As I said before Forces Goal 2030 is a joke.
There are some credible progress happening under Forces goal 2030. But the problem is current pace of progress is not enough to fulfill the stated aim within 2030. COVID-19 and economic shock caused by Russia-Ukraine war only slowed the already slow progress.
The progress I am talking about is mainly about structural and infrastructure related rather than weapon acquision which we most likely want to see. But before we induct large number of arms we need to organize our house first. We can not induct modern submarine unless we build modern submarine base at first. Similarly to house newer generaton fighter jets, we at first need to build modern air base with all facilities. Bangladesh's defence budget is still quite small and 10 years ago it was minuscule. So a lot of basic requirement for a modern armed forces were absent which we need to build first. I will mention some of the real progress happened under forces goal 2030-
1. Our army went from 7 infantry divisions to 10 infantry divisions within the last 8 years. Which mean it's manpower increased at least 40 percent. Not to mention building all those cantonments and other infrastructure to house these divisions. We farther need to attain full strength of all of these 10 divisions.
2. Acquisition of Submarine and under-construction of a Submarine base in Cox's Bazar with a cost of 1.2 billion Dollar with Chinese assistance. This is very significant as we aim to become a significant Submarine force in near future. A full fledged naval base with submarine birthing facility also being build at Patuakhali right now.
3. Establishment of Airbase in Dhaka, Cox's Bazar and ongoing construction of full fledged air base in Barishal and Sylhet. Procuring modern fighter jets would be futile if we can not give them proper housing and facilities. Modern radar units also set up at Cox's Bazar, Barishal etc.
4. Modernization of various shipyards and undertaking of building warships. Already build a number of vessels for navy and coast guard and launched a program to build six modern frigates with the technological collaboration with foreign countries in our shipyard. This is very significant if we want our navy furnished with ship indigenously supplied.
5. Establishment of an aeronautical center which enabled us to maintain, repair and overhaul aircrafts. Because of this aeronautical center, our air force engineers now started manufacturing spare parts and working on to build trainer aircraft for air force. This is the beginning of a long road of our ambition to supply our armed forces indigenously manufactured aircraft in the future.
6. Modernization and capacity enhancement of our ordnance factory. Few months ago,a military person on a tv show said that, ordnance factory 's ammunition production capacity increased 12 times in recent years. Moreover Ordnance Factory is establishing production line of manufacturing APC, IFV. Morters, missile and various other weapons for army . This is very crucial to enhance our real fighting capability.
These are some of the important things achieved or progressing under forces goal 2030. We have to keep in mind that, our defence budget is very limited. unlike our neighboring countries, defence is low on the priority list, Within this tight budget, our armed forces are working on multiple areas of capacity enhancement and indigenization. So big ticket foreign items are not coming as soon as we expect them to come. Maybe it will gather pace once our infrastructure deficit is largely overcome after a few years.