What's new

China Pakistan Economic Corridor (CPEC) | Power Plants

330MW Thar coal project achieves financial close

02 Oct 2020


The Private Power and Infrastructure Board (PPIB) has signed a financial closing document for the 330MW mouth lignite coal power project at Thar Block-II.

ISLAMABAD: The Private Power and Infrastructure Board (PPIB) has signed a financial closing document for the 330MW mouth lignite coal power project at Thar Block-II.
PPIB Managing Director Shah Jahan Mirza and M/s Thal Ltd Chief Executive Officer Saleemullah Memon signed the document.

The project is being sponsored by M/s Thal, M/s Novatex and M/s Descon Engineering under the banner of CPEC at a total cost of $497 million. China Development Bank (CDB) is the lead arranger for foreign financing from China and Habib Bank for the local.

The plant will be fuelled by coal extracted from Thar Block II by the Sindh Engro Coal Mining Company and it will utilise 1.9 million tonnes of coal to generate 2,236 GWh per annum. The sponsors have already started construction activities ahead of financial closing and are looking complete this project by March 2021.
The plant will be connected with Matiari-Lahore Transmission Line for transmission of electricity. Being developed using state-of-the-art coal technology, the project complies with all international as well as federal and provincial environmental standards.

Its development is also expected to contribute in the socioeconomic upliftment of backward Tharparkar area which is now emerging as the energy capital of Pakistan.

For giving boost to the utilisation of indigenous resources for power generation in line with the vision of the present government, PPIB in addition to Thar coal-based generation is also handling 14 hydropower projects (HPPs) of 6,175MW in the private sector.

These HPPs are at different stages of implementation. By 2022, PPIB is targeting to fetch another 5,500MW through completion of 10 projects, majority of which are based on Thar coal and hydro.

PPIB is also implementing Pakistan’s first private sector +660kV Matiari-Lahore Transmission Line, aiming to transmit electricity from coal projects in the southern zone to the load centres.

Published in Dawn, October 2nd, 2020
 
.
Smooth delivery of first Turbine runner – 720 MW Karot Hydropower project....

With the joint efforts and cooperation of all stakeholders, the first runner of Karot HPP was successfully delivered in the main powerhouse. After arriving in Pakistan, it took 46 days for customs clearance and inland transportation for a 1700 km route.

On arriving the heaviest and widest piece of equipment, the Project Management dedicated this victory to the 71st Birthday of China considering the importance of milestone.


1601673343663.png




1601673370423.png
 
.
Smooth delivery of first Turbine runner – 720 MW Karot Hydropower project....

With the joint efforts and cooperation of all stakeholders, the first runner of Karot HPP was successfully delivered in the main powerhouse. After arriving in Pakistan, it took 46 days for customs clearance and inland transportation for a 1700 km route.

On arriving the heaviest and widest piece of equipment, the Project Management dedicated this victory to the 71st Birthday of China considering the importance of milestone.


View attachment 675594



View attachment 675595
any idea who the manufacturer of the turbine is?
 
. . . . .
The government of the province of Khyber Pakhtunkhwa, Pakistan, announced on August 24, 2016, that it has signed an agreement with SK Hydro Private Ltd. and Industrial and Commercial Bank of China to develop and construct the dam.:pakistan:

Thank you pervaiz Khatak
 
.
Thank you pervaiz Khatak

No he was custodian, its our money, we will pay taxes for returning this loan with interest. Lets get ourselves out of thank you NS, SS, IK or PK syndrome.
 
. .
Realignment of KKH under Dasu Hydropower Project.

The concrete lining works are in progress. The tunnel length is 180 m including a 60m open tunnel of 10.2m x 12.4m (HxW).

On completion of the 242 meter high dam, the existing KKH will submerge and realigned roads at higher elevation are under construction having 07 road tunnels.


1602181657579.png





1602181878087.png






1602181923256.png
 
.
Two Diversion Tunnels named as Diversion Tunnel A (L=1.5 KM) & Diversion Tunnel B (L=1.3 KM), as shown in the pictures, are being constructed at 4320 MW #Dasu Hydropower Project by using Drill & Blast method in 4 lifts (layers) of different heights.

Excavation section of the diversion tunnel is adopted a “D” section. The dimensions of excavation section are 24.6m×27.3m at inlets & outlets while 20.4m×24.2m in main underground Tunnels. To avoid flood during flood season and safe construction, gravity concrete dyke in diversion tunnel inlet and outlet was constructed.

The main underground excavation of the tunnel is divided into four layers. The excavation height of the layer I is 8.2m, the height of the layer II is 5m, and the excavation height of the layer III is 8.0m, the height of the layer IV is 3.0m.

Credits: Engr. Tufail



1602534509130.png





1602534531224.png
 
.
Under Construction Right Access Road (RAR) to Dasu Dam Weir. The total length of the section is 12 Km and the main contractor's are China Civil Engineering Construction Corporation (CCECC) and China Railway Construction Corporation (CRCC).


1602535905660.png






1602535968164.png



1602536005731.png
 
.
The Future of Thar
Thar Block-1 Integrated Coal Mine Power Project is a key energy project in the #OBOR energy field and also a core energy cooperation project in the CPEC.


1602723759308.png
 
. .

Latest posts

Pakistan Defence Latest Posts

Back
Top Bottom