What's new

An Insight into Al-Khalid II MBT.

AK should be in +400 units of both AK and AK-I as we know previously from official sources (click here) that there were around 324 till 2014-2015 till end of 2017 30 more was handover Army for this plz see attached screenshots

View attachment 575549 View attachment 575550

which mean till end of 2017 we had 324+30=350+ AK and AK-I and as per one report HIT was targeting production of 25 tanks per year onward so +400 is possible till end of 2019
Well, you are correct that AK1 production is in full swing.

Below are hulls of fresh AK1
vlcsnap-2019-08-25-22h54m00s353.png


A freshly produced AK1. (ERA is yet to install)

vlcsnap-2019-08-25-22h56m18s832.png


And 6TD-02 1200 HP diesel engine.

vlcsnap-2019-08-25-22h55m53s037.png
 

Attachments

  • vlcsnap-2019-08-25-22h54m00s353.png
    vlcsnap-2019-08-25-22h54m00s353.png
    931.9 KB · Views: 99
Well, you are correct that AK1 production is in full swing.

Below are hulls of fresh AK1
View attachment 575938

A freshly produced AK1. (ERA is yet to install)

View attachment 575939

And 6TD-02 1200 HP diesel engine.

View attachment 575940
Many thanks for this. Any chance of getting a 1500 hp engine from ukraine. There has been alot of talk around this and of i am not mistaken then a few MOUs were signed as well... Any concrete steps around getting a higher / better engine?
 
AK should be in +400 units of both AK and AK-I as we know previously from official sources (click here) that there were around 324 till 2014-2015 till end of 2017 30 more was handover Army for this plz see attached screenshots

View attachment 575549 View attachment 575550

which mean till end of 2017 we had 324+30=350+ AK and AK-I and as per one report HIT was targeting production of 25 tanks per year onward so +400 is possible till end of 2019
What does it take to increase the parallel production capabilities? I am sorry if this has been discussed before. Please point me in the right direction if that being the case.
 
Specially downloaded it for sake of taking snapshots.
It seems Pakistan has rebuilt initial batch of 5 UDs only, as a test case.

True, 5 UDs are locally upgraded with Ukrainian assistance for now. All 320 will undergo the upgrades.
 
True, 5 UDs are locally upgraded with Ukrainian assistance for now. All 320 will undergo the upgrades.

I thought it is just a rebuild and overhauling programm, what do the upgrades include?
 
Last edited:
Back
Top Bottom