Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I give our Indian friends 5 years to make this rusty bird partially operational.
This will stay on drawing board.
Its not good enough for defence forces. As they act like some super rich kids who want expensive toys.
Corruption in defence will eat this bird. Its bound to be a failure.
Apart from that its design is not upto mark . Tjey should have got one propeller in back and keep more place for hard points.
Thats right both IAF and IA have already made up there mind to buy US avanger and predator type UAV & UCAVs and some frontline israeli drones rustom-2 will only die as a test bed and thats itThis will stay on drawing board.
Its not good enough for defence forces. As they act like some super rich kids who want expensive toys.
Corruption in defence will eat this bird. Its bound to be a failure.
Apart from that its design is not upto mark . Tjey should have got one propeller in back and keep more place for hard points.
its just a prototype and is still 10 years from being oprational so dont even botherIs it just for survalience or having embedded missile?
its just a prototype and is still 10 years from being oprational so dont even bother
it could be even more10 years !?
it could be even more
why cant they rope in bajaj or TVS or hero group and make aero engines out of there existing 4 stroke line by arrenging them into diffrent configurations ?dont want to be party pooper. But I think it need more powerful engine.
corruption and kick backs from foriegn arms dealsWhy... Our UCAV unveiled in 2012 and got operational in 2014 !