What's new

ITS TIME TO KILL OFF THE TEJAS PROGRAMME lets Move on

really u guys are fighting like kids and btw india has cancelled kaveri project
link
OneIndia Exclusive: DRDO to abandon indigenous fighter jet engine Kaveri project - Oneindia

At least we tried and gained some experience.
  1. So far, 9 prototypes of Kaveri Engine and 4 prototypes of Kabani (Core) Engine have been developed.
  2. 2200 hours of test (ground and altitude conditions) has been conducted.
  3. The following two major milestones have been achieved:
    1. Successful completion of Official Altitude Testing (OAT) ; and
    2. Demonstration of First Block of flight of Kaveri Engine in Flying Test Bed (FTB).
 
.
At least we tried and gained some experience.
  1. So far, 9 prototypes of Kaveri Engine and 4 prototypes of Kabani (Core) Engine have been developed.
  2. 2200 hours of test (ground and altitude conditions) has been conducted.
  3. The following two major milestones have been achieved:
    1. Successful completion of Official Altitude Testing (OAT) ; and
    2. Demonstration of First Block of flight of Kaveri Engine in Flying Test Bed (FTB).

It's a moral victory. You only count moral victories if you ....
 
.
tejas has failed full stop move on

Tejas has not only failed but lawsuit should be filed against HAL, DRDO and other PSUs who waste public ax money and compromise national security with their incompetence.

The millions of dollars wasted on defence PSUs could have been better utilised in building infrastructure. It is the private sector who has to come to India's rescue ultimately.
 
.
At least we tried and gained some experience.
  1. So far, 9 prototypes of Kaveri Engine and 4 prototypes of Kabani (Core) Engine have been developed.
  2. 2200 hours of test (ground and altitude conditions) has been conducted.
  3. The following two major milestones have been achieved:
    1. Successful completion of Official Altitude Testing (OAT) ; and
    2. Demonstration of First Block of flight of Kaveri Engine in Flying Test Bed (FTB).
dont tell lies it has only 72 hour of test
rd 93 has life of 2000 hrs
 
. . .

Kaveri Engine is fail project and accept the reality which you guys always denies.

OneIndia Exclusive: DRDO to abandon indigenous fighter jet engine Kaveri project - Oneindia

But you guys can says that it was a good attempt.

LCA is already in sevice,with IAF's Tactics and Air Combat Development Establishment.But we are still waiting for Pakistani moped engine...:omghaha: :omghaha:

We will build it for you if you want and otherwise be happy with US one. After all your kaveri engine is failed one just like you are fail to justify your statement and troll all the time.
 
.
Even a failed engine I mean less powered engine have given what's it worth for..


Engine for UAV
Naval engines
Foreign engine makers will offer more than just selling..

Kaveri program got modified into newer ones, not dead end.
 
.
As per thread titttle...my reply


Please dont....please
 
.
Kaveri Engine is fail project and accept the reality which you guys always denies.

OneIndia Exclusive: DRDO to abandon indigenous fighter jet engine Kaveri project - Oneindia

But you guys can says that it was a good attempt.



We will build it for you if you want and otherwise be happy with US one. After all your kaveri engine is failed one just like you are fail to justify your statement and troll all the time.
What's wrong with failing..? who tries, fails, learns and moves on for better. Try building it yourself, before laughing at others failure.
Those who dare to fail miserably can achieve greatly. - John F. Kennedy
 
. .
I have just been reading update on Tejas which suggest that MK2 Tejas is not likely to fly until 2022/2023.

I have also read an article DRDO re refusing to upscale production of MK1 beyond 4-6 PLANES per year until IAF commit to a bigger order than 40 planes

Inaddition I have IAF will not commit to more MK1 planes.

Guys THIS PROJECT IS A JOKE and we NEED to kill this today.

CLOSE DOWN DRDO because we are wasting valuable resources. rupees.

1. WE NEED TO RETHINK INDIAN AMBITIONS OF BUILDING OUR OWN FIGHTERS

2. WE NEED A NEW PLAN TO REMODERNISE THE IAF with cheap lightweight fifth gen fighters.

3. WE NEED A STOP GAP FGHTER UNTIL POINT 2 ABOVE BECOME REALITY


PS its not all doom and gloom

We have a massive GDP OVER $2.2 TRILLION AND VERY LARGE FINANCIAL MUSCLE

We have options to use tech partnership from USA Sweden israel or Europe NOT just Russia

WE JUST NEED TO START AGAIN and be realistic...

tejas has failed full stop move on

My 2 cents. If you have never failed then it mean you never tried. Failure means you are brave enough to get out of the comfort zone and try something worthwhile.
India is too big of country/economy to not have an indigenous engine. US has $600 billion defect budget, that does not mean, they need that much money to protect its interests. That said, this spending is necessary to keep their brilliant engineering minds with interest in military technologies in US, otherwise, US is also not immune to brain drain. India is already suffering a lot from brain drain, just look at the CEOs of few fortune 500 companies to see the extent of brain drain. I don't know why there is not more focus on brain drain by the government. The ecosystem created by this project hopefully keep few bright minds in India and contribute towards overall development.
 
Last edited:
.
I have just been reading update on Tejas which suggest that MK2 Tejas is not likely to fly until 2022/2023.

I have also read an article DRDO re refusing to upscale production of MK1 beyond 4-6 PLANES per year until IAF commit to a bigger order than 40 planes

Inaddition I have IAF will not commit to more MK1 planes.

Guys THIS PROJECT IS A JOKE and we NEED to kill this today.

CLOSE DOWN DRDO because we are wasting valuable resources. rupees.

1. WE NEED TO RETHINK INDIAN AMBITIONS OF BUILDING OUR OWN FIGHTERS

2. WE NEED A NEW PLAN TO REMODERNISE THE IAF with cheap lightweight fifth gen fighters.

3. WE NEED A STOP GAP FGHTER UNTIL POINT 2 ABOVE BECOME REALITY


PS its not all doom and gloom

We have a massive GDP OVER $2.2 TRILLION AND VERY LARGE FINANCIAL MUSCLE

We have options to use tech partnership from USA Sweden israel or Europe NOT just Russia

WE JUST NEED TO START AGAIN and be realistic...

tejas has failed full stop move on

IA chef has said that Tejas will fulfill our requirement. That is enough.
 
.
Why this silly cartoon "Observe Safety" poster on left side?

Hawk_production_at_HAL.JPG


Great job! :rofl:
 
. .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom