What's new

HAL to build 8, then 12, Tejas fighters each year

NKVD

BANNED
Joined
Dec 26, 2013
Messages
5,157
Reaction score
-18
Country
India
Location
Russian Federation
The ministry of defence has sanctioned Rs 1,556 cr for HAL's high-tech production line that aims to build 12 Tejas fighters each year

On December 20, the Tejas light combat aircraft (LCA) was cleared to enter operational service with the Indian Air Force(IAF). Now Hindustan Aeronautics Ltd (HAL) faces the daunting transition from handcrafting Tejas prototypes into factory-assembling the 200-fighter Tejas fleet that DefenceMinister A K Antony has envisioned.

The ministry of defence (MoD) has sanctioned Rs 1,556 crore for HAL's high-tech production line that aims to build 12 Tejas fighters each year. The funds will come from the IAF (25 per cent); the navy (25 per cent), while HAL will put up half the money.

Business Standard visited the new Tejas production line, an expansive 28,000-square metre facility in four massive hangars in HAL, Bangalore. Work is already underway on the first IAF order of 20 Tejas Mark I fighters, with an order for 20 more in the pipeline once the aircraft gets "final operational clearance" next year. The first two fighters being "series produced" - they are numbered SP-1 and SP-2 - are visibly taking shape.

"By end-March 2014, SP-1 will fly, and SP-2 will fly a few months later. By the end of next year four Tejas will be in production. In 2015-16, we will build six fighters, and in 2016-17, we will build nine. We are targeting an annual capacity of 12 Tejas fighters," says V Sridharan, the project manager hand-chosen to build the LCA. Earlier, he set up HAL's production line for the Hawk trainer.

Over the years, excellent designs like the Arjun tank have failed the transition from design into product. This is because India's archaic defence production policies make the Defence R&D Organisation (DRDO) responsible for designing equipment, with production responsibility then passing onto a network of eight defence public sector undertakings (DPSUs) and 39 ordnance factories (OFs) with long reputations for sloppy production. Having played little role in design, the manufacturing agencies struggle to produce the system.

The Tejas could be a game-changer. Firstly, HAL has played a major role both in designing the Tejas and in building prototypes for the flight-test programme. Secondly, HAL has brought a radically new approach to Tejas production, adopting global aerospace manufacturing standards and an unprecedented approach to quality control.

Walking around the Tejas assembly line, Sridharan explains that the sixteen Tejas prototypes HAL has built are each different from the other. As the Aeronautical Development Agency (ADA) incrementally refined and improved the fighter, each new prototype incorporated improvements and additions. The most recent prototype has a pressure refuelling system that lets the Tejas be topped up Formula One style, in just 8 minutes and then flown back into combat.

"As a result of all these changes, a panel from one Tejas would not fit another. Now we will implement absolute standardisation, with identical components, assemblies and panels," explains Sridharan.

This is being done with laser scanners that ensure that a number of key points (called "locators") on each aircraft being built is exactly where it should be. By measuring with the laser, it is ensured that the locator is within 80 microns, i.e. about one-tenth of a millimetre, of where it should be. These are international standards, used by companies like Boeing.

It is evident from the focus of the laser trackers teams that it is painstaking work. This standardisation, and coordinating the flow of Tejas systems and sub-systems to the assembly line constitutes what Sridharan describes as the process of "stabilising" the Tejas line.

"Once the process is stabilised, we can transition to higher rates of production. My initial focus will be on production quality; then we will scale up production. HAL will meet the target of building 20 fighters by 2016-17," he says.

That was the pattern while building the Hawk. After building just two aircraft in the first year, seven were built in the second year. In the third year, HAL built 18 Hawks, and the remaining 14 Hawks were produced within months.

Within ADA and in HAL, there is expectation that better production could improve aircraft performance. "Better build quality could well improve the Tejas' aerodynamic performance, reducing drag, and improving its speed, rate of climb and turn rate," says a designer.

HAL's chairman, RK Tyagi, explains that the international best practices being introduced in the Tejas assembly line will be replicated across all the aerospace giant's production lines, including the Sukhoi-30MKI line in Nashik and the Hawk trainer line in Bangalore.

"We have earmarked Rs 3,500 crore of HAL funds for making our production lines world class. Our focus is to gain the IAF's confidence. We will do what is necessary for that," says Tyagi.

HAL to build 8, then 12, Tejas fighters each year | Business Standard

 
Last edited by a moderator:
What does "Tejas" mean? I get a giggle every time I read it because in Spanish it means "Texas". Is your fighter named after the Great Lone Star State?
 
"By end-March 2014, SP-1 will fly, and SP-2 will fly a few months later. By the end of next year four Tejas will be in production. In 2015-16, we will build six fighters, and in 2016-17, we will build nine. We are targeting an annual capacity of 12 Tejas fighters," says V Sridharan, the project manager hand-chosen to build the LCA. Earlier, he set up HAL's production line for the Hawk trainer.

This is an extremely slow production rate.

4 in 2014
6 in 2015-16
9 in 2016-17


If we consider it till 2017 end than a total of 19 Tejas wil be manufactured in 4 years from Now.

I believe shortage of funds is also not the issue as in JF-17 case than why the production rate projected is so slow?
 
to pump up the production to say, 30-40 planes per year .. what limits the rate ?? manpower ? money? short supply of raw materials??
Mate your Questions already answer in the thread its self "Once the process is stabilised, we can transition to higher rates of production. My initial focus will be on production quality; then we will scale up production":-) Read this Part


This is an extremely slow production rate.

4 in 2014
6 in 2015-16
9 in 2016-17


If we consider it till 2017 end than a total of 19 Tejas wil be manufactured in 4 years from Now.

I believe shortage of funds is also not the issue as in JF-17 case than why the production rate projected is so slow?
"Once the process is stabilised, we can transition to higher rates of production. My initial focus will be on production quality; then we will scale up production":-) Please Read this Part
 
This is an extremely slow production rate.

4 in 2014
6 in 2015-16
9 in 2016-17


If we consider it till 2017 end than a total of 19 Tejas wil be manufactured in 4 years from Now.

I believe shortage of funds is also not the issue as in JF-17 case than why the production rate projected is so slow?
Mate your Questions already answer in the thread its self "Once the process is stabilised, we can transition to higher rates of production. My initial focus will be on production quality; then we will scale up production":-)

If IAF places order of 200 units and they want these to be delivered in next 4~5 yrs. This can be done.

It's simple economics (demand vs supply). There is a very small order for IAF and it does not make any sense to put too much money in additional assy tools/ jigs and line setup.
 
This is an extremely slow production rate.

4 in 2014
6 in 2015-16
9 in 2016-17


If we consider it till 2017 end than a total of 19 Tejas wil be manufactured in 4 years from Now.

I believe shortage of funds is also not the issue as in JF-17 case than why the production rate projected is so slow?

Not 19, but 25 (4+6+6+9)

Mainly because unlike JF 17, this is not the only plane HAL is manufacturing on an ongoing basis.. There is Su 30 MKI (about 12-15 every year) and hopefully by end 2014, HAL would have started the pre production activities around Rafale too..
 
Mate your Questions already answer in the thread its self "Once the process is stabilised, we can transition to higher rates of production. My initial focus will be on production quality; then we will scale up production":-) Read this Part



"Once the process is stabilised, we can transition to higher rates of production. My initial focus will be on production quality; then we will scale up production":-) Please Read this Part

ooops i missed this part though it also mean that the produced will be scaled up atleast after 2017.

I know Indian output capacity is huge and i am sure they can even produce upto 25 Tejas per year
 
What does "Tejas" mean? I get a giggle every time I read it because in Spanish it means "Texas". Is your fighter named after the Great Lone Star State?

Tejas is Sanskrit word means 'Radiance' give by our then PM Atal Bihari Vajpayi.

This is an extremely slow production rate.

4 in 2014
6 in 2015-16
9 in 2016-17


If we consider it till 2017 end than a total of 19 Tejas wil be manufactured in 4 years from Now.

I believe shortage of funds is also not the issue as in JF-17 case than why the production rate projected is so slow?

IAF only ordered 20 Tejas in IOC standard & 20 in FOC & Navy orders 8 N-LCA in MKI standards, LCA MKII Production starts in 2018.
So, the gap of 4 years.
What would HAL do if they produced 48 aircraft in 3 years?
 
Last edited:
Well Production will be gradually increased
Its similar to what has happened with the Su30MKI
Only 4 were delivered in yr 2004, and production has been gradually ramped up to 30 per year since 2011

Same is the case with Tejas
I believe , it will take 5 yrs to deliver 40 Mark I aircraft, while 83 LCA Mark II and 40 LCA N might take just another 5-6 yrs
 
Tejas is plural of Teja which is inspired from Indian movies.

Teja (film director) - Wikipedia, the free encyclopedia
:rofl::rofl:
images
 
Well Production will be gradually increased
Its similar to what has happened with the Su30MKI
Only 4 were delivered in yr 2004, and production has been gradually ramped up to 30 per year since 2011

Same is the case with Tejas
I believe , it will take 5 yrs to deliver 40 Mark I aircraft, while 83 LCA Mark II and 40 LCA N might take just another 5-6 yrs

Source for this news.
Current production rate of Su-30 MKI is 15-16 per year which IAF wants 18 per year.
 
Back
Top Bottom