Thanks both of you for clearing my doubt....One more question, Is there any possibility for India to built more than 126 rafales because india is getting TOT with Dassault, so it should replace Mirage 2000 and Mig 29 with rafales also + mass produce atleast 200+ otherwise what will be the use of TOT...?
dont confuse ToT with licensce to mfg
ToT means giving the knowhow of selected technologies nothing to do with building more rafales
Licensing for mfg means - right now we can build 108 rafales if we need to build more we have to pay extra and then obtain permission to build more and then build more
Both. You need to see this in context of threat perception and the time frame.
By the end of this decade, Mig 21 and 27 would be gone. Along with this J 17 will be fielded in large numbers along with newer generation Chinese fighters. These planes will make Jaguars in next decade or so obsolete.
now you need to consider what options you have to plug this gap.
Rafale owing to its omni-role capabilities will do so effectively. Also assuming it gets inducted from 2016, it will undergo its first upgrades 2025-26 onwards keeping it at par with anything 4.5 gen fielded in the region.
& when we talk of price tag, we must consider that it always is better to have a single fighter in inventory for a work which simplifies cost of flying and maintaining.
@TimeTraveller
when i asked why odes IAF want to replace low end Mig21 tihe rafels
you replied rafales are not replacing migs21 they will replace Jag + Mig27 & Mig21 will be replace by LCA
now your this question and this answer clearly indicates Mig21 will be replaced by Rafales - Why?
also
if LCA is the replacement for Mig21 and Mig21 are going to be retired by 2020-2022 then should we be ordering rafales (126) or ordering LCA Tejas in mass nos ?
make up your mind dont play IAF games
l
Last edited: