What's new

PAC HANDS OVER 70 JF-17 FIGHTER JETS TO PAF, NA TOLD

. . .
.
dont u think we have been waiting too long i remember last year during december PAC announced the production of 16th JFT that year bringing the total number produced to 66 in january 2016 and they claimed they were planning to expand the production per year to 24 so going by their previous press release they only produced 4 JFTs this year
http://nation.com.pk/national/29-De...al-production-target-of-indigenously-produced
I believe some may be at final stages on assembly line, few under tests and may be some have been upgraded from block 1 to 2 standard during this period.
 
.
dont u think we have been waiting too long i remember last year during december PAC announced the production of 16th JFT that year bringing the total number produced to 66 in january 2016 and they claimed they were planning to expand the production per year to 24 so going by their previous press release they only produced 4 JFTs this year
http://nation.com.pk/national/29-Dec-2015/jf-17s-fly-high-in-pak-skies-pakistan-meets-annual-production-target-of-indigenously-produced


We have to deal with what we can ... PAC has come a long way rather then bashing it we must embrace it they and PAF know what they are doing simply.
 
.
But 2p29 is also ready then we must have at least 78 thunders...why only 70? does that include the CCS squadron?
 
. . .
replacing A-5's, Mirages and F-7's, with one platform !

is that good for us?
 
. .
I believe some may be at final stages on assembly line, few under tests
most probably
upgraded from block 1 to 2 standard
upgradation of old blocks wont happen until the required number of operational jets arent produced
We have to deal with what we can ... PAC has come a long way rather then bashing it we must embrace it they and PAF know what they are doing simply.

i m not bashing anyone i m just saying there is no fraking way they can go from 16 jets to 4 jets per year
 
.
But 2p29 is also ready then we must have at least 78 thunders...why only 70? does that include the CCS squadron?

70 probably means fully operational and handed out

We probably have another 15 or so going through various production/manufacturing, some will be almost complete
 
. .
We must also remember we are upgrading block 1s at the same time
 
.

Latest posts

Back
Top Bottom