Quwa
Research Partner
- Joined
- May 16, 2006
- Messages
- 2,538
- Reaction score
- 47
- Country
- Location
I'm looking at the MiG-29 to MiG-29M/M2 to MiG-35 evolution. The airframe ought to be enlarged and lightened, ideally with sizable composite material use. Not sure if RD-93MA will be around by Block-III, but it definitely needs to be available for Block-IV/NG; if not, a new powerplant line must be considered. This Thunder NG would be right up there with the 4.5+ gen fighters such as the MiG-35 and Gripen NG, and easily serve alongside the FC-31.Hi,
I think that would be too late---I think that it should be before 2020. The NG type upgrade does not require too many modifications---.
I believe that it is a one year project---six months to a year in testing and production after a total of two years---.
@Tank131 @MastanKhan