What's new

India Developing, but still a long way to go

Love the look of the new public transportation across all Indian major cities... can't wait to go back to India... fully support JNNURM initiative... it is a great initiative to encourage development of urban infrastructure across India...
 
. .
Infosys Hydrabad Campus

0ac612d2f63bc862072f5610b26ac010.jpg


485484600f6dd2278b155fbb79b1afff.jpg


f15b13f3525854e5d45e44825b17c13f.jpg


87af7b0b8b0a8319df4ae5c4156560d3.jpg


f9939d5b31d4f877fa6f28e8e0c0f776.jpg


90c5045b42baea89a1eb03cd51233a10.jpg


More Pics of Infosys Hydrabad Campus
 
.
buddy you should see the infy-mysore campus . sorry i cant upload any pics but if possible try to upload them. i have been there and i can say that it is the best campus i have seen in india.
 
.
buddy you should see the infy-mysore campus . sorry i cant upload any pics but if possible try to upload them. i have been there and i can say that it is the best campus i have seen in india.

I have seen the pics of Infosys Mysore Global Education Center as well as development center. If I am not wrong the pictures of Infosys Mysore center are all ready posted in this thread.

FYI..
Hydrabad Development center is bigger than Bangalore development center of Infosys. Apart from these centers Infosys has a big development center in Pune where more than 15,000 employees are working.
 
.
Hyderabad International Convention Center

The Hyderabad International Convention Center with 4,000 seating capacity is India's largest and the most technologically advanced convention facility. It is an integrated 291,000 square foot (27,000 m²) facility with a 287-room-capacity business hotel, Novotel Hyderabad, covering 15 acres (61,000 m²). This air-conditioned center can be configured to increase seating capacity to about 6,500.

It was formally declared open by the Prime Minster, Manmohan Singh in2006.

54329dd36be51e9a446f124cb364b74e.jpg


ed8792b860fd87b810cfc816a02f2717.jpg




c3727788170af158d49946c0296ae52d.jpg


1090e3f70dc01a19a97a0b04fdc08a00.jpg


eb69993b37c481084f20a3d476fa68c8.jpg
 

Attachments

  • ed8792b860fd87b810cfc816a02f2717.jpg
    ed8792b860fd87b810cfc816a02f2717.jpg
    3.1 MB · Views: 18
  • 54329dd36be51e9a446f124cb364b74e.jpg
    54329dd36be51e9a446f124cb364b74e.jpg
    199.6 KB · Views: 16
.
Cyber GateWay - Hydrabad
Pics copyright - posaune.rm (flickr)

adb1933e185993a09763bc67c37e34fb.jpg


Dell - Hydrabad
Pics copyright - Manish Kumar (flickr)

5f53efbbc5181a7d3a570dba15d368c8.jpg
 
.
good to see India's progress, but you guys really should do something about the population control...the big baggage is only getting bigger
 
. . .
Nice buses... but its operated by KSRTC:lol:, that too at Trivandrum:woot: Wait for the next strike by 'Commies' in the state capital:P :rofl::rofl::rofl:

Lolz yupzz i was thinking same thing..Still remebers new model busses were introduced by Minister Ganesh Kumar and the same day there was a strike and those guys broke the front glass :lol:
 
.
Delhi Metro – IGI Airport Express line.

•Total length – 22.7 km (7km elevated + 15.7 km underground)
•For the first time DMRC is a using 25 meter long girder weighing 120 tons for this stretch. 504 girders will be used.
•These girders save 20% construction time and 10% cost compared to the normal 3 meter long girders.
•Maximum train speed 135 Km/h
•Estimated cost – 4000 Crores.
•Journey time from CP –IGI will be 18 minutes
•Expected ridership per day – 46,500 (2011) and 86,000 (2021)

d4c4bcd2fa6eaf939e5b6e206ba3bffa.jpg


1479f2b7c7a4d5feaa561e19243f071c.jpg




0c4e198d9831df86978ef01ee2cb7083.jpg
 
.
Lumbini Park Lazer Show, Hydrabad
Pic copyright :- KaushikMunshi

608dc56c7bfad18f52f8683e27af14e4.jpg


d2a30bd961cc26fccf1fd528d82e5c39.jpg


Hitech City- Hydrabad
pics copyright :- harsh1802

8c13f2999b290aeb1c3087b8a4f6a57b.jpg


39808a8764b1215d4975834c77226866.jpg
 
.
Nice pictures, it gives us a lot of info on what is happening around.
 
.
New Delhi Airport Terminal 3 will have 78 aerobridges, 90 travelators including longest in asia etc, will be the sixth biggest airport in the world in 4 to six months when ready .

additional terminals T4, T5 and T6 will be done as per plan before 2026.

Delhi Airport development plan:

639950b7cb0c6e3939b296b0a2f8dcd8.png



Making indias bigest airport:

http://img42.imageshack.us/img42/4006/76296917.jpg
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom