Thank you for the thread, and no disrespect but how are these buildings connected to "economic development"? I know they are buildings of state corporations, but it can be explained by the fact that it's probably a good execuse to spend (and steal) some of oil money on decorating the city.

creation of jobs
 
How so? How many people works on it? And the work on them is not permanent but temporarily.

I can understand SOCAR (which has emerged as a big and important oil company) but I'm not sure if those other corporations need these buildings to be honest
 
Last edited:
How so? How many people works on it? And the work on them is not permanent but temporarily.

I can understand SOCAR (which has emerged as a big and important oil company) but I'm not sure if those other corporations need these buildings to be honest

I am not talking about construction jobs , I am talking about permanent jobs in the towers
 
Well said ASQ. I'm more interested in facts like how non-Gas economy is going etc.
 
I am not talking about construction jobs , I am talking about permanent jobs in the towers
how many of these towers are residental, how many of them are office?
Well said ASQ. I'm more interested in facts like how non-Gas economy is going etc.
Those towers can still drive an economy... they may be used by IT companies for example... imagine a tower full of software developers :) it's technically production even though there isn't a physical product
 
High tech park in Pirallahi

146a1eba7a7da85a06debc3400b7127e.jpg


ee9967ae7d5541917f279f8824381ac6.jpg



Azerbaijan negotiating with China to transport cargo destined to Europe through the new Baku-Tbilisi-Kars railway
connecting Europe to Asia

ojbqy8p.png
 
High tech park in Pirallahi

146a1eba7a7da85a06debc3400b7127e.jpg


ee9967ae7d5541917f279f8824381ac6.jpg



Azerbaijan negotiating with China to transport cargo destined to Europe through the new Baku-Tbilisi-Kars railway
connecting Europe to Asia

ojbqy8p.png

This new cargo plan would be a new Silk Road, and it can give us a lot of money for transit. :tup:
 
plant for the production of steel pipes of the “Azertechnoline” Limited Liability Company

The diameter of the pipes to be produced at the plant will range from 400 to 2,000 mm, thickness from 6 to 25 mm and length from 6 to 16 meters according to the needs. The plant has two lines for the production of spiral pipes. They are expected to produce 75,000 tons of steel pipes of different diameters, 60,000 tons of hydro-technical equipment of various diameters resistant to high pressure and 12,000 tons of polyethylene pipes of different diameters every year. The enterprise covering an area of 27,000 square meters operates modern equipment manufactured in America, Germany and Turkey. The plant's products will enable high-level transportation of Azerbaijani natural gas and water.

512ef7aa15c6.jpg


cb60daa8f5a5.jpg


4510293fd22f.jpg
.

NORM cement factory in Garadagh

annual production of 2mil tons of cement

8d4490faaf66.jpg


Zəyəm Technology Park

1ada2979fd82.jpg


b65093ed7365.jpg


237d57b050e8.jpg
 
Last edited:
Baku Shipyard
first contract from Russia for 10 crew boats 2nd contract from BP for $450mil
3rd contract for construction of a rig for $750mil

It was indicated that the enterprise covers an area of 620,000 square meters. A quayside 1,630 meters in length, a five-storey office building, a training center, various offices and warehouses, workshops, a repair yard, a canteen, a first-aid station, a compressor building and a substation to ensure reliable power supply of the plant have been built on the premises.

It was mentioned that the production capacity of the plant is 25,000 tons of steel structures a year. Theenterprise, unique for the Caspian Sea basin, is capable of producing four 15,000-ton tankers, two 70,000-tontankersand four supply vessels each year. It can alsoconduct repairs of 80-100 vessels of different profiles. In parallel with the construction of the plant, the longest floating dry dockin the Caspian Sea, which is highly important for the operation of the plant, has been built as well. As part of the second phase of the construction project there areplans to build a new dry dock, an additional production workshop and a bridge area.


b5dd155db8df.jpg


bb30c58ca51e.jpg


f17a245ecdf4.jpg


59341e6bc02c.jpg


63f805e34108.jpg


7c90cabe5ada.jpg


development in the last decade

28152_10152704236125315_2098675720_n.jpg


Gilan Seramik Park

creation of 500 jobs and The plant will manufacture 1,815,000 square meters of floor slabs, 1,798,000 square meters of facing slabs and 165,000 linear meters of decorative slabs per year. In the near future, the enterprise will manufacture slabs of all sizes in accordance with demand.

6a16dcb43351.jpg


752e11cc149d.jpg


91b94553414d.jpg
 
Last edited:
@Azeri440
Can you please mention the production capacity of these factories as well?
 

Country Latest Posts