- Joined
- Jun 27, 2010
- Messages
- 130
- Reaction score
- 0
f-22-shortcomings
http://micom.net/oops/F-22 Crash.mp4
The United States' top fighter jet, the Lockheed Martin F-22, has recently required more than 30 hours of maintenance for every hour in the skies, pushing its hourly cost of flying to more than $44,000, a far higher figure than for the warplane it replaces, confidential Pentagon test results show.
The aircraft's radar-absorbing metallic skin is the principal cause of its maintenance troubles, with unexpected shortcomings -- such as vulnerability to rain and other abrasion -- challenging Air Force and contractor technicians since the mid-1990s, according to Pentagon officials, internal documents and a former engineer.
While most aircraft fleets become easier and less costly to repair as they mature, key maintenance trends for the F-22 have been negative in recent years, and on average from October last year to this May, just 55 percent of the deployed F-22 fleet has been available to fulfill missions guarding U.S. airspace. The F-22 has never been flown over Iraq or Afghanistan.
Sensitive information about troubles with the nation's foremost air-defense fighter is emerging in the midst of a fight.
"It is a disgrace that you can fly a plane [an average of] only 1.7 hours before it gets a critical failure" that jeopardizes success of the aircraft's mission, said a Defense Department critic of the plane who is not authorized to speak on the record. Other skeptics inside the Pentagon note that the planes, designed 30 years ago to combat a Cold War adversary, have cost an average of $350 million apiece and say they are not a priority in the age of small wars and terrorist threats.
But other defense officials -- reflecting sharp divisions inside the Pentagon about the wisdom of ending one of the largest arms programs in U.S. history -- emphasize the plane's unsurpassed flying abilities, express renewed optimism that the troubles will abate and say the plane is worth the unexpected costs.
The administration's position is supported by military reform groups that have long criticized what they consider to be poor procurement practices surrounding the F-22, and by former senior Pentagon officials such as Thomas Christie, the top weapons testing expert from 2001 to 2005.
'Cancellation-Proof'
Designed during the early 1980s to ensure long-term American military dominance of the skies, the F-22 was conceived to win dogfights with advanced Soviet fighters that Russia is still trying to develop.
Lt. Gen. Harry M. Wyatt III, director of the Air National Guard, said in a letter this week to Sen. Saxby Chambliss (R-Ga.) that he likes the F-22 because its speed and electronics enable it to handle "a full spectrum of threats" that current defensive aircraft "are not capable of addressing."
Its troubles have been detailed in dozens of Government Accountability Office reports and Pentagon audits. But Pierre Sprey, a key designer in the 1970s and 1980s of the F-16 and A-10 warplanes, said that from the beginning, the Air Force designed it to be "too big to fail, that is, to be cancellation-proof."
Skin problems -- often requiring re-gluing small surfaces that can take more than a day to dry -- helped force more frequent and time-consuming repairs, according to the confidential data drawn from tests conducted by the Pentagon's independent Office of Operational Test and Evaluation between 2004 and 2008.
Over the four-year period, the F-22's average maintenance time per hour of flight grew from 20 hours to 34, with skin repairs accounting for more than half of that time -- and more than half the hourly flying costs -- last year, according to the test and evaluation office.
The Air Force says the F-22 cost $44,259 per flying hour in 2008; the Office of the Secretary of Defense said the figure was $49,808. The F-15, the F-22's predecessor, has a fleet average cost of $30,818.
'Compromises'
Darrol Olsen, a specialist in stealth coatings who worked at Lockheed's testing laboratory in Marietta, Ga., from 1995 to 1999, said the current troubles are unsurprising. In a lawsuit filed under seal in 2007, he charged the company with violating the False Claims Act for ordering and using coatings that it knew were defective while hiding the failings from the Air Force.
He has cited a July 1998 report that said test results "yield the same problems as documented previously" in the skin's quality and durability, and another in December that year saying, "Baseline coatings failed." A Lockheed briefing that September assured the Air Force that the effort was "meeting requirements with optimized products."
There have been other legal complications. In late 2005, Boeing learned of defects in titanium booms connecting the wings to the plane, which the company, in a subsequent lawsuit against its supplier, said posed the risk of "catastrophic loss of the aircraft." But rather than shut down the production line -- an act that would have incurred large Air Force penalties -- Boeing reached an accord with the Air Force to resolve the problem through increased inspections over the life of the fleet, with expenses to be mostly paid by the Air Force.
Sprey said engineers who worked on it told him that because of Lockheed's use of hundreds of subcontractors, quality control was so poor that workers had to create a "shim line" at the Georgia plant where they retooled badly designed or poorly manufactured components. "Each plane wound up with all these hand-fitted parts that caused huge fits in maintenance,".
The plane's million-dollar radar-absorbing canopy has also caused problems, with a stuck hatch imprisoning a pilot for hours in 2006 and engineers unable to extend the canopy's lifespan beyond about 18 months of flying time. It delaminates, "loses its strength and finish," said an official privy to Air Force data.
In the interview, Ahern and Air Force Gen. C.D. Moore confirmed that canopy visibility has been declining more rapidly than expected, with brown spots and peeling forcing $120,000 refurbishments at 331 hours of flying time, on average, instead of the stipulated 800 hours.
There has been some gradual progress. At the plane's first operational flight test in September 2004, it fully met two of 22 key requirements and had a total of 351 deficiencies; in 2006, it fully met five; in 2008, when squadrons were deployed at six U.S. bases, it fully met seven.
Fatal Test Flight
One of the last four planes Gates supported buying is meant to replace an F-22 that crashed during a test flight north of Los Angeles on March 25, during his review of the program. The Air Force has declined to discuss the cause, but a classified internal accident report completed the following month states that the plane flew into the ground after poorly executing a high-speed run with its weapons-bay doors open, according to three government officials familiar with its contents. The Lockheed test pilot died.
Several sources said the flight was part of a bid to make the F-22 relevant to current conflicts by giving it a capability to conduct precision bombing raids, not just aerial dogfights. The Air Force is still probing who should be held accountable for the accident.
Last edited by a moderator: