What's new

Hydro power plants updates

These big dams are great but the actual progress and freedom will be installing micro hydel power which Pakistan has the potential to exploit within the existing infrastructure like the canal system for energy needs and above all it can make Pakistan independent from the grid system for rural areas!

these startups from Chile have done it by creating a small micro hydel power plant that has Pakistan written all over it. The canal system of Pakistan should be generating electricity in summer as the demand is highest in summer along with the monsoon season.


This small hydel power plant is capable of 15kW of electricity and multiply this system across the country and you can have more power generation at small level that is not stressing the environment.



this is a great example of it working in Indonesian Jungle


https://www.turbulent.be/
Actually this is not new, northern area and Kashmir have been using these technique to grind wheat grains for decades. They created a canal by Simply using rocks from the river bed to turn the grinding stone.
But these small hydro project is for regional area govt or local official to build and Monitor. I doubt federal government can bill and look after and these small projects.
 
.
Actually this is not new, northern area and Kashmir have been using these technique to grind wheat grains for decades. They created a canal by Simply using rocks from the river bed to turn the grinding stone.
But these small hydro project is for regional area govt or local official to build and Monitor. I doubt federal government can bill and look after and these small projects.
potential for generating electricity through this method needs to be exploited. you can only build so many big dams but this is literally, sone pe suhaga. our engineering startups in Pakistan can maybe work on this and help the nation out.
 
.
Gulpur Hydropower Project.,

100 Ton Kato Hydraullic Crane working at 102 MW Gulpur Hydro Power Project AK.


93863586_120820629573763_9182877259826987008_n.jpg


93475502_120820786240414_8039304417259814912_n.jpg





Updates, reinstalled


94385987_2889016621194329_7419917008726130688_n.jpg


93414245_120820772907082_5364029967879372800_n.jpg
 
. .
These big dams are great but the actual progress and freedom will be installing micro hydel power which Pakistan has the potential to exploit within the existing infrastructure like the canal system for energy needs and above all it can make Pakistan independent from the grid system for rural areas!

these startups from Chile have done it by creating a small micro hydel power plant that has Pakistan written all over it. The canal system of Pakistan should be generating electricity in summer as the demand is highest in summer along with the monsoon season.


This small hydel power plant is capable of 15kW of electricity and multiply this system across the country and you can have more power generation at small level that is not stressing the environment.



this is a great example of it working in Indonesian Jungle


https://www.turbulent.be/



Pakistan has Hundreds of Micro-Hydel which is providing electricity to thousands of people. They are dotted around KPK, AJ&K and GB. Micro-Hydel in Pakistan is a success story and probably has one of the largest numbers of Micro-Hydel in the world.
You seem to be very ill informed regarding your own country.
 
.
Pakistan has Hundreds of Micro-Hydel which is providing electricity to thousands of people. They are dotted around KPK, AJ&K and GB. Micro-Hydel in Pakistan is a success story and probably has one of the largest numbers of Micro-Hydel in the world.
You seem to be very ill informed regarding your own country.
We also need reservoirs. A lot of fresh water is wasted every year and don't forget the disastrous floods.
 
. .
33447.jpg


give me maafi for being jahil.

I dont want 10% mafi:D.


Also something good about Micro-Hydel is that large parts of the machinery is sourced locally except for the Dynamo's. The bad part is that many companies including HIT proposed to manufacture Turbines and Dynamos locally, unfortunately None of the successive governments ever took notice.

We also need reservoirs. A lot of fresh water is wasted every year and don't forget the disastrous floods.

Micro-Hydels don't store water they either have a small storage tank or run depending on the flow of its Water source.
Dasu and Diamer dam will greatly help in the Flood problems, unfortunately we cannot control the flow from rivers coming form Indian side.
 
.
Earth works are in progress at Mohmand Dam Hydropower project.

Mohmand Dam will store about 1.2 million acre feet (MAF) of water, generate 800 megawatt (MW) of low-cost hydel electricity and help mitigate floods in Peshawar, Charsadda and Naushera.

Besides supplementing 160,000 acres of existing land, about 16,700 acres of new land will also be irrigated because of Mohmand Dam. In addition, 300 million gallons water per day will also be provided to Peshawar for drinking purpose. Annual benefits of the project have been estimated at Rs 51.6 billion.



94393152_2686468131480868_8856107841480556544_n.jpg





94232873_2686468201480861_4404619099557068800_n.jpg





94229329_2686468248147523_6192658781390766080_n.jpg





94429929_2686468321480849_6827749938978357248_n.jpg
 
.
Bidding extended for 300 MW Balakot_Hydropower_Project

Pakhtunkhwa Energy Development Organization (PEDO) has extended the deadline for bidding for the construction and completion of the design, supply and installation, testing and commissioning of the 300 MW Balakot run-of-river hydropower plant on the river Kunhar in the Khyber Pakhtunkhwa (KPK) province of Pakistan including the related civil works for river diversion.

The project, which is to be co-financed by the Asian Development Bank and developed by PEDO, will include construction of a 58 m-high gravity concrete dam and related appurtenant structures; river diversion works and sediment by-pass tunnel; power circuit, including power intake, concrete lined headrace tunnel, upstream surge shaft, steel lined pressure shaft and Penstocks, downstream surge shaft, and concrete-lined tailrace tunnel; cavern type powerhouse for three Francis turbines with 300 MW installed capacity, including access tunnels and exterior switch yard; transmission and interconnection of a 500 kV line and a 132 kV line; access roads to the hydropower scheme; and, a permanent colony for the operational staff. Construction works are expected to take 75 months.

Open competitive bidding will be conducted in accordance with ADB’s single-stage, two-envelope bidding procedure and is open to all eligible bidders as described in the bidding document. The full revised tender notice can be viewed on the website of the ADB.

To purchase the bidding documents, eligible bidders should submit a written request to the below-mentioned address with confirmation of the payment of a non-refundable fee of Rs. 10 000 (10 000 Rupees only) in the name of “GM (Hydel), PEDO” through a cross cheque/pay order.

The bid should be submitted to the PEDO office address with a bid security as described in the bidding document on or before 15 June 2020 at 14:00 hours (Pakistan Standard Time); electronic submission of bids is not allowed.

94525718_2583561785245673_5272053483753701376_n.jpg





94436793_2583561868578998_3983476974700986368_n.jpg
 
.
WITH SOLAR DROPPING TO JAW BREAKING LOW LEVELS..THE ISSUES ARE NOW NIGHT TIME ..

solar power cost has dropped from 10 cents in 2012 to 5 cents now
if Pakistan just focus on solar and hydro it can offset this problem by using hydro at night/off sun shine peak time and solar during peak times
Govt should provide loans for solar for domestic use.a normal house have 600 watt usage at max.which covers fans lights,tv,fridge...for water pump we can use wapda.we should focus on solar energy
 
.
Pakistan has Hundreds of Micro-Hydel which is providing electricity to thousands of people. They are dotted around KPK, AJ&K and GB. Micro-Hydel in Pakistan is a success story and probably has one of the largest numbers of Micro-Hydel in the world.
You seem to be very ill informed regarding your own country.
actual these are low overhead turbines/new tech..that we have incredible potential on canals but isnt exploted at all..
 
. .
The Suki kinari Hydropower Project...

94573878_2690791204381894_5434554396031582208_o.jpg




The Suki kinari Hydropower Project is located on the Kunhar River in the beautiful valley of Kaghan, KP.

As a key project in the list of the first batch of priority projects of the "China-Pakistan Economic Corridor", China Energy Construction Gezhouba Group's overseas greenfield investment "first order", the project shoulders the major mission of Gezhouba Group's transformation and upgrading and structural adjustment.

The SK Hydropower Station is equipped with four Pelton turbine generators with a single unit capacity of 221 MW, with a total installed capacity of 884 MW, a maximum net head of 922.72 meters, and an average annual power generation of 3.212 billion kWh for many years.


94506292_2690791464381868_8560832774070599680_o.jpg





94448137_2690791311048550_560538471018528768_o.jpg





94888399_2690791564381858_4644242987222564864_o.jpg
 
. .

Pakistan Affairs Latest Posts

Country Latest Posts

Back
Top Bottom