What's new

Photos : GSLV-D5 at the Launch Pad

thestringshredder

FULL MEMBER
Joined
Jun 24, 2012
Messages
1,254
Reaction score
1
Country
India
Location
India
GSLV-D5 Photos

gslv-d5-16.jpg

GSLV-D5 at the Second Launch Pad (Umbilical Tower)

gslv-d5-15.jpg

GSLV-D5 moving towards Launch Pad

gslv-d5-14.jpg

GSLV-D5 being moved from Vehicle Assembly Building to Launch Pad

gslv-d5-13.jpg

Fully integrated GSLV-D5 in the Vehicle Assembly Building

gslv-d5-12.jpg

Indigenous Cryogenic Upper Stage is being integrated with GSLV-D5 Second Stage


gslv-d5-10.jpg

Indigenous Cryogenic Upper Stage being lifted from its transporter at the Vehicle
Assembly Building

gslv-d5-9.jpg

Hoisting of GSLV-D5 Second Stage during Vehicle Assembly

gslv-d5-8.jpg

G
SLV-D5 Core Stage with four Strap-Ons at the Vehicle Assembly Building

gslv-d5-7.jpg

One of the Strap-on Motors of GSLV-D5 being integrated with the GSLV-D5 Core Stage

gslv-d5-3.jpg

Two Segments of the GSLV-D5 First Stage are being joined together at the Vehicle Assembly Building

Link - Welcome To Indian Space Research Organisation - Launch Vehicle - Image Gallery -
 
.
GSLV-D5 Photos

gslv-d5-11.jpg

One of the segments of GSLV-D5 First Stage being hosited during Vehicle Integration

gslv-d5-1.jpg

Nozzle End Segment of GSLV-D5 First Stage being placed on the Mobile Launch Pedestal


GSAT -14 PHOTOS


gsat-14-6.jpg

Two halves of GSLV-D5 payload fairing surrounding GSAT-14 satellite
gsat-14-1.jpg

Close up view of GSAT-14 in clean room

gsat-14-2.jpg

Solar Array Deployment Test of GSAT-14 in progress

gsat-14-3.jpg

GSAT-14 at Comprehensive Antenna Test Facility

gsat-14-5.jpg

GSAT-14 undergoing Electro Magnetic Interference & Electro Magnetic Compatibility Test

gsat-14-4.jpg

GSAT-14 undergoing Vibration Test


Link - Welcome To Indian Space Research Organisation - Launch Vehicle - Image Gallery -
 
Last edited:
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom