Hassan Guy
SENIOR MEMBER
- Joined
- Aug 23, 2016
- Messages
- 4,892
- Reaction score
- -3
- Country
- Location
I love midgets
the submarines I mean
the submarines I mean
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Fateh weighs 600 tons...I love midgets
the submarines I mean
The displacement is around 600 tons the weight probably is something else.Fateh weighs 600 tons...
Great pics,and better late than never.Tho frankly I did have my doubts.View attachment 539932 View attachment 539933 View attachment 539934 View attachment 539935 View attachment 539936 View attachment 539937 View attachment 539939 View attachment 539940 View attachment 539941 View attachment 539942 View attachment 539943 View attachment 539944 View attachment 539945 View attachment 539946 View attachment 539947 View attachment 539948 View attachment 539949
It take Iran 10 years to built her own submarine from a to z ....Great pics,and better late than never.Tho frankly I did have my doubts.
It takes 4 years for company like Ford or Mercedes to build a commercial car from concept to mass production. I'd say it is a very good time for building a submarine class that has never been built in Iran beforeIt take Iran 10 years to built her own submarine from a to z ....
It takes 4 years for company like Ford or Mercedes to build a commercial car from concept to mass production. I'd say it is a very good time for building a submarine class that has never been built in Iran before
4 year is for Design Developments which is the most time consuming part. When it is designed manufacturing can happen way faster. 2 every 4 years shouldn't be an issue.All depends on next line. If it takes 4 years to build a Fateh then it would take 40 years to build 10 Fateh.
Thus Iran needs to strive for at least 2 every 4 years, thus it will hit 10 Fateh in 20 years.
Not necessarily,the boat first went into the water back in 2015,so the last 4 odd years were spent shaking it down and perfecting the design not only of the boat and its assorted systems,but very likely improving the quality of its quietening and sound reduction systems,as a lot of that can really only be done with the boat completed and in the water.I would think that with all of the likely lessons learned that any newly constructed boats could shave a lot of time off of that 4 year shake down period in future.All depends on next line. If it takes 4 years to build a Fateh then it would take 40 years to build 10 Fateh.
Thus Iran needs to strive for at least 2 every 4 years, thus it will hit 10 Fateh in 20 years.
All depends on next line. If it takes 4 years to build a Fateh then it would take 40 years to build 10 Fateh.
Thus Iran needs to strive for at least 2 every 4 years, thus it will hit 10 Fateh in 20 years.