (CPEC).
The project is to be executed in three phases at a cost of Rs23 billion.
The first phase of ‘improvement’ of N-70 (national highway) commenced with the funding of Japan International Corporation Agency (JICA).
Starting from Rakhi Gaaj-Khar-Bewata, the project aims to make the hilly portion of the road wide and safe for Gwadar-bound cargo traffic with the installation of eight steel bridges.
Uniqueness of the project is that it includes 1-km-long steel bridge, the very first of its kind being introduced in Pakistan.
The hilly portion of N-70, which was constructed in the late 19th century by the British engineers.
It had seven difficult turns to negotiate to climb up the high mountain of Girdo to reach For Munro or Bewata.
33-kilometre long tough hilly portion of N-70 would be widened and improved with installation of eight steel bridges having a total length of 1.5 kilometre.
The Japanese engineering company Japanese Taisei Corporation, which had made Kohat tunnel is working on this project.

FB_IMG_1550900292516.jpg
FB_IMG_1550900287354.jpg
FB_IMG_1550900284005.jpg
FB_IMG_1550900302218.jpg
FB_IMG_1550900297508.jpg
FB_IMG_1550900310987.jpg
FB_IMG_1550900306794.jpg
 
.
Back
Top Bottom