cirr
ELITE MEMBER
- Joined
- Jun 28, 2012
- Messages
- 17,049
- Reaction score
- 18
- Country
- Location
4.29 Construction of first Inner Mongolia HSR starts
Hohhot-Zhangjiakou HSR:
Length: 286.8km (211.3km in Inner Mongolia, 75.5km in Hebei Province)
Speed: 250kmph
Stations: 6(Hohhot East、Qixiananyin、Zuozidong、Wulanchabu、Xinghebei in IM and Huaian in Hebei)
Bridge/Tunnel: 62% of total length
Cost: CNY 29.597 bln
Duration: 4 years
source
Hohhot-Zhangjiakou HSR:
Length: 286.8km (211.3km in Inner Mongolia, 75.5km in Hebei Province)
Speed: 250kmph
Stations: 6(Hohhot East、Qixiananyin、Zuozidong、Wulanchabu、Xinghebei in IM and Huaian in Hebei)
Bridge/Tunnel: 62% of total length
Cost: CNY 29.597 bln
Duration: 4 years
source
Last edited: