What's new

The two-seater Rafale for Egypt will be named Rafale DM

[Je pense aussi que "restitués" signifie que les Rafale prélevés (donc destinés à l'AdlA) seront donc 'rendus' plus tard par un autre lot sorti de chaîne] :confused:

we want to understand also :(
 
we want to understand also :(

The article says that Egypt accepted to wait some years to receive their first Rafale,so the Rafale taken from the French Air Force won't ben delivered to the EaF but the FaF. :yay: :bunny: :yahoo:

No joking,the article says that the Rafale taken from the French Air Force (to the Egyptian air force),would be delivered when the first Rafale built for Egypt would be delivered.
 
The article says that Egypt accepted to wait some years to receive their first Rafale,so the Rafale taken from the French Air Force won't ben delivered to the EaF but the FaF. :yay: :bunny: :yahoo:

No joking,the article says that the Rafale taken from the French Air Force (to the Egyptian air force),would be delivered in time of the Military programming law,in another batch.

thanks god for the spoiler button Lol

but anyway i wont fall in this as the planes now in Istres to clear the French roundel to paint the Egyptian roundel :devil::bunny:
 
The article says that Egypt accepted to wait some years to receive their first Rafale,so the Rafale taken from the French Air Force won't ben delivered to the EaF but the FaF. :yay: :bunny: :yahoo:

No joking,the article says that the Rafale taken from the French Air Force (to the Egyptian air force),would be delivered when the first Rafale built for Egypt would be delivered.

So we shouldn't expect anything in August?
 
so when the first Rafale built for Egypt would be delivered? :D

Don't worry,the Rafale (That were due to be delivered to the FaF) will be in EAF's hands in July-August,and the first 3 Rafale built specifically for Egypt,will be delivered in 2016. ;)

thanks god for the spoiler button Lol

but anyway i wont fall in this as the planes now in Istres to clear the French roundel to paint the Egyptian roundel :devil::bunny:

Very soon :nana:
 
Don't worry,the Rafale (That were due to be delivered to the FaF) will be in EAF's hands in July-August,and the first 3 Rafale built specifically for Egypt,will be delivered in 2016. ;)

Let's just keep it July we have a big day in August and they should be doubling the joy :big_boss:. Can't you just force EAF into signing a commitment that says that if Egypt paint it with that ugly orange painting the contract would be cancelled for god's sake? :o:
 
Let's just keep it July we have a big day in August and they should be doubling the joy :big_boss:. Can't you just force EAF into signing a commitment that says that if Egypt paint it with that ugly orange painting the contract would be cancelled for god's sake? :o:

Of course,We'll take them back,there's no way you give a sexy aircraft that dirty look.

1433615254-2hr7c7.jpg
 
Let's just keep it July we have a big day in August and they should be doubling the joy
There is no problem with that Desert Falcon God ;)
You will have 3 planes minimum and the pilots by the opening of the canal.
That was in the contract. The 3 in Istres are for sure and 2-3 more by year's end likely.
All the articles said was that you will then not get all those coming out of the plant in a
straight line to 24 before going to the Qatar deal because the Armée de l'Air needs some
to finish setting up its second nuke squadron o

So, at the end of the 2015 production year, the last 3 will go the French Air Force to cover
the 3 being painted that we took from our new stock for you to get them in time this summer
and it will be repeated at the end of 2016. A few coming out will also be Ms, the navy version
and those will not go to you either.
In short, instead of 24 for you then 24 for Qatar straight out, from 6 to 12 will still be delivered
to our guys until 2019-2020 on top of the M ones, both planned and F1 refit.

I hope it helps, Tay.
 
Last edited:
There is no problem with that Sinai Falcon God ;)
You will have 3 planes minimum and the pilots by the opening of the canal.
That was in the contract. The 3 in Istres are for sure and 2-3 more by year's end likely.
All the articles said was that you will then not get all those coming out of the plant in a
straight line to 24 before going to the Qatar deal because the Armée de l'Air needs some
to finish setting up its second nuke squadron o

So, at the end of the 2015 production year, the last 3 will go the French Air Force to cover
the 3 being painted that we took from our new stock for you to get them in time this summer
and it will be repeated at the end of 2016. A few coming out will also be Ms, the navy version
and those will not go to you either.
In short, instead of 24 for you then 24 for Qatar straight out, from 6 to 12 will still be delivered
to our guys until 2019-2020 on top of the M ones, both planned and F1 refit.

I hope it helps, Tay.

deliveries are on till early 2019 not 2020
 
deliveries are on till early 2019 not 2020
Fake rant and anger mode on.
:mad:Read again, you little egocentric twit :pissed: : will still be delivered to our guys:taz:
Our guys, not yours! :nono: Don't mistake my being open with feebleness, I' m still French.
images.png

Our means France and we already have more than 24 :p: and are getting more yet! :bunny:
Grrrrrrrrrrrrrr! :hitwall:

Fake rant and anger mode off.

:laugh: Gotcha bro, Tay. :victory1:
 
Back
Top Bottom