What's new

Lca Tejas SP1 - SP10 in pictures

Storm Force

BANNED
Joined
Sep 19, 2009
Messages
5,100
Reaction score
-66
Country
India
Location
United Kingdom
With SP11 & SP12 ready to be taken off production ramps it looks like the First Squadron could be ready by middle of next year with 16 single seaters & 4 twin seaters

No 45 squadron is rapidly approaching full strength

See the ;latest Tejas pictues of the TEN seriel production fighters


27709746306_4b53e16f97_b.jpg

1*8x_MRUPochqs11hyv9s5tg.jpeg

10-774429.jpg
 
Obsolete
 
Tejas+LCA.jpg


p1532601.jpg


http://www.***************/wp-content/uploads/2010/12/india-LCA-missiles.jpg


81853_1350624406.jpg




You have to qualify this statement

The Tejas is actually the most modern in south Asia in several key areas

The first with carbon composite airframe
The only fighter with a quadruplex FBW system
The lowest radar cross section of any fighter in south asia by some distance

IMG_0076-M.jpg



I MAKE THAT 5 Tejas in one flight

C4lYCYfWEAAzq0a.jpg:large

web4-2018-3-indian-defexpo-opening-flypast.jpg

excercising with the formidable SU30MKI
 
With SP11 & SP12 ready to be taken off production ramps it looks like the First Squadron could be ready by middle of next year with 16 single seaters & 4 twin seaters

No 45 squadron is rapidly approaching full strength

See the ;latest Tejas pictues of the TEN seriel production fighters


27709746306_4b53e16f97_b.jpg

1*8x_MRUPochqs11hyv9s5tg.jpeg

10-774429.jpg

how many are in operational squadron and what is the production rate of Tejas per year and how many squadrons it has to replace?
 
how many are in operational squadron and what is the production rate of Tejas per year and how many squadrons it has to replace?


The Daggers Squadron has 10 Tejas now RISING to 12 by December this year AND 16 by August 2019 with 4 twin seaters as training planes like these with each squadron

1_1488003568_1488003572.jpg



The production rate is currently 8 per year this year

12 PER year next as the second factory starts production

By 2020 it will 16 tejas each year from 2 factories.

India will have 40 tejas mark 1 by 2020-21

And further 83 more by 2027 of the AESA equipped mark 1a

The Tejas is replacing 125 mig21 bisons this project will be done by 2026-2027
 
The Daggers Squadron has 10 Tejas now RISING to 12 by December this year AND 16 by August 2019 with 4 twin seaters as training planes like these with each squadron

1_1488003568_1488003572.jpg



The production rate is currently 8 per year this year

12 PER year next as the second factory starts production

By 2020 it will 16 tejas each year from 2 factories.

India will have 40 tejas mark 1 by 2020-21

And further 83 more by 2027 of the AESA equipped mark 1a

The Tejas is replacing 125 mig21 bisons this project will be done by 2026-2027
Only 40 r confirmed right now,,,20 in IOC configuration n nxt 20 in FOC configuration,depending on if n when they get FOC,so there is no fixed timeline,,,n though IAF has shown intent to purchase mk1a based on the big promises of our dpsus,its nowhere near n will probably take another decade to qualify for production
 
Only 40 r confirmed right now,,,20 in IOC configuration n nxt 20 in FOC configuration,depending on if n when they get FOC,so there is no fixed timeline,,,n mk1a is nowhere near n will probably take another decade to qualify for production


The single biggest improvement is the Aesa Radar in mark 1a and a improved GE engine

Well the aesa radar is ready

see below

https://defenceupdate.in/indigenous...en-integrated-with-a-test-model-on-lca-tejas/
 
The Tejas is replacing 125 mig21 bisons this project will be done by 2026-2027
is it really possible to manufacture 125 jets by 2027 with 10 operational as of September 2018?

110-115 jets in 8 years?
 
The single biggest improvement is the Aesa Radar in mark 1a and a improved GE engine

Well the aesa radar is ready

see below

https://defenceupdate.in/indigenous...en-integrated-with-a-test-model-on-lca-tejas/
U need to read the aricle,,,radar has been integrated wid a TEST model,,,,they have been testing since ages.
N new engine means more testing n we know how dpsus maintain timelines,so a decade is actually optimistic
 
Notice the canards... which are lacking on tejas

Unless u add them ... it's an obsolete design...


Canards INCREASE RCS my friend
 
Canards INCREASE RCS my friend


U are building 4th or 5th generation??

By this arguement tejas must be better than j 10 euro fighter and Rafael.... wonder why all those engineers put cannards on their deltas
 
Back
Top Bottom