What's new

Naya KPK | News & Updates on the development in KPK.

.
#News


Imran Khan forms a special committee to monitor KPK government functioning.

Yaar Jo Bhi Karna Hay KPK Ke Saath Karo Lekin Ye Loadshedding Ka Kuch Karo Please... 16 - 18 Gantay Ye Kia Zulm Ho Raha Hay Yaar...

Sub Kamo Ko Goli Maro Bijli Ke Maslay Ko Sub Se Pehlay Hal Karo.

Yes, it is just to make things worse before the atami nawaz sharif sworn in, and then magically things would become normal like 6-8 hour loadshedding and mian sahib would claim that he has done it in days... #Pathetic
 
.
Just before someone raise fingers on the integrity of Dr.Ata ur Rehman. Please those who do, visit NUST, COMSATS, UET LAHORE, FAST, GIKI, NED and every other engineering institution and ask them about Dr. Ata ur Rehman. This man revolutionized the higher education in Pakistan and if there are so many PHD Doctors in Pakistan who studied from abroad, that's due to HEC scholarships program started during his tenure

truly a great man, hope he proves to be the one KPK needs...

no one can raise finger on Dr Atta ur Rehman. one who does, himself is abu jahil ki ulad and nothing more !!
 
. .
#News


Imran Khan forms a special committee to monitor KPK government functioning.



Yes, it is just to make things worse before the atami nawaz sharif sworn in, and then magically things would become normal like 6-8 hour loadshedding and mian sahib would claim that he has done it in days... #Pathetic

Honestly speaking the only thing KPK people concerned about is this damn load shedding. I don't know if PTI is going to solve this either for us.
 
.
Honestly speaking the only thing KPK people concerned about is this damn load shedding. I don't know if PTI is going to solve this either for us.

Khan Sahab,,, Jab 2009-2013 tak kuch nahi kiya us ganjay nay CM punjab ban kar bijli ka tu ab kia kar lai ga.... And honestly speaking,,, This load shedding mess requires lots of money because 60 percent of elec generation is based on thermal and we don't have money for oil bills.
 
.
Honestly speaking the only thing KPK people concerned about is this damn load shedding. I don't know if PTI is going to solve this either for us.

PTI is not in federation, so they wont have much say in over coming mismanagement or circular debt, but it can and it must initiate projects to built its own capacity, this would take time.
 
.
Khan Sahab,,, Jab 2009-2013 tak kuch nahi kiya us ganjay nay CM punjab ban kar bijli ka tu ab kia kar lai ga.... And honestly speaking,,, This load shedding mess requires lots of money because 60 percent of elec generation is based on thermal and we don't have money for oil bills.

PTI is not in federation, so they wont have much say in over coming mismanagement or circular debt, but it can and it must initiate projects to built its own capacity, this would take time.

What does 18th amendment say about energy generation?
 
.
Honestly speaking the only thing KPK people concerned about is this damn load shedding. I don't know if PTI is going to solve this either for us.

Asad Umar and others have frequently said that they will generate power from new sources in KPK, so they do have some sort of plan.

But the provinces can generate power only in small amounts, 100-500 MW range, they don't have enough resources or cash to construct larger capacity projects.

The onus will be on federal government.
 
.
What does 18th amendment say about energy generation?

electricity capacity is with provinces.. but any project will have to take upto 2 years. even the smallest would take more than a year... KPK is naturally a perfect place for hydro, hundreds of projects can be built in 1-2 years of 1-100 mega watts

but for the time being fingers are crossed while looking at Mian sahib that he may beg his Saudi master some oil and money. but that too would be a short live solution, the real solution must come up with hydro/nuclear/coal projects.
 
.
Asad Umar and others have frequently said that they will generate power from new sources in KPK, so they do have some sort of plan.

But the provinces can generate power only in small amounts, 100-500 MW range, they don't have enough resources or cash to construct larger capacity projects.

The onus will be on federal government.


electricity capacity is with provinces.. but any project will have to take upto 2 years. even the smallest would take more than a year... KPK is naturally a perfect place for hydro, hundreds of projects can be built in 1-2 years of 1-100 mega watts

but for the time being fingers are crossed while looking at Mian sahib that he may beg his Saudi master some oil and money. but that too would be a short live solution, the real solution must come up with hydro/nuclear/coal projects.

The had a plan for a countrywide power generation. Now since they're in charge of KPK only, what options they've to generate electricity for this province?

They cannot build Kalabagh dam... the dams which are already in service are in a poor state of service and needs a complete overhaul which comes under the authority of Federal Govt... the Govt. too owes billions to PSO, and if they get paid in time we might see a tremendous decrease in Loadshedding... but these scenarios are based on assumptions with no hope of improvement.

Anyway, I'm unable to find a concrete plan of PTI for small power generation projects... can someone please post the details here.
 
.
The had a plan for a countrywide power generation. Now since they're in charge of KPK only, what options they've to generate electricity for this province?

They cannot build Kalabagh dam... the dams which are already in service are in a poor state of service and needs a complete overhaul which comes under the authority of Federal Govt... the Govt. too owes billions to PSO, and if they get paid in time we might see a tremendous decrease in Loadshedding... but these scenarios are based on assumptions with no hope of improvement.

Anyway, I'm unable to find a concrete plan of PTI for small power generation projects... can someone please post the details here.

Let them come into power, and see what projects they initiate at their own, but still if federal is uncooperative then these projects may start adding electricity only after 2 years or so in the system..

Peshawar's daily requirement would be around 100 Mega watt in my opinion, so maybe river Kabul can be a place to built such a dam.

but here I would like to point out that a major portion doesnot pay electricity bills in KPK as compared to Punjab, so the revenue to be invested in a dam by province, may require foreign investment or private investment (out of sheer love of people by diaspora Pakistanis) but if sovereign guarantee is not given by federal, we will have to fight for it on different platforms.
 
.
1369111475_7.gif


1369111551_15.gif
 
.
@Leader @AstanoshKhan

This Chinese company already worked on small-sized hydral power projects.
In Sarhad they should try to build as many of such small-scale dams as their pocket allows.
Having more small dams rather than fewer larger dams is also safer from strategic POV, as if few are hit in a war we won't lose ALL capacity suddenly.

-

sinotec

Installation and commissioning of Marala Hydro Power Plant

Installation and commissioning of Pakpattan Hydro Power Plant (Link)


They can also work on coal & solar (& wind may be!)... these might be quicker to set-up.

-
-
-

FEASIBILITY STUDY IN HAND (HYDROPOWER PROJECT)
Many of these feasible dams are in Soba Sarhad...

(LINK)


-
-
-

Some Other links:

Soan Dam:
http://inamre.blogspot.ca/2013/04/soan-dam-project-overview.html
http://inamre.blogspot.ca/2013/04/soan-dam-bright-future-of-pakistan.html

Comparison of Soan Dam to other alternatives:
http://inamre.blogspot.ca/2013/04/soan-dam-comparison.html







Water map of Pakistan:
http://inamre.blogspot.ca/2013/03/a-very-special-map-of-pakistan.html

Kabul-River Basin:
http://inamre.blogspot.ca/2013/03/kabul-river-basin.html
 
Last edited by a moderator:
.
Will eid now be synchronized with the whole country? :D

Only once, pretty please.....
 
.

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom