What's new

IAF issues tender to HAL for 83 LCA Tejas Mk1A fighters.

. . .
Specification of Tejas MK1-A :

1.Uttam AESA Radar co-developed with Israel's ELTA corp.


2.Aircraft's weight reduced by 1000 kg from its initial weight of 6500 kg.


3.In-flight refueling capability.

4.Integrated electro-optic Electronic Warfare (EW) sensor.

5.Integration of BVR's like Astra and Derby (I,II).
 
.
Specification of Tejas MK1-A :

1.Uttam AESA Radar co-developed with Israel's ELTA corp.


2.Aircraft's weight reduced by 1000 kg from its initial weight of 6500 kg.


3.In-flight refueling capability.

4.Integrated electro-optic Electronic Warfare (EW) sensor.

5.Integration of BVR's like Astra and Derby (I,II).
What is the price per unit after these 5 specs update?
 
.
Specification of Tejas MK1-A :

1.Uttam AESA Radar co-developed with Israel's ELTA corp.


2.Aircraft's weight reduced by 1000 kg from its initial weight of 6500 kg.


3.In-flight refueling capability.

4.Integrated electro-optic Electronic Warfare (EW) sensor.

5.Integration of BVR's like Astra and Derby (I,II).
Uttam still not available.
 
.
Specification of Tejas MK1-A :

1.Uttam AESA Radar co-developed with Israel's ELTA corp.


2.Aircraft's weight reduced by 1000 kg from its initial weight of 6500 kg.


3.In-flight refueling capability.

4.Integrated electro-optic Electronic Warfare (EW) sensor.

5.Integration of BVR's like Astra and Derby (I,II).

What is the load capacity now?

can you also provide any info on flight time, has it increase from 54 mins.
 
. . .
Specification of Tejas MK1-A :

1.Uttam AESA Radar co-developed with Israel's ELTA corp.


2.Aircraft's weight reduced by 1000 kg from its initial weight of 6500 kg.


3.In-flight refueling capability.

4.Integrated electro-optic Electronic Warfare (EW) sensor.

5.Integration of BVR's like Astra and Derby (I,II).


Uttam isn't codeveloped. It'll get an aesa but from abroad.


Anyway, this order is nothing new. It was in the pipeline. And it's HALs project not ada-drdo.
 
.
Specification of Tejas MK1-A :

1.Uttam AESA Radar co-developed with Israel's ELTA corp.


2.Aircraft's weight reduced by 1000 kg from its initial weight of 6500 kg.


3.In-flight refueling capability.

4.Integrated electro-optic Electronic Warfare (EW) sensor.

5.Integration of BVR's like Astra and Derby (I,II).
Nice to see that indigenous has changed it's meaning.

Finally. Good foe India.
About time
PAF is ecstatic
 
.
Speculating that the empty weight will be 5.8T and if the uprated Kaveri becomes available the TWR should be above 1.1 at loaded weight or above 1 with the F404.

The fuel fraction will be much higher than the F-16 B50.

What is the load capacity now?

can you also provide any info on flight time, has it increase from 54 mins.

The load capacity should be 5T+ once its ready.

The ferry range is a little over 2500Km. That's 3 hours of flight time.

Specification of Tejas MK1-A :

1.Uttam AESA Radar co-developed with Israel's ELTA corp.

Uttam wasn't co-developed.
 
.
What about the engine IAF purchase 20(IOC)+20(FOC)+83(MKA) Which mean all come with GE-F404.
What about 99 F414 engine which India already order in 2010.

it mean the total order: 123+99
 
.
tender means money will come from IAF kitty so its a done deal now, congrats to HAL, now IAF should keep a big stick with them to keep HAL babus on a tight rope for delivery of planes.
 
.
.
Back
Top Bottom