What's new

India's Mars Mission:- Some Amazing Pics

Brahmos_2

FULL MEMBER
Joined
Feb 19, 2013
Messages
1,412
Reaction score
0
Country
India
Location
India
PSLV-C25-17.jpg


This image shows Mars Orbiter Mission spacecraft being prepared for a prelaunch test at Satish Dhawan Space Center (SDSC), Shriharikota, India, 100 kilometers north of Chennai.

---------------------------------------------------------------------------------------------

PSLV-C25-18.jpg


Mars Orbiter Mission Spacecraft undergoing EMI/EMC testing at ISITE ISAC in Bangalore, India

---------------------------------------------------------------------------------------------

PSLV-C25-19.jpg


The Mars Orbiter Mission Spacecraft is being prepared for a vibration test at ISITE ISAC Bangalore, India.

---------------------------------------------------------------------------------------------

PSLV-C25-20.jpg


The Mars Orbiter Mission Spacecraft is undergoing an acoustic test

---------------------------------------------------------------------------------------------

PSLV-C25-21.jpg


Mars Orbiter Mission Spacecraft antenna undergoing a test at Comprehensive Antenna Test Facility.

---------------------------------------------------------------------------------------------

PSLV-C25-22.jpg


Mars Orbiter Mission Spacecraft as it is being loaded for a thermo vacuum test in the Large Space Simulation Chamber

---------------------------------------------------------------------------------------------

PSLV-C25-23.jpg


---------------------------------------------------------------------------------------------

PSLV-C25-24.jpg


---------------------------------------------------------------------------------------------

PSLV-C25-25.jpg


---------------------------------------------------------------------------------------------

PSLV-C25-28.jpg


Source:- India's First Mars Mission in Pictures (Gallery) | Space.com
 
. .
pslv-c25-1.jpg

PSLV-C25 after integration of all its four stages at Mobile Service Tower

PSLV-C25-2.jpg

PSLV-C25 in its third and fourth stages of being placed on top of the second stage at the Mobile Service Tower

PSLV-C25-3.jpg

Photo shows hoisting of the third and fourth stages of PSLV-C25 during vehicle integration

PSLV-C25-6.jpg

Hoisting of PSLV-C25 at its second stage in the Mobile Service Tower

PSLV-C25-9.jpg

one of the strap-ons of PSLV-C25 as it is being lowered to its position during vehicle integration

PSLV-C25-10.jpg


PSLV-C25-11.jpg


PSLV-C25-16.jpg


mom-infographic-1.jpg

Mars Orbiter Mission trajectory design
 
. . . . . . . . .
I'll give you guys a treat if this mission becomes successful.....:cheers:
 
. . . .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom