ANMDT
ELITE MEMBER
- Joined
- Feb 9, 2014
- Messages
- 1,278
- Reaction score
- 10
- Country
- Location
I have no idea bro. The first 2 Gerpard corvettes was not so bad because it was cheap (~$150 mil), good training ships for the navy because we have never operated corvettes over 2000 tons before. But the order for next 4 Gepards is just silly imo. They supposedly cost the same or more than the Steregushchy but has way less firepower.
The Gepard is actually originally an OPV design, they just add some weapons to it and calls it a “frigate”. They are not a real multipurpose corvette like the Steregushchy with complete AAW, ASW and AShW package in one hull. The first 2 Gepards has no decent SAM system, and no Sonar, no hangar. The 3rd and 4th only add a sonar+torpedo launchers and the 5th and 6th I hope they just cancel it lol.
Basically, why the Gepard was ordered I have no idea. The latest 4 orders are just simply illogical imo.
Was there a tender for purchasing corvette? I need to ask this to give a further comment about the procedurement.
If there was no tender, and Vietnam government had to buy with negotiation , then it is like you have to buy whatever served , without considering your need. Sometimes its in the hands of supplier.
If there was a tender, maybe Viet navy preffered less armed systems to train personal at 1st,because more advanced systems require continous training,and each personal may have to be trained not only in a single manner.
@Indos, bro according the my quick research on military ship rules, these 6 ships received 5 times major repair and overhaul, plus one major modernization and overhaul in 2005 , from this aspect we can say, each of the ship costed 2 times of their value in repair /overhaul cost, also 0.5 times of their value for modernization in 2005 and integration .
From here,we can conclude that , each ship has costed 2 times of their value to keep in them in operations ,its an example of mismanagement , and lack of future projection on navy.
This is similar to what happened in my country about 10-15 years, navy havent prepared a future plan for fleet but spontaneously retired ships and replaced them. When there is no future plan, they have realized they only got to buy whatever offered (due to urgency to replace) ,without negotiating and bargaining