What's new

India to roll out AEW aircraft by 2012

SpArK

ELITE MEMBER
Joined
May 5, 2010
Messages
22,519
Reaction score
18
Country
India
Location
India
India to roll out indigenous AEW aircraft by 2012

13140716774d2bec6bac6ec.jpg


BANGALORE (PTI): India’s indigenously developed Airborne Early Warning & Control System (AEW&CS) aircraft will be ready for roll out by January next year with its flight trials starting by this year-end, Defence Minister A K Antony has said.

Antony said this while handing over the Initial Operational Clearance certificate for light combat aircraft (LCA) Tejas to the Indian Air Force (IAF) here on Monday.

The Centre for Air-Borne Systems (CABS), DRDO, Bangalore, is developing the Airborne Early Warning and Control System which would be integrated into the Brazilian-manufactured Embraer-145 aircraft.

The system, designed to detect and distinguish hostile aircraft, would help in enhancing the surveillance and strike capability of the IAF. It can be used to direct fighters and strike aircraft to their targets and warn them of hostile enemy aircraft in the area from miles away.

The system would provide the IAF with the capability to track missiles and network with ground stations.

It comprises many sub-systems like radar and communication links that are being designed and developed by DRDO. This is a multi-laboratory programme of DRDO coordinated by CABS, Bangalore.

The EMB-145 aircraft is being modified to carry DRDO’s Active Array Antenna Unit (AAAU), mounted on top of the aircrafts fuselage, officials associated with the project said.

India and Brazil had inked a deal in 2008 under which Embraer will modify its EMB-145 to carry the AAAU on the aircraft’s fuselage.

India to roll out indigenous AEW aircraft by 2012 - Brahmand.com
 
.
cabs_aew_emb145.jpg


http://*****************/wp-content/...na-300x225.jpg

Embraer and the Indian Government have signed a deal for three EMB 145 AEW&C (Airborne Early Warning & Control) jets. The contract includes a comprehensive logistics package comprised of training, technical support, spare parts, and ground support equipment. The first delivery is scheduled for 2011. The three aircraft will be outfitted by the customer with cabin equipment and mission systems. Centre for Air Borne Systems (CABS), a unit of DRDO is the central agency for integration and delivery of the AEW&C.

Embraer-145 has been the aircraft of choice by the IAF as per their operational requirement (OR) since 2002 when it was evolved. There have been no changes over it. The platform was evolved with DRDO and IAF panel. IAF has chosen Embraer-145 due to commonality with the Embraer executive jets it already operates. These 3 AEW&C jets will join four Legacy jets in operation by the Indian Air Force (IAF) used to transport Indian VIPs, as well as foreign dignitaries. A fifth Legacy belongs to the Border Security Force (BSF), under India’s Home Ministry.
The aircraft is estimated to have an endurance of 5 hours from take off to landing. 5 hours total endurance means an operational endurance of 3 -3.5 hours of the AEW&C. 1-2 hours are reserved for taking off in and reaching the particular spot and then coming back. Initially the IAF wanted total endurance of 5-6 hours. In last 3 years, IAF has introduced new elements like IFR probe, communication support measures, SATCOM etc. A fuel to weight study found that the new systems will give an endurance of 5 hours. The introduction of the IFR will give the AEW&C an extended endurance of another 5 hours. Logically the IAF has asked for 7 extra executive chairs for additional 5 operators and 2 pilots. Hence there has been 3 years delay in the signing of Embraer platform.
The AEW&C designed to accomodate 5 re-configurable controller workstations. The work stations can be re-configured for electronic warfare consoles or communication consoles etc.
http://*****************/wp-content/uploads/2008/07/cabs-aewnc-antenna-300x225.jpg (http://*****************/wp-content/uploads/2008/07/cabs-aewnc-antenna.jpg)DRDO’s Active Array Antenna Unit (AAAU) or the Primary radar is designed to have a range of 200 kms for 2 sqm target as per the OR by the IAF. In international comparison table it translates to 5 sq meters target or RCS can be detected at a range of 300 kms in normal mode of operations and 375 kms for extended modes, i.e. while not looking 240 degree all the time. The secondary radar is designed to be of same range but for functions like identification Friend or Foe etc. The radars can function both in air mode and surface mode.
The primary AESA antenna will be built in CABS. The central processing unit and radar processing units are made by the LRDE. Secondary radar is entirely built in CABS and has a PESA Antenna. The secondary radar will be tested in 3 months by CABS.
The AEW&C is expected to have a 60 degree blind spot in both front and back. IAF can have 360 degree coverage with 3 antenna combination instead of 2 antennas side by side, but, that means pushing the deliveries further. It will be looked at a further date.
The first prototype is expected to be ready by 2012, i.e, one year from the date of receipt of the first aircraft. After that it will undergo a flight testing of 200-300 hours to become fully operational

The DRDO has released an overview of the AEW & C aircraft.

* The Radar will have an extended range mode against fighter aircraft, and will consist of two back to back AESA arrays, with an additional dedicated IFF array.
* The ESM system will be able to track sources with a directional accuracy of 2 deg. RMS and a frequency accuracy of 1 MHz.
* The ESM system will have complete 360 degree coverage in azimuth and have a database of up to 3000 emitters against which threats will be scanned.
* Communication Support Measure system will analyse and record intercepted communications both inflight and post flight.
* Self Protection Suite will have a passive Missile Approach Warning System, a Radar Warning Receiver and countermeasures dispensers. The SPS will be integrated with the ESM & CSM suite.
* The aircraft will have Inflight refuelling.
* The aircraft will have SATCOM, and datalinks to pass on ESM, CSM and radar data to ground stations and datalinks to pass on target information to fighters. More than 40 other aircraft will be datalinked together by the AEW & C aircraft.[5]

Work partners

The responsibility between various DRDO laboratories is split as follows:

1. LRDE and DEAL - Primary radar, and IFF
2. DEAL - Communication Systems and Data Link
3. DARE - Self Protection suite, EW & CSM
4. DLRL - Self Protection suite (counter measures)
5. CABS - Overall Program Management, Integration & development of the data handling system, displays, mission computers et al.

Various Indian private sector firms are also supporting the program.

NAL, India is assisting in aerodynamic studies of the antenna array, and flight modelling of the entire AEW&C platform.
 
. . . . .
He is right. But i will be happy if this second deadline does not cross.

Can you explain it little bit more? The article says that first flight scheduled by this year end and the AWACS will roll out in Jan next year. How it is late?

How much time they are taking to develop it?
 
.
230486924.jpg


Indian Active Array Antenna Unit for ingenous AEW&C Platform
 
.
I really look like same that SAAB's AWAC Pakisan have. Why they are on small plateform ? Do they have less capibility than Phalcons?
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom