What's new

Infrastructure Development in Pakistan

070120131134_zps9740277c.jpg


070120131135_zps975fe137.jpg


070120131136_zpsd5626e9e.jpg


Pedestrain underpass
070120131137_zpsbdaa358a.jpg


070120131138_zps103f1494.jpg
 
. .
thanks for the updates Bro....
if u ever come across pictures of the 4th tower (triangle) can i get some pictures on the progress of it ASAP ?!?!?!?!
Thanks :)
If you look at the site from google maps, the hotel tower site is a giant rain water swimming pool :lol: but i'm sure they took it out and finished piling.
 
.
I am sorry to say this but the Centaurus looks ugly with the blue glass - looks cheap and unrefined, another colour, maybe a black or green tint rather than blue reflective. Makes it look like a cheap plaza rather than a state of the art development.

In other news, all recent PK talls are ugly, where have all the decent architects gone? These developers need to develop good tastes and design something modern, elegant and different, rather than these chubby concrete eyesores.
 
. .
that's somewhere i wouldnt mind living....for Karachi, it looks like a good escape from the city's chaos and traffic
 
.
Big sexy trucks cleaning the roads of Lahore. They are not taken by me. I got them from facebook.

538060_454024051312804_997617136_n.jpg


3861_454024071312802_1280065899_n.jpg


398050_454023934646149_1510908895_n.jpg


430796_454023931312816_1101762011_n.jpg


226784_454023974646145_1273572624_n.jpg


734340_454023994646143_331612268_n.jpg


428980_454024007979475_711411712_n.jpg


582387_454024034646139_943361398_n.jpg
 
.
This is the head of Lahore waste management. His name is Kachra Seth. Ive met him in person. He is a very strict person. Nobody dares to smile if he isnt smiling. But on the positive note, Kachra seth is extremely bright and dominating person and he has completely transformed lahore when it comes to kachra

423656_450779554970587_1843678711_n.jpg
 
.
This is the head of Lahore waste management. His name is Kachra Seth. Ive met him in person. He is a very strict person. Nobody dares to smile if he isnt smiling. But on the positive note, Kachra seth is extremely bright and dominating person and he has completely transformed lahore when it comes to kachra

423656_450779554970587_1843678711_n.jpg
Wait a few minutes and try to post pics again.
 
.
If you look at the site from google maps, the hotel tower site is a giant rain water swimming pool :lol: but i'm sure they took it out and finished piling.

yeah ur rite thats what it looks like, a swimming pool :lol: but i want to see some cranes or trucks standing in there and :pakistan: building it :pakistan: or whatever may it be (even a dug up hole would do)
Man i love :smitten: The Centaurus :smitten: cant wait for it to be completed :pakistan:
 
.
I am sorry to say this but the Centaurus looks ugly with the blue glass - looks cheap and unrefined, another colour, maybe a black or green tint rather than blue reflective. Makes it look like a cheap plaza rather than a state of the art development.

In other news, all recent PK talls are ugly, where have all the decent architects gone? These developers need to develop good tastes and design something modern, elegant and different, rather than these chubby concrete eyesores.

no man green would look ugly and black would make it look sad......
:smitten: The Centaurus :smitten: is designed by world class architects and is a tested design in superior wind conditions etc... it is designed by Atkins a leading contributor to the Middle east
here it is : ::: ATKINS :::
and mind u they are architects who are paid a heavy amount due to their qualities, as they are not some single story home designers..... :undecided:
 
.
I am sorry to say this but the Centaurus looks ugly with the blue glass - looks cheap and unrefined, another colour, maybe a black or green tint rather than blue reflective. Makes it look like a cheap plaza rather than a state of the art development.

In other news, all recent PK talls are ugly, where have all the decent architects gone? These developers need to develop good tastes and design something modern, elegant and different, rather than these chubby concrete eyesores.


the company wasted billions of rupees they should have contacted you seriously :)
 
.
the metro bus dedicated track can be converted into metro train in future :azn:
 
. .
lol...........................

whats so funny to laugh :D

LAHORE, Jan 6: The Traffic Engineering and Transport Planning Agency (TEPA) is likely to accomplish the Rs30 billion worth of Metro Bus System (MBS) Project by Jan 20.

The agency, a subsidiary of the Lahore Development Authority, also plans to get the project inaugurated soon after its completion.

Sources told Dawn though LDA, TEPA and six contractors of good repute — National Logistic Cell (NLC), Makksons, Sarwar and Company and two joint ventures of SKB and Al-Bayrek and ZKB and Reliable — were scheduled to complete the project by Jan 31, Chief Minister Shahbaz Sharif pushed the officials to complete it by Jan 20.

They said keeping in view CM’s desire, the officials started executing various project activities on a fast track from last month.

At present, the sources said the entire 27-km dedicated bus pathway except three small portions, from Niazi Chowk to Shahdara measuring about 2-km, Kalma Chowk and Model Town underpasses, had been completed. Though the remaining stretch (from Niazi Chowk to Shahdara) and the dedicated overhead bridge for buses at Ravi River would be completed later, work on the aforementioned two small portions (Kalma Chowk and Model Town underpasses) would be completed by Jan 9.

They said keeping in view the current construction scenario, the MBS would be ready for bus operation by Jan 20.

They said the dedicated bus pathway had been designed in a way that it could be even used for running a train by laying rail track on it. “If we plan to lay rail track on this long corridor, this could carry its load and operations as well. However, the government only planned to ply buses at the moment,” an official said.

A senior TEPA official, when contacted, said of total 27, the officials had completed 100 per cent work on five bus stations at the moment. “The remaining 22 bus stations will be completed by Jan 15 as about 80 to 90 per cent of work relating to preparation of platforms, lighting, automated announcements, elevators (if required) ticketing and others had been completed there till date,” TEPA Chief Engineer Saeed Akhtar told Dawn.

He said although the officials were presently engaged in finishing various works, the completed tasks included the 8.6-km long overhead bridge, installation of fences along both sides of the track from Gajjumata to Niazi Chowk, installation of efficient transport system and automated announcements etc.

Asked about Model Town underpass, he said the TEPA officials would complete the project by Jan 9 and the CM would open it for traffic on Jan 10. Similarly the Kalma Chowk, which had been closed for traffic since Dec 20, would be opened on Jan 9 as per schedule.

“It was actually closed because of construction work on a small portion of the dedicated pathway, bus station and digging for Kalma Chowk underpass. And now we have completed the bus station and are about to complete the pathway whereas work on underpasses will continue till completion deadline (Jan 31).”

He said despite carrying out construction work on Kalma Chowk underpasses till Jan 30, the MBS would be ready for launching the bus operation in third week of this month, most probably by Jan 20 as desired by the CM.

To a question, the chief engineer admitted that there would be problem for running of the 18-meter long buses from Niazi Chowk to Shahdara due to absence of a dedicated track and an overhead bridge on the Ravi for them. “As we have yet to launch construction work on these assignments, we will be forced to ply the buses via existing Ravi bridge along routine traffic.”

Various departments concerned have almost completed feasibility studies for launching the MBS on Multan Road (from Thokar to MAO College) and Azadi Chowk to railway station besides connecting it with Ring Road.


Model Town underpass accessible on 10th MBS project may be complete by 20th | Newspaper | DAWN.COM
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom