if formally any one of the 3 planes - F16,F18 and Saab gripen- any one is chosen as a MII line, a separate sticky will be created and this will be removed surely.
Till the time being since there is always 4-5 articles more or less every month and we dedicate and debate about them in separate thread , its necessary that this sticky thread is used for better collation of such news and discussions.
Combining this post with another here
Tagging
@Abingdonboy too as this is a more appropriate thread for this.
There are two aspects. One the Mig29,Jags and Mirages would be used for another 15 years with reduced number of hours per year flight hours to sustain their life and will be retired from 2030 onwards (give and take couple of years)
The production numbers of new jets inducted of say when these above jets retire
LCA Mk2 - 16
Rafale MII - 16
FGFA - 8
Minus
1 squadron ~ 18- 20
----------------
Total new jets inducted 20-22 new jets per year.
So ideally it should balance it out.
Now if we consider LWF of F16/Gripen E
This thread has some of the views
https://defence.pk/threads/indian-airforce-mmrca-lwf-alternate-discussion.448646/
Its about possible permutation combinations
Coming back to the point of say F16/Gripen E as second line
Assuming F16 uses the present Mig21 base infrastructure with minimal change , The cost of F16 Blk 70 as given by newspaper as $70Mn +other support packages + say Derby, Derby ER and Python combo + training simulator etc etc will cost anything in upward of $120 Mn
Assuming Saab Gripen E as LCA Mk2 (which is a wrong move as per me and i have said this to Saab), it will cost again in a similar cost for a package in and around $120+ Mn and even more owing to certain new specs and additional cost bcz of the much superior tech in Gripen .
The purpose of LCA Mk1A with such packages and weapons will all inclusive be around $60 Mn or 50% of this cost.
Its true capability wise Gripen E will be multiple of LCA MK1A but so is also 2-2.5X cost.
This implies if we justify Saab Gripen E as LCA MK2, either we have to drop F16 packaged deal or we have to get this package at best say 10-15% superior price to LCA Mk2. Implying if we get say flyaway also at $45-50Mn and all inclusive package price of say $70-75Mn for a Block 70 F16, yes it can be justified saying its additional capabilities at a suitable but manageable premium. And prime focus is to just get the numbers. In return keep USA happy and get something in bargain.
No doubt Gripen E will outclass and outsmart F16 Block 70. So if we are building a capability addition then i would prefer Gripen E as it gives me multiple effect of LCA and F16 . In such a scenario a little lower than 1:1 replacements wont eb bad also.
BUT
If we negate all cost stuff angle and focus on other points, Pilot training and evolving a matured strategy/tactic will take anywhere between 5-7 years. On top the surge in number of pilots required may also be a potential challenge . This does makes me feel LWF if needed does nt need a MII line.
Rather i would get say for example F16 from USA and get 5-6 squadron delivered between 2019-25 (6 years 6 squadron) and use the leverage and offsets in some other stuff /collaboration.
This helps me reduce time and unnecessary cost that comes with establishing MII line and waiting for so called benefit and TOT thing. Even reduce offsets if it gives a good bargained deal.
Incredibly such a move gives us the additional number by max by 2025 itself.
BTW my Gripen E POV in another forum
View attachment 335420
The Gripen E FOC is still some time awa. So negating the TOT part and if its for numbers credibly they can deliver more like in between 2023+ timeline post FOC attainment. So only viable soluton for quick numbers directly off the shelf is F16.
Now that goes against the very essence of a second line which aims at meeting the demands as well as creating a proper second aircraft manufacturing hub and MIC. This is as where the issue plagues me as both dont help us either.
The best solution according to me is using L&T and establishing a 16-24 jet per year line for LCA in private sector and start churning out HAL+L&T minimum 30-40 jets a year from 2021 onwards. Till MK2 comes keep churning our MK1A or a improved version of Mk1A+.
basically the cost benefit and established line and eco system helps us get a similar number like F16 with a much lesser investment. Not saying LCA Mk1A is more capable than F16 block 70 but it meets the numbers requirement quite easily. and also in a similar timeline.