What's new

"Admiral Gorshkov" Aircraft carrier delayed again for Power paralyzed

The last ship that India is getting from Russia. No more russian made ships. We can build our own ships now. Completely self sufficient in this field now. Indian ports today are capable of building every kind of ship. Industry is expanding by leaps and bounds. Screw russians, too slow and costly.
 
if the russia news is real, india should cancell the deal...
7 of the 8 constitute a power plant steam boiler seriously damaged.
big money to repair these. and the russia will surely not pay for it

agree, The russia will surely not pay for it

Very bad Russian they are playing India :tdown:
 
The last ship that India is getting from Russia. No more russian made ships. We can build our own ships now. Completely self sufficient in this field now. Indian ports today are capable of building every kind of ship. Industry is expanding by leaps and bounds. Screw russians, too slow and costly.

maybe india homemade carrier will get into service before the "Gorshkov".:D
 
Moscow, Sep 17 (IANS/RIA Novosti) Malfunctions detected during trials of Indian Navy aircraft carrier Vikramaditya will delay the vessel’s handover to India, the Kommersant business daily reported Monday.

The Vikramaditya, formerly the Russian Navy's Admiral Gorshkov, is to be handed over to India after ongoing sea trials following a much-delayed refit. According to the latest agreements, it was to have been handed over Dec 4, but the deadline has been postponed again until October 2013.

The problems started when the vessel tried to gain maximum speed.

“Seven out of eight steam boilers of the propulsion machinery were out of order,” an official told Kommersant.

The official, who prepared the Vikramaditya for sea trials, said the reason for the boilers’ failure was that India refused to use asbestos as a means to protect the boilers from heat, fearing that the material was dangerous for the crew.

He said the boilers’ designer had to use firebrick, which proved not sufficiently heatproof, the official said.

INS Vikramaditya trial malfunctions to delay handover to India - Pluz Media
 
Moscow, Sep 17 (IANS/RIA Novosti) Malfunctions detected during trials of Indian Navy aircraft carrier Vikramaditya will delay the vessel’s handover to India, the Kommersant business daily reported Monday.

The Vikramaditya, formerly the Russian Navy's Admiral Gorshkov, is to be handed over to India after ongoing sea trials following a much-delayed refit. According to the latest agreements, it was to have been handed over Dec 4, but the deadline has been postponed again until October 2013.

The problems started when the vessel tried to gain maximum speed.

“Seven out of eight steam boilers of the propulsion machinery were out of order,” an official told Kommersant.

The official, who prepared the Vikramaditya for sea trials, said the reason for the boilers’ failure was that India refused to use asbestos as a means to protect the boilers from heat, fearing that the material was dangerous for the crew.

He said the boilers’ designer had to use firebrick, which proved not sufficiently heatproof, the official said.

INS Vikramaditya trial malfunctions to delay handover to India - Pluz Media

They always did this, for South Korean rocket explosion, they aways said that this was the fault of South Koreans
 
They always did this, for South Korean rocket explosion, they aways said that this was the fault of South Koreans

Kya farak paynda hai, Is thread ke uchalthe bandoron ki bolti tho bandh kar di maine.

Could be the real reason, who knows.
 
You mean challenge you in term of delay? Absolutely no

if no one is here to challenge them they in fact no need to waste billions on weapons .its we force india to buy more and more even Russia do whatever with them have to buy .if its not challenge so whats challenge ? a deal of few hundred millions reached in billions and years of delay still chest thumping kids attacking pak china as we delay it :rofl:
 
Moscow, Sep 17 (IANS/RIA Novosti) Malfunctions detected during trials of Indian Navy aircraft carrier Vikramaditya will delay the vessel’s handover to India, the Kommersant business daily reported Monday.

The Vikramaditya, formerly the Russian Navy's Admiral Gorshkov, is to be handed over to India after ongoing sea trials following a much-delayed refit. According to the latest agreements, it was to have been handed over Dec 4, but the deadline has been postponed again until October 2013.

The problems started when the vessel tried to gain maximum speed.

“Seven out of eight steam boilers of the propulsion machinery were out of order,” an official told Kommersant.
l
The official, who prepared the Vikramaditya for sea trials, said the reason for the boilers’ failure was that India refused to use asbestos as a means to protect the boilers from heat, fearing that the material was dangerous for the crew.

He said the boilers’ designer had to use firebrick, which proved not sufficiently heatproof, the official said.

INS Vikramaditya trial malfunctions to delay handover to India - Pluz Media

Russian tech is now dilapidated, just forget it.
 