What's new

TF-X Turkish Fighter & Trainer Aircraft Projects

so what, they turned to GE F110 ?
It's been known for some time now that the initial prototypes will use the F110. The latter prototypes and final plane will use an indigenous engine, whether it'll be %100 Turkish or a derivative of GE or someone else is still unclear AFAIK.
 
He added TF-X, Hürkus and Hürjet... :enjoy:

D2MWfgjXcAAUs47.jpg


source: Twitter @miguyan2000
 
He added TF-X, Hürkus and Hürjet... :enjoy:

D2MWfgjXcAAUs47.jpg


source: Twitter @miguyan2000

Some one should tell @miguyan that ANKA II is not a project anymore.
 
New specifications of TF-X MMU

  • Wing area is improved to 70m2(previously 60m2)
  • Wing length improved to 14m (previously 12m)
  • Payload capacity revealed 20,000lbs
  • Rate of climb revealed 60,000fpm
View attachment 548038 View attachment 548039

I have asked a couple of ppl but they dont know whether that 25.000 lbs dry trust or not . it looks like we are getting our own Raptor . (Ciddi ciddi bunlar Raptora bagladi isi)
 
I have asked a couple of ppl but they dont know whether that 25.000 lbs dry trust or not . it looks like we are getting our own Raptor . (Ciddi ciddi bunlar Raptora bagladi isi)
It was always envisioned as Turkey's version of the raptor from its inception (AFAIK), but albeit had significantly lower specs, which was to be expected as we're talking about the US and Turkey here.

It's heartening to see that the gap is actually going to be much narrower then previously thought. We still don't know how stealthy we'll actually be able to make the engine to be, but nevertheless, this news is a good indicator that Turkey's defence industry is firing on all cylinders.

I only hope to see the day these monsters are actually under serial production and in the TUAF's inventory.
 
Didn't they say they will put a real size mockup of TFX?
 
Was actually obvious that they will present it on a Defence Expo with more international attention.
 
KOTİL: ‘ MMU programında seri üretim uçaklarında her biri 30000 lb iki tane yerli motor olacak. Uçağım hangar çıkışının 2023, ilk uçuşun 2026, ilk üretimin 2029 yılı olması planlanıyor.’

TFX engines : 2x30000 lbs
 
KOTİL: ‘ MMU programında seri üretim uçaklarında her biri 30000 lb iki tane yerli motor olacak. Uçağım hangar çıkışının 2023, ilk uçuşun 2026, ilk üretimin 2029 yılı olması planlanıyor.’

TFX engines : 2x30000 lbs
any idea which engine it might be?
 
Back
Top Bottom