What's new

Chengdu J-10 Multirole Fighter Air Craft News & Discussions

. .
initial order for 36 between 2014-2015
more orders to follow, final number could be up to 150 FC-20

Lookz like a pretty formidable number ..Alhamdolillah.....:)

---------- Post added at 09:58 AM ---------- Previous post was at 09:57 AM ----------

i have only one concern why the hell 2014 for this simple order?>\

Looks like Ghaddariz politics involved......:what:
 
.
i have only one concern why the hell 2014 for this simple order?>\

good things come to those who wait :agree:

The reason for it taking so long is that it will come with lots of goodies, recently produced by China.
AESA, IRST, DSI, SD-10B, RAM coating, Newer ECM/EW suite + KG-300G.
It will be a damn good 4.5 gen fighter
 
.
According to my knowledge, the last time I researched for it, the initial order is of 36. The second order was of 36. So minimum of a 72.
I dont think we may acquire more.
 
.
According to my knowledge, the last time I researched for it, the initial order is of 36. The second order was of 36. So minimum of a 72.
I dont think we may acquire more.

depends on alot of factors... such as Indian MMRCA, JF-17 block II and III (if it lives up to it's potential or surpasses it), state of our economy, WOT and our defence budget.

I think 72 of these beasts would pack quite a punch.
 
.
depends on alot of factors... such as Indian MMRCA, JF-17 block II and III (if it lives up to it's potential or surpasses it), state of our economy, WOT and our defence budget.

I think 72 of these beasts would pack quite a punch.

Inside news also tellme that J-11s are being considered. So its around 72 for now. If Block II of JF-T is a huge success (InShaAllah will be), then we might try something else.
 
.
|People
We have a running thread on FC20 .Why do we need a second thread to sask a simple question of numbers.
MODS please merge this thread with the running thread on FC20.
On that forum you will finds the answerr to your post.
Araz
 
.
According to my knowledge, the last time I researched for it, the initial order is of 36. The second order was of 36. So minimum of a 72.
I dont think we may acquire more.

I hope we get at least 100 of them if possible...Insha-Allah......:cheesy:
 
.
Quoted from Pshamim

I can say with certainity that number of FC-20s have been increased to 58 from 46. Will provide PAF an additional squadron. But I am certain the numbermay increase further. A recent news I posted about transfer of technology to Pakistan will make sense if PAF intends to go for larger numbers.
 
.
if PAF buys more fc20's that means less number of jf17!!! or PAF might want to increase its size!
 
.
J-10B Gets AESA
Posted by Bill Sweetman at 6/14/2011 7:07 AM CDT
New Chinese internet images appear to show what has been suspected for some time: The new J-10B version of Chengdu's canard fighter is fitted with an electronically scanned array radar. It could be a Rafale-type passive ESA, but that's improbable in 2011 -- it is more likely an active ESA, its development quite likely aided by China's massive campaign of cyberespionage.

J-10B Gets AESA

The J-10B is interesting because it represents a major block change to what is itself a relatively new design. The most visible change is the diverterless supersonic inlet -- a feature that is usually associated with front-sector radar cross-section reduction. (The DSI was originally developed for an improved F-16 design.) In the J-10B's case, it may also be a less costly and less noisy alternative to the strut-braced mixed-compression ramp on the original design -- but the latest J-10B photos also show the telltale tint of a metallic-treated canopy.




Other changes include what appears to be a new electronic warfare system with larger antennas in underwing fairings and a fin-tip housing, and a missile approach/launch warning system. A standard J-10 has also been seen with twin-rail launchers for PL-12 missiles.

please refrain from adding news which have already been discussed....
 
.
if PAF buys more fc20's that means less number of jf17!!! or PAF might want to increase its size!
FC-20 and JFT are complements rather than substitutes. So having larger FC-20 fleet is independent from JFT procurement plan. JFTs will be inducted as per schedule.
 
. . .

Country Latest Posts

Back
Top Bottom