I will divide my post in two halves.
First half will be a bit about the roles and second half will be about timelines.
About the Roles
- What i understand is inspite of modern fighter jets having multirole capabilities, the doctrine of IAF still follows the path of assigning roles based on classification between light, medium and heavy and utilises the aircrafts best performance in that particular domain.
- In terms of aircrafts forming the categories, the below figure is the most authentic realisation as well as pin pointing to what IAF is planning
About the timelines
- Without a doubt the Medium Weight replacement envisioned for a 4.75 Gen Rafale is a 5th gen AMCA and 4.5 Gen MKI (super upgrade) is expected to be 5th gen FGFA
- The basic differential roles can be defined for the sake of understanding is
- View attachment 333186
- This basically defines what is expected in very brief
- French side does not differentiate so heavily like us and are happy taking on all the roles , same like Russia using Flankers for everything
I wrote about this in a separate thread. Let me paste it here for a quick point some quotes form the same
- FGFA - The stage 2 PAKFA should be available with 3 prototypes by 2023 with HAL. This with changes and with re-certification should make FGFA available for production by 2025-26 timeline.
- Now 5th Gen jets production wont be too high due to complexity involved in operations, maintenance and most importantly production angle as MIC has to reach a maturity level for that kind of work.
- AMCA basically is a further step ahead. The following pic is a very good illustration of what project AMCA is really
- View attachment 333187
- Thus here the word is matured LCA technologies (read 4/4.5th Gen)+ Insert the tech advantage from Make In India Medium category fighter + 5th gen tech flowing from FGFA.
- This practically will push AMCA beyond 2030 if we want a proper plane for Induction.
- IF you have a look at ADA paper on AMCA, the choice of technologies in the AMCA atm is unavailable for us and we are in process of developing some of it.
- But most of the technology which ADA matches with F35 and F22 cannot overnight be developed due to limited budget and resource allocation.
- On top, AMCA technology wont be available off the shelf unless the country is given a fighter jet program in India to enable some technology being localised and transferred.-
View attachment 333188
and
View attachment 333190
This is the link for the full post
https://defence.pk/threads/using-te...d-to-make-it-happe.421961/page-2#post-8155216
So i dont see an overlapping case scenario for Rafales and AMCA as both will be spaced at least 15-20 years apart and will be basically AMCA replacing Rafales.
++++
@Abingdonboy - I would request you to reply to opening post by MilSpec.
Again the same two issues
1. Roles - As you have clearly stated one platform can effectively serve an Airforce then wouldn't it serve IAF to adapt with modern times and bring in the efficiencies, cost savings, training benefits and synergy for having a single platform. We see every Airforce including US moving towards this. Why can't India have LCA and Rafales/AMCA/FGFA. Two platforms should be able to sufficiently cover all roles.
Or is their merit in having three/four platforms
2. Time-lines - OK even if we have 15 year gap b/w AMCA and Rafale instead of my overtly optimistic 5-10 years even then there is another 15 years when AMCA and Rafales will be flying together assuming full 30 years service life at least for both the platforms. This is a direct result of betting on four platforms LCA/AMCA/FGFA/RAFALES
@Abingdonboy @MilSpec @hellfire