What's new

CPEC: Pakistan Wins War Against India Without Even Starting One

^^^^
You keep saying that you don't care and you keep replying....so far the most number of posts in this thread is yours and expecting Pakistanis to not talk about India is foolish.
 
.
I have no issues with CPEC or decisions Pakistanis make. Its their country. I wish they chose an alternate title and I might have not even clicked this thread at all.
Raja Jee its so adoring to see you "not caring" about Pakistan and CPEC. Specially when you do that on a CPEC thread on a PAKISTANI forum and do that "Don't care" five times in 16 posts. So cute! :) guchi guchi goo!! :woot:
 
.
Raja Jee its so adoring to see you "not caring" about Pakistan and CPEC. Specially when you do that on a CPEC thread on a PAKISTANI forum and do that "Don't care" five times in 16 posts. So cute! :) guchi guchi goo!! :woot:

I wouldnt have if u hadnt bought India onto it.

Second. Stop boasting Indians being here in Pdf. The PDF isnt the same when I joined. Second ask ur admins to ban indians which they wont do cos it means a loss of revenue Mr. Intelligent.
 
.
Sir. That's what I am telling. Projects have been going on. Putting Gwadar or Gujranwala PP under CPEC which have been under construction long before the term CPEC was coined is nothing.

Secondly yes. Many of the things are under construction. So does this "under construction" means the war is won as justified in thread title?

Dude, you are quite ignorant about CPEC. Here's a list of projects that are funded completely or mostly by CPEC and under construction. All of these have started after the CPEC agreement was signed, i.e. they wouldn't be possible without CPEC.

PUNJAB | Lahore - Abdul Hakim Motorway (M-3) | Infrastructure | U/C
PUNJAB/KHYBER PAKHTUNKHWA | Hakla-Dera Ismail Khan Motorway | Infrastructure | U/C
PUNJAB/SINDH | Multan - Sukkur Motorway (M-5) | Infrastructure | U/C
SINDH | Karachi - Hyderabad Motorway (M-9) | Infrastructure | U/C ‎
[URL='http://www.skyscrapercity.com/showthread.php?t=1845324']BALOCHISTAN | Gwadar Port Expressway | Infrastructure | 19 KM | U/C

BALOCHISTAN | Gwadar Port Expressway II | Infrastructure | 19 KM | U/C[/URL]
Balochistan/Sindh | Gwadar - Sukkur Motorway (M-8) | Infrastructure | U/C
And several national highways through Balochistan to facilitate CPEC good movements

PUNJAB | Sahiwal Coal Power Plant | 1320 MW | U/C
PUNJAB | Balloki Power Plant | 1223 MW | U/C
SINDH | Pakistan Port Qasim Coal Power Plant | 1320 MW | U/C
SINDH | Wind Power Projects | 1530 MW | U/C
PUNJAB | Haveli Bahadur Shah Power Plant | 1230 MW | U/C
PUNJAB | Bhikki Power Plant | 1180 MW | U/C
BALOCHISTAN | HUBCO Coal Power Plant | 1320 MW | U/C
SINDH | Thar Engro Coal Power Plant | 660 MW | U/C
JHELUM RIVER | Karot Hydropower Project | 720 MW | U/C
KHYBER PAKHTUNKHWA | Suki Kinari Hydropower Plant | 870 MW | U/C

Pakistan railways ML-1 track upgrade to 160 km/h specification

The following projects were already underway prior to CPEC but still have received substantial funding from CPEC:

LAHORE | Rapid Mass Transit System (Orange Line) | Infrastructure | U/C ‎
PUNJAB | Chashma Nuclear Power Complex (C3, C4, C5 Reactors) | 680 MW | U/C
KHYBER PAKHTUNKHWA/GILGIT-BALTISTAN | Karakoram Highway (N-35) Reconstruction | Infrastructure | U/C
AZAD JAMMU & KASHMIR | Neelum–Jhelum Hydropower Plant | 969 MW | U/C
BAHAWALPUR | Quaid-e-Azam Solar Park | 1500 MW | U/C
SINDH | Karachi Nuclear Power Complex (K2, K3 Reactors) | 2,200 MW | U/C
KHYBER PAKHTUNKHWA | Tarbela Dam 4th Extension | 1410 MW | U/C

This is why bharatis commenting on CPEC is usually quite hilarious. You guys almost always have no idea what you are talking about yet you love to butt in.
 
.
Now...That is our badass bro...Imran bhai....Great reply from you.

What matter is that Pakistanis are happy with CPEC and have no problem with it...Nor we care about those who have beef with it...Progress on CPEC is proof of it
One Musibet is better than a thousand Nesihat!!!! Pak had her share of the greatest Musibet (1971 as 1948/1965 made her little complacent) early in her lifetime, so she became well prepared for the next rounds (USSR & USA invasions in Afganistan, nukes, proxy terrorist wars etc.). And, now even the Indians are accepting that she has won this round without firing a bullet!!!!
 
Last edited by a moderator:
.
One Musibet is better than a thousand Nesihat!!!! Pak had it's share of the greatest Musibet (1971 as 1948/1965 made her little complacent) early in her lifetime, so she became well prepared for the next rounds (USSR & USA invasions in Afganistan, nukes, proxy terrorist wars etc.). And, now even the Indians are accepting that she has won this round without firing a bullet!!!!

:smitten:Thank you, dear...
 
.
I wouldnt have if u hadnt bought India onto it.

Second. Stop boasting Indians being here in Pdf. The PDF isnt the same when I joined.
So you mean you changed it for worst? Naughty!!
Tumhary aany sa he gnd para ha it means!!!
Second ask ur admins to ban indians which they wont do cos it means a loss of revenue
Why??
Why would i do that? I love to see Indians "not caring" about Pakistan here. Why would we ban them?

Mr. Intelligent.
Thank you. :)
 
.
We May have not won against India But one thing is for sure this CPEC is gonna boost the Economy of Pakistan

We are Getting the Infrastructure
we are getting the Power Plants
we are getting Economic Zones
Chinese Auto Mobile Industry is opening new Plants in Pakistan giving jobs to locals
Even Western Auto Mobile companies are coming Like Renault
We are making a New Port
Our Cities and Provinces are now being more connected with Motorways and Highways
Our Railway system is being overhauled
New Railway Tracks will be made in Balochistan KPK and Gilgit Baltistan

Our Cities are getting Mass Transit systems
We are Making new Dams in Pakistan Like Karot Suki Kinari Kohala and now Bhasha With cooperation with China


Yes China will get the Interest money but we will also get the benefit of all the above... This is just the beginning more project will be added in CPEC for sure
 
.
So you think you can pay off the 15% interest rate every year?...I am not an economist but i still have my doubts about how Pakistan is going to pay it off.

And Chinese people always dont hire the locals to do their work...they prefer their own people working in these projects and companies. And they also dont like to use produces from the local people but rather prefer bringing their own construction materials.

Lets see how this works out.

http://www.ccstlm.com/news.aspx?id=630

If they are shutting down all their coal power plants this year then why sell it to Pakistan?
 
.
So you think you can pay off the 15% interest rate every year?...I am not an economist but i still have my doubts about how Pakistan is going to pay it off.

And Chinese people always dont hire the locals to do their work...they prefer their own people working in these projects and companies. And they also dont like to use produces from the local people but rather prefer bringing their own construction materials.

Lets see how this works out.

Well They Gonna Build the projects Own the Projects Operate the Projects and Will get the income generated from those projects for like 20-25 years after that they gonna transfer those projects to Government

The Chinese workers quantity is still much less then the quantity of Locals

There are like 25-30 projects that are Under Construction how the hell they are getting material for every single project ?? They Mostly import Machinery Even we are importing machinery for many projects from General Electric USA

And the Interest rate is 4-5% in some projects it's 8% not 15%
 
.
Well They Gonna Build the projects Own the Projects Operate the Projects and Will get the income generated from those projects for like 20-25 years after that they gonna transfer those projects to Government

The Chinese workers quantity is still much less then the quantity of Locals

There are like 25-30 projects that are Under Construction how the hell they are getting material for every single project ?? They Mostly import Machinery Even we are importing machinery for many projects from General Electric USA

And the Interest rate is 4-5% in some projects it's 8% not 15%

Well so you are going to set up toll plazas enroute? So maintainance is also an integral part of the project so what are the norms and who is going to shell out for the maintenance is it you or the Chinese? well and I thought up that 15% interst as the Chinese banks had negotiated around 4 to 5% higher than the LIBOR because of the higher risk. Hope Pakistan dosent end up as some Central Asian country who had to give 15 000 acres or some land to Chinese companies as collateral for the inability to pay loans
 
.
Well so you are going to set up toll plazas enroute? So maintainance is also an integral part of the project so what are the norms and who is going to shell out for the maintenance is it you or the Chinese? well and I thought up that 15% interst as the Chinese banks had negotiated around 4 to 5% higher than the LIBOR because of the higher risk. Hope Pakistan dosent end up as some Central Asian country who had to give 15 000 acres or some land to Chinese companies as collateral for the inability to pay loans

yupe there'll be Toll Plaza on all Motorways just like the Current one has

O4En3E5.png


56497d168330f.jpg

messenger-45.jpg
 
.
We May have not won against India But one thing is for sure this CPEC is gonna boost the Economy of Pakistan

We are Getting the Infrastructure
we are getting the Power Plants
we are getting Economic Zones
Chinese Auto Mobile Industry is opening new Plants in Pakistan giving jobs to locals
Even Western Auto Mobile companies are coming Like Renault
We are making a New Port
Our Cities and Provinces are now being more connected with Motorways and Highways
Our Railway system is being overhauled
New Railway Tracks will be made in Balochistan KPK and Gilgit Baltistan

Our Cities are getting Mass Transit systems
We are Making new Dams in Pakistan Like Karot Suki Kinari Kohala and now Bhasha With cooperation with China


Yes China will get the Interest money but we will also get the benefit of all the above... This is just the beginning more project will be added in CPEC for sure
Bottom-line: don't give fish, but show how to fish!!!!

Well They Gonna Build the projects Own the Projects Operate the Projects and Will get the income generated from those projects for like 20-25 years after that they gonna transfer those projects to Government

The Chinese workers quantity is still much less then the quantity of Locals

There are like 25-30 projects that are Under Construction how the hell they are getting material for every single project ?? They Mostly import Machinery Even we are importing machinery for many projects from General Electric USA

And the Interest rate is 4-5% in some projects it's 8% not 15%
They won't accept anything other than the utter destruction of Pak!!! Why are you beating the shadows?????
 
.
I wouldnt have if u hadnt bought India onto it.

Second. Stop boasting Indians being here in Pdf. The PDF isnt the same when I joined. Second ask ur admins to ban indians which they wont do cos it means a loss of revenue Mr. Intelligent.
So you think you can pay off the 15% interest rate every year?...I am not an economist but i still have my doubts about how Pakistan is going to pay it off.

And Chinese people always dont hire the locals to do their work...they prefer their own people working in these projects and companies. And they also dont like to use produces from the local people but rather prefer bringing their own construction materials.

Lets see how this works out.

http://www.ccstlm.com/news.aspx?id=630

If they are shutting down all their coal power plants this year then why sell it to Pakistan?



It doesn't matter what indians think or say. It is irrelevant & immaterial. indians also vehemently claimed that Pakistan would NEVER EVER become a nuclear weapons state with or without Chinese assistance. That Pakistan would cease to exist before it would gain nukes. We all know what happened to that retarded delusional indian bollywood fantasy. Just as then so is now.
 
.
So you think you can pay off the 15% interest rate every year?...I am not an economist but i still have my doubts about how Pakistan is going to pay it off.

And Chinese people always dont hire the locals to do their work...they prefer their own people working in these projects and companies. And they also dont like to use produces from the local people but rather prefer bringing their own construction materials.

Lets see how this works out.

http://www.ccstlm.com/news.aspx?id=630

If they are shutting down all their coal power plants this year then why sell it to Pakistan?

Pray tell, where did the 15% interest rate figure come from?

In addition, perhaps because Pakistan has energy shortage and coal plants are fast to build, we're building coal power plants?
 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom