What's new

Only SSM budget for development programs in 2012 : 6 billion TL

cabatli_53

ELITE MEMBER
Joined
Feb 20, 2008
Messages
12,808
Reaction score
62
Country
Turkey
Location
Turkey
SSM budgets 2012 on Turkish Lira base reserved for: (note these are 1 year budgets only for 2012)

- 494,18 mln (Tank development budget)
- 1.221 mln (Milgem serial production + Feasibility research for indigenous submarine development)
- 338 mln (general purpose helicopter + Atack helicopter + design of indigenous light general purpose helicopter)
- 1.163 mln (TX and FX concept design + Hurkus serial production)
- 193,7 mln (tactical UAV + ANKA serial production)
- 1.395 mln (guided missile developments: UMTAS, OMTAS, CIRIT serial prod., short and medium range airdefence systems)
- 193,8 mln (SAR sattelite development)
- 0 (phased radar development)
- 494,2 mln (diesel powerpack family development: engine + transmission)
- 552,3 mln (Turbo jet engine prototype design)

In additions There are lots of co-production/domestic programs under production phase, paid by SSM...
 
.
Further projects that are intitiated

- 0 Test facility for armoured vehicles (mine blast tests)
- 0 High speed wind tunnel
- 0 test facility for aircraft
- 0 test facility for missiles
- 193,8 mln UMET (sattelite facility for montage, integration + tests)

- 552,3 mln (Turbo jet engine prototype design)

WTF They are developing with such a big budget for design phase of a turbo-jet engine ?
 
.
there is no bases. We dont have machine, no factory, no assembly line etc etc. We start from zero.
 
. . .
Assembly line means a new machine, personal, place etc etc. In the beginning you can design and the parts can made by someone else. When its succesful you can begin with production line. The uav anka is made the sameway. Do you think they gonna spent milions for something that isnt designed?
 
.
Good,there is only 28bl japan yen a year for development
 
. .
Back
Top Bottom