What's new

Kaveri Engine Project update

Kaveri-2.png


Kaveri+&
 
. .
Tarmak007 -- A bold blog on Indian defence: Kaveri undergoes more flight trials in Russia
KAVERI UNDERGOES MORE FLIGHT TRAILS
http://4.bp.blogspot.com/_5sP7XwykNSM/TOx30ZGyn_I/AAAAAAAACxI/sYeTeFn9kdM/s1600/Kaveri-2.png
|By Anantha Krishnan M.|AVIATION WEEK|Bangalore|India|November 23,2010|India¡¯s Defense Research and Development Organization (DRDO) and Russia¡¯s Gromov Flight Research Institute (GFRI) have conducted more flight trials of India¡¯s Kaveri engine on a modifiedFlying Test Bed (FTB) IL-76 transport aircraft.Mohan Rao, director of the Gas Turbine Research Establishment2010|India¡¯s Defense Research and Development Organization (DRDO) and Russia¡¯s Gromov Flight Research Institute (GFRI) have conducted more flight trials of India¡¯s Kaveri engine on a modifiedFlying Test Bed (FTB) IL-76 transport aircraft.Mohan Rao, director of the Gas Turbine Research Establishment (GTRE) in Bangalore, told Aviation Week that flight data analysis fromthe first flight on Nov. 3 was submitted to GFRI officials, who presented a detailed report to Russia¡¯s Ministry of Industries.¡°Based on this report, we got the clearances for further flights. We had the second flight after a week for more than an hour in very similar conditions to the first flight,¡±Mohan said. ¡°The engine was inspected again and all flight parameters were analyzed. During the second flight, we went up to 5 km. at 0.6 Mach and 4 km. at 0.4 Mach. We need to study the engine data and combustion stablity.
 
. .
Kaveri Engine Undergoes More Flight Trials In Russia

India’s Defense Research and Development Organization (DRDO) and Russia’s Gromov Flight Research Institute (GFRI) have conducted more flight trials of India’s Kaveri engine on a modified Flying Test Bed (FTB) IL-76 transport aircraft.

Mohan Rao, director of the Gas Turbine Research Establishment (GTRE) in Bangalore, told Aviation Week that flight data analysis from the first flight on Nov. 3 was submitted to GFRI officials, who presented a detailed report to Russia’s Ministry of Industries.

“Based on this report, we got the clearances for further flights. We had the second flight after a week for more than an hour in very similar conditions to the first flight,” Mohan said. “The engine was inspected again and all flight parameters were analyzed. During the second flight, we went up to 5 km. at 0.6 Mach and 4 km. at 0.4 Mach. We need to study the engine data and combustion stability.”

GTRE officials checked close to 50 test points, including low Mach number, low altitude, and high altitude. In one test, the Kaveri was on switch-off mode while the IL-76 took off to check an “inflight windmill” start.

“The engine was ignited [in] midair at windmill speeds and it was a success. We also had an ‘altitude relight’ to evaluate the engine’s restart capabilities. We had so far a total of three flights,” Mohan said.

DRDO plans to conduct nearly 60 test flights in the next couple of months to gauge engine reliability, safety and airworthiness.

“Now we will try out different Mach numbers and at different altitudes. The engine will come back to India after five months so that we can carry out further tests. We are aggressively conducting the flight-test campaign,” Mohan added.

Kaveri Engine Undergoes More Flight Trials In Russia | AVIATION WEEK
 
.
do we know how much power Kaveri is supposed to give? Can someone give that number:what:
 
.
does this improve RAFAELS chances to win MMRCA race dramtically.

OR IS F18 super hornets stil favourites

F-18 wont win the race. india is still suspicious towards US. eurofighter and rafale are front runners. rafale with its huge price tag may lag behind.
 
.
F-18 wont win the race. india is still suspicious towards US. eurofighter and rafale are front runners. rafale with its huge price tag may lag behind.

After this i doubt that.

OBAMA_INDIA_3.standalone.prod_affiliate.4.jpg


F/A 18 is the front runner as far as political decision is concerned. The only risk it faces is incase US Govt don't full fill the TOT requirements required in MMRCA.
 
.
two successful tests a big step...
i just hope the next two months will all be a success
 
. . . .
Repeat post edited. Too much booze! Thanks Kapoor! :)
 
Last edited:
. . .
Back
Top Bottom