What's new

Home-made submarines cheaper than those built with foreign technology

ashok321

ELITE MEMBER
Joined
Nov 1, 2010
Messages
17,942
Reaction score
4
Country
Canada
Location
Malaysia

.jpg



New Delhi: India is grappling with a leak of sensitive data on its Scorpene submarines from the French company but an internal assessment has found that it could be cheaper to construct an indigenous set of nuclear-powered attack submarines rather than relying on a foreign vendor for technology.

India is currently building six Scorpene submarines under a licence agreement from France, a deal which was inked for . Rs 18,000 crore in 2005. The Rs 3,000 crore a submarine tag would go up further if escalation and inflation is calculated for the ten year build period.

However, ET has been told that an internal assessment has brought out that the cost of constructing six new nuclear-powered attack submarines, derived from the design and expertise gained from the INS Arihant — India's first nuclear boat — would be close to .`35,000 crore.

The set of indigenous nuclear attack boats would not be as stealthy as a conventional, diesel electric submarine but would have much greater endurance and weapon carrying capability.

"According to our calculations, if we are to build six attack submarines based on the existing design of the Arihant, the cost would not exceed Rs 35,000 crore," a source involved in the process told ET. Contrast this to an upcoming tender the Navy will float for six more conventional submarines which is expected to cost over Rs 60,000 crore, called Project 75 I.

French company DCNS, from which the leak has occurred, is one of the companies contesting for this order. The huge difference in pricing, officials told ET, is due to the licence fees charged in the case of the Scorpene and the cost of technology development that would be factored into project 75I from the vendor.

"In the case of the indigenous nuclear attack submarines, the design is already with us. It has been designed in India and the only cost would be the construction and fitment of weapons," the source said.

The Navy has a submarine design bureau that has' gained considerable expertise due to the Arihant project. As reported by ET, INS Arihant, which is a nuclear powered submarine armed with nuclear weapons, has successfully undergone trials and is ready for deployment.
 
The best idea will be to get 6 off the shelf U-214 submarines for around 2.5 billion, considering $400 million per piece. And use the dock to construct our future SSNs.

We do not stand to get any path breaking technology in P-75i project.
 
The best idea will be to get 6 off the shelf U-214 submarines for around 2.5 billion, considering $400 million per piece. And use the dock to construct our future SSNs.

We do not stand to get any path breaking technology in P-75i project.

A design which lost 10 years ago won't make the cut. TKMS does not stand a chance to win with Type 214.
 
The best idea will be to get 6 off the shelf U-214 submarines for around 2.5 billion, considering $400 million per piece. And use the dock to construct our future SSNs.

We do not stand to get any path breaking technology in P-75i project.
2 off and 4 built in India
 
2 off and 4 built in India

What you stand to gain by making it in India?

A design which lost 10 years ago won't make the cut. TKMS does not stand a chance to win with Type 214.

The design was lost because their level of ToT was lesser compared to Scorpene, and the factor of Germany sanctioning us after Pokhran 2 was still fresh.
 

And this article proofs what
There not even the seasons defense journalists?

What is authenticity of blog ?

Tomorrow if any authors write the blog that is US helps in design China's J-20 so you will buy it

Even though he clearly mentioned that India take consultancy from Russian but where did it say that it was made like Sukhoi-30

Boeing take consultancy from bae on many projects so that that all Boeing products are BAE originated

Welcome to global world
 
Last edited:
Best way is design your self and hire consultency as and when required.
 
Back
Top Bottom