SBD-3
ELITE MEMBER
- Joined
- Sep 19, 2008
- Messages
- 15,120
- Reaction score
- -9
- Country
- Location
If the delievery date is 2013-2014, I do not forsee Pakistan is getting the B version at all. Remember that J-10B has not finished testing as of this moment yet, and CAC must satisfy PLAAF's own demands first, which is at least over a hundred aircraft. It's safe to assume once production of J-10B starts somewhere next year, J-10A line will no longer continue as we've seen in J-11A lines when J-11B became available.
There is no political reason why Pakistan can't get the B model, as Pakistan has always obtained what it needed in the past from China in the past. China was introducing the J-10A at around 20 planes a year from 2004 onwards. Going by that rate, I don't know how Pakistan will get J-10B before 2015 unless production is drastically increased.
If Pakistan has to get J-10 between 2013 and 2014, there is a good chance it will be an upgraded A version.
What i foresee is that CAC will double the current production (3 ACs a month) by opening second production line as I read it in somewhere in a report. The idea is also reinforced by the fact that PLAAF J-10As will also be taking MLU as J-10B becomes operative. And PAF will customize its FC-20 with western avionics. There are also reports that J-10B will be coming with ToT. So it will be PAF's headache to operate a separate line as CAC production lines will be busy in catering PLAAF and export customers