What's new

Block 2 JF-17 makes first flight ahead of Block 3 improvements

Pics Pics Pics

Its the same thing

175251wxgfkk2plluipkdl.jpg
 
. . . .
这是个不错的好消息,这是巴基斯坦自己能够完全生产掌握的战机,通过不断的升级改进航电系统,雷达,发动机,飞控软件,我的理想预期是枭龙能够使用本国为战机生产的各种空战武器,也可以很好的兼容中俄的各种空战武器。个人不赞成把枭龙战机掺杂太多的西方设备,欧美国家买来的东西必须经过技术上的消化吸收,真正杜绝后门,真正意义上的掌握,才能放心使用。
 
.
Alan Warnes, Kamra, Pakistan - IHS Jane's Defence Weekly
16 March 2015

The first Block 2 JF-17 Thunder combat aircraft made its maiden flight from the Pakistan Aeronautical Company (PAC) facility at Kamra on 9 February.

The aircraft (serial number 2P01) made three more successful flights before being taken to the paint shop in mid-February. The test flights came as a boost as PAC continues to look for a first export customer for its platform.

Air Commodore Ahsan Rafiq, Deputy Chief Project Director (Operations) JF-17 and a former commanding officer of the JF-17 Test and Evaluation Unit, described the Block 2 version as "an upgraded Block 1 with an air-to-air refuelling (AAR) probe, enhanced oxygen system [to allow the pilot to stay in the air longer], and improved electronic countermeasures system (ECS)".

Block 2 JF-17 makes first flight ahead of Block 3 improvements - IHS Jane's 360
Finally Finally and Finally at last news comes Thanks ALLAH great days for Armed Forces
 
. . .
2P01
2P02
2P03



:pakistan::pakistan::pakistan:

这是个不错的好消息,这是巴基斯坦自己能够完全生产掌握的战机,通过不断的升级改进航电系统,雷达,发动机,飞控软件,我的理想预期是枭龙能够使用本国为战机生产的各种空战武器,也可以很好的兼容中俄的各种空战武器。个人不赞成把枭龙战机掺杂太多的西方设备,欧美国家买来的东西必须经过技术上的消化吸收,真正杜绝后门,真正意义上的掌握,才能放心使用。

English Translation:

This is a good news , it is Pakistan that they can fully produce master fighter , improved avionics system through continuous upgrades , radar , engine, flight control software , my ideal is expected to be Xiaolong able to use their own for aircraft production of the species of air weapons can also be very good compatibility Russia various combat weapons. Xiaolong fighter personally would not put too much Western doping equipment , European countries have bought something through the digestion and absorption of technology , really put an end to the back door , to grasp the true sense , in order to ease of use.
 
Last edited:
.
the Block 2 version as "an upgraded Block 1 with an air-to-air refuelling (AAR) probe, enhanced oxygen system [to allow the pilot to stay in the air longer], and improved electronic countermeasures system (ECS)".
Very minor upgrades to be honest, especially considering all Block 1's will get the aerial refueling probe.
 
.
Block 2 JF-17 makes first flight ahead of Block 3 improvements

Publication:Jane's Defence Weekly
Last posted:2015-03-17

The first Block 2 JF-17 Thunder combat aircraft made its maiden flight from the Pakistan Aeronautical Company (PAC) facility at Kamra on 9 February.
The aircraft (serial number 2P01) made three more successful flights before being taken to the paint shop in mid-February. The test flights came as a boost as PAC continues to look for a first export customer for its platform.
Air Commodore Ahsan Rafiq, Deputy Chief Project Director (Operations) JF-17 and a former commanding officer of the JF-17 Test and Evaluation Unit, described the Block 2 version as "an upgraded Block 1 with an air-to-air refuelling (AAR) probe, enhanced oxygen system [to allow the pilot to stay in the air longer], and improved electronic countermeasures system (ECS)".
The Pakistan Air Force (PAF) has a contract for 50 Block 2 JF-17s but as Air Cdre Ahsan pointed out, "the full AAR system will not appear until the 29th jet, which should fly later this year [at Chengdu Aircraft Corporation (CAC) in China]."
In a further development that sends a clear signal that PAC and Chinese marketing partner CATIC intend business in the international arena, the Block 2 JF-17 will also have a two-seater version, which is now being developed at Chengdu according to the PAF's requirements.
"We know potential customers would like to see a two-seater, although it is not such a big deal for the PAF, which started flying several types, [A-5, F-6, F-7P and F-7PG] without a training version," Air Cdre Ahsan said. "This will give us the chance to show potential suitors how the jet can perform in the air."

COMMENT

Air Cdre Ahsan said that while Block 1 and 2 JF-17s will not differ significantly - with Block 1 JF-17's ECS likely to be upgraded when it suits the PAF, it will be a different story with the Block 3 series.
"We are still developing the Block 3 configuration, but it will be a considerably different aircraft compared to the previous two blocks," he said. "A new AESA [active electronically scanned array] radar will be integrated, but this is still in the design stage; however, we are looking at both Western and Eastern options."
Integrating an AESA with the SD-10A beyond-visual-range missile will provide the PAF and any other JF-17 operator with a long-range, all-aspect precision day and night engagement capability.
As the JF-17 continues to evolve, aircraft units will start coming off the PAC Kamra production line more quickly. The facility is also set to reach the 58% transfer of technology agreed with China, which had been previously slowed down to keep it in line with the plant's infrastructure and equipment growth.


094641r4y99fsztnsnwfn4.jpg

This Block 2 JF-17, with its KLJ-7 airborne pulse doppler fire-control radar visible, was one of the few units on the production line at PAC Kamra on 19 February. The Block 3 version, now being developed, will accommodate a new AESA radar. (Alan Warnes)

094641hb2b11b1a382usoo.jpg

The second Block 2 JF-17 sits in the flight test station at PAC Kamra, awaiting its first flight. (Alan Warnes)
 
. .
Block 2 JF-17 makes first flight ahead of Block 3 improvements

Publication:Jane's Defence Weekly
Last posted:2015-03-17

The first Block 2 JF-17 Thunder combat aircraft made its maiden flight from the Pakistan Aeronautical Company (PAC) facility at Kamra on 9 February.

The aircraft (serial number 2P01) made three more successful flights before being taken to the paint shop in mid-February. The test flights came as a boost as PAC continues to look for a first export customer for its platform.

Air Commodore Ahsan Rafiq, Deputy Chief Project Director (Operations) JF-17 and a former commanding officer of the JF-17 Test and Evaluation Unit, described the Block 2 version as "an upgraded Block 1 with an air-to-air refuelling (AAR) probe, enhanced oxygen system [to allow the pilot to stay in the air longer], and improved electronic countermeasures system (ECS)".

The Pakistan Air Force (PAF) has a contract for 50 Block 2 JF-17s but as Air Cdre Ahsan pointed out, "the full AAR system will not appear until the 29th jet, which should fly later this year [at Chengdu Aircraft Corporation (CAC) in China]."

In a further development that sends a clear signal that PAC and Chinese marketing partner CATIC intend business in the international arena, the Block 2 JF-17 will also have a two-seater version, which is now being developed at Chengdu according to the PAF's requirements.

"We know potential customers would like to see a two-seater, although it is not such a big deal for the PAF, which started flying several types, [A-5, F-6, F-7P and F-7PG] without a training version," Air Cdre Ahsan said. "This will give us the chance to show potential suitors how the jet can perform in the air."

COMMENT

Air Cdre Ahsan said that while Block 1 and 2 JF-17s will not differ significantly - with Block 1 JF-17's ECS likely to be upgraded when it suits the PAF, it will be a different story with the Block 3 series.

"We are still developing the Block 3 configuration, but it will be a considerably different aircraft compared to the previous two blocks," he said. "A new AESA [active electronically scanned array] radar will be integrated, but this is still in the design stage; however, we are looking at both Western and Eastern options."

Integrating an AESA with the SD-10A beyond-visual-range missile will provide the PAF and any other JF-17 operator with a long-range, all-aspect precision day and night engagement capability.

As the JF-17 continues to evolve, aircraft units will start coming off the PAC Kamra production line more quickly. The facility is also set to reach the 58% transfer of technology agreed with China, which had been previously slowed down to keep it in line with the plant's infrastructure and equipment growth.


094641r4y99fsztnsnwfn4.jpg

This Block 2 JF-17, with its KLJ-7 airborne pulse doppler fire-control radar visible, was one of the few units on the production line at PAC Kamra on 19 February. The Block 3 version, now being developed, will accommodate a new AESA radar. (Alan Warnes)

094641hb2b11b1a382usoo.jpg

The second Block 2 JF-17 sits in the flight test station at PAC Kamra, awaiting its first flight. (Alan Warnes)

Everyone should remember this article of many key points, don't repeat same discussion.
 
Last edited:
. . .

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom