What's new

ML-1 railways agreement signed

ghazi52

PDF THINK TANK: ANALYST
Joined
Mar 21, 2007
Messages
104,350
Reaction score
106
Country
Pakistan
Location
United States
Pakistan, China sign ML-1 railways agreement

April 28, 2019

1556443879.jpg


Pakistan and China have also signed the ML-1 Railways agreement under which a double track from Peshawar to Karachi will be laid.

The document was signed by Prime Minister Imran Khan and his Chinese counterpart Li Keqiang in Beijing today.

In a statement in Beijing, Minister for Railways Sheikh Rashid Ahmed said it is a great day in history of Pakistan Railways.

He said that the speed of the train at the new track will be 160 kilometers per hour.
 
Standard Gauge, right?
 
CPEC’s investment share for Pakistan Railways was $8.2 billion, which was to be utilised for upgrading Main Line-1 (ML-1) a colonial-era line stretching 1,872 km from Karachi to Peshawar.

Rasheed announced that he is going to start a standard gauge track in between Karachi and Peshawar junctions. The existing track is a broad-gauge track and is due to be rehabilitated and upgraded under the CPEC.

1. The Broad Gauge Track is 5 ft 6 in i.e. 1676 mm

2. The Standard Gauge Track is 4 ft 8 1⁄2 in i.e. 1,435 mm

This means that the Standard Gauge Section of Pakistan Railways will have to be provided with a Brand New Track as well as Locomotives, Passenger Coaches and Railway Wagons as the following Railway Stock will not be able to be used :

PAKISTAN RAILWAYS YEAR BOOK 2017-2017

PLANT & EQUIPMENT Unit.===2016-2017
Route - Kilometres Kms.=====07,791
Track - Kilometres Kms.=====11,881
Locomotives. Nos.=========00,455
Coaching Vehicles No.======01,466
Other Coaching Vehicles No==00,270
Freight Wagons===========16.086

As such Pakistan - having such a large number of Locomotives, Carriages and Wagons will have to buy a Full New Rail Stock for the Standard Gauge Section of its Railways.

screenshot_20190428-193944-png.556731


.
 
Back
Top Bottom