Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
They are already building ships don't have any free dry ports.Why Are These Jobs Not Being Given To KSEW???????
Why Are These Jobs Not Being Given To KSEW???????
They are already building ships don't have any free dry ports.
Head at ship yard is under construction.Then They Should Build More Dry Docks(It's Dry Docks) If There Is No Space In Karachi Then It Should Be Built In Gwadar
KSEW is being expanded. Dry Docks are not needed. It’s the ship lift and transfer system. It will allow KSEW to theoretically build 13 ship of 7000 ton range simultenously.Then They Should Build More Dry Docks(It's Dry Docks) If There Is No Space In Karachi Then It Should Be Built In Gwadar
İts a coastguard cutter, not a navy ship. They have different functions. Don't make sense to heavily arm it. Check any coastguard cutter and you won't find any heavy weapons on it.Are they going to put any weapons on??? Currently its completely un armed
The ship is armed with light weapons but not heavy ones.İts a coastguard cutter, not a navy ship. They have different functions. Don't make sense to heavily arm it. Check any coastguard cutter and you won't find any heavy weapons on it.
Are their any details of the plan that you can share? That confirms this 13 ship manufacturing setup. This is really interesting.KSEW is being expanded. Dry Docks are not needed. It’s the ship lift and transfer system. It will allow KSEW to theoretically build 13 ship of 7000 ton range simultenously.
Are their any details of the plan that you can share? That confirms this 13 ship manufacturing setup. This is really interesting.