well huge CNC's were installed in 2011 in PAC to manufacture the whole Air frame.
it is just the part of the 50 JFT to be delivered on urgent basis by china
this will really speed up the delivery
and a goal of 150 JFT by 2015 would be completed
(50 block I)
(50 from china on urgent basis)
(50 parallel manufacturing at PAC as well)
it is just the part of the 50 JFT to be delivered on urgent basis by china
this will really speed up the delivery
and a goal of 150 JFT by 2015 would be completed
(50 block I)
(50 from china on urgent basis)
(50 parallel manufacturing at PAC as well)