What's new

Bangladesh Navy

The pic of hull 522 taken on August 7, 2018:
捕获.PNG

@The Ronin
 
. . . .
Bangladesh installed Smart S mark IV 3D naval pesa radar on its flag ship BNS Bangabandhu . rang 250km .:-)
 
. . . . . . .
Bangladesh Navy going issue tender for 2 guided missile frigate as indigenous frigate program delayed .
 
.
Bangladesh Navy going issue tender for 2 guided missile frigate as indigenous frigate program delayed .
again? wait are you talking about the same classes that will be built locally? because that is pre planned... two of them will be built in china... then the construction is to start here
 
.
again? wait are you talking about the same classes that will be built locally? because that is pre planned... two of them will be built in china... then the construction is to start here
Two frigate will come off the self from either Korea it China Planed indigenous frigate delayed as necessary infrastructure development and training not yet completed. Construction will start from late 2019 as per DTB.
 
.
Planed delayed as necessary infrastructure development and training not yet completed. Construction will start from late 2019 as per DTB.

Do you know if the second Type 053H3 is coming from China or did it get limited to just one?
 
.

Pakistan Affairs Latest Posts

Back
Top Bottom