sudhir007
SENIOR MEMBER
- Joined
- Jul 6, 2009
- Messages
- 4,728
- Reaction score
- 1
Tejas squads include 20 fighters each, that's why the first ordered 2 x MK1 squads include 40 x fighters.
Yes, disappointing but achievable, maybe some more might be added with Kaveri K10 after that too, because by 2022 the engine is planned to replace GE 404 IN of the MK1s.
Hi sancho
can you tell me is kaveri is worth-full for lca coze IAF already want higher thrust engine like ge-414 which have around 98kn thrust and the detail which come sometime that k-9 (co-develop by India and France) has 90kn thrust which is low then ge-414. did IAF accept this engine for future replacement (MK-3) which is lower then (Mk-2).
for my point of view is only fulfill the requirement of AMCA but not LCA